TESTING OF KGPS FOR TIDE APPLICATION TO HYDROGRAPHIC SURVEYS BY THE NAVAL OCEANOGRAPHIC OFFICE.

Slides:



Advertisements
Similar presentations
Using GNSS to establish a Height Datum on a Survey
Advertisements

Scheduled for HYPACK 2011 Release
Site Calibration for 3D GPS Operations
Transfer of Datum for Hydrographic Surveys
T GPS Fundamentals Your location is: 37 o ’ N 122 o ’ W.
Tidal Datum Computation January 8, 2009 Center for Operational Oceanographic Products and Services.
ADJUSTMENT COMPUTATIONS
RTK Developments from NavCom Technology Inc. RTK GPS for Hydrographic Surveys and Seamless Vertical Datums Workshop NASA John C. Stennis Space Center 27.
A comparison of error budgets for vertical positioning using traditional and RTK GPS approaches USM GPS workshop March 16-18, 2004 R.M. Hare, P.Eng., C.L.S.
“Eternity begins and ends with the ocean's tides.”
VORF: Vertical Offshore Reference Frame
PRIMARY VALIDATION OF WATER LEVEL DATA OBSERVED DATA MAY BE SUBJECTED TO ERRORS *RANDOM, SYSTEMATIC AND SPURIOUS *AIM OF VALIDATION IS TO DETECT SYSTEMATIC.
NAVIGATION SYSTEMS How using a “PATROL WORKSHEET” for a predefined Patrol Area will improve your report accuracy. Prepared by the First Northern Navigation.
Tidal Datums Text and Figures Source: NOAA/NOS CO-OPS Tidal Datums related publications.
Application of Post-Processed Navigation, Motion and Tide Data to Multibeam Surveys using Applanix POS/MV Dushan Arumugam Doug Lockhart Carol Lockhart.
Coastal Zone 2011 Conference “Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA, Presentation 1)TOOLS TO OBTAIN GEODETIC CONTROL.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.
RAPID-MOC Mooring Array Instrumentation l Instrument types and specifications l Telemetry.
1 GPS processing. Sat05_82.ppt, Directly from the observations 2.From differences (especially if vectors between points are to be determined)
Antenna Baseline Measurement System 29 January 2010 Mark Phillips, Research Assistant Ohio University, Athens OH Research Intern Naval Research Laboratory.
Geographic Datums Y X Z The National Imagery and Mapping Agency (NIMA) and the Defense Mapping School Reviewed by:____________ Date:_________ Objective:
Lawrence H. Haselmaier, Jr. Computer Scientist Naval Oceanographic Office 7 August 2014.
Principles of Sea Level Measurement Long-term tide gauge records  What is a tide station?  How is sea level measured relative to the land?  What types.
Introduction.
NAVO/PSI Buoy. Equipped with RTK GPS Rover Receiver, Buoy attitude and motion sensors, data acquisition system, and telemetry system. Reference Station.
Principles of Surveying
Relating Data to a Seamless Vertical Reference Surface
AV Training Presentation Seven Taking and Reporting Depths to a Government Agency.
VDATUM: the Vertical Datum Transformation Tool
Planning for airborne LIDAR survey Dr.Lamyaa Gamal El-deen.
Tsunami Warning System Elements IOC Assessment Mission to Indonesia 29 August-1 September 2005.
ODINAFRICA/GLOSS Sea Level Training Course
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
Mr.Samniang Suttara B.Eng. (Civil), M.Eng. (Survey) Topcon Instruments (Thailand) Co.,Ltd. Tel Satellite Surveying.
Lecturer: Jinglin Wang Student name: Hao Li Student ID:
Session II Nautical Charts Objectives F To become familiar with: – data found on Nautical Chart and how it relates to GPS and the AtoN Program. –how.
Tide corrections from KGPS and a precise geoid John Brozena, Randy Herr, Vicki Childers.
1 POS MV Vertical Positioning March Where we fit in! “Other sensors (notably modern heave-pitch-roll sensors) can contribute to achieving such.
Lecture 18: Vertical Datums and a little Linear Regression GISC March 2009 For Geoid96.
Fugro Chance Inc. Comparison of Network and State Space DGPS Services Real Time Tidal Monitoring for Seismic Data Collection Applications Richard Barker.
Naval Oceanographic Office Charting Products Division (N43) Naval Oceanographic Office Hydrography Department upgrades to its Positioning Systems and Hopes.
GPS Workshop 2004 RTK-GPS Activity at the University of New Hampshire.
Marshall Earle, Ph.D., Principal Investigator Mike Brown, Lead Electrical Engineer Jeffrey Gallagher, Electrical Engineer (Bill Hughes, Lead Mechanical.
Shape of the Earth, Geoid, Global Positioning System, Map Coordinate Systems, and Datums Or how you can impress your friend on a hike D. Ravat University.
U.S. HYDRO 2007 TIDES WORKSHOP May 17, 2006 UNCERTAINTY WORKSHOP SKGILL SLIDES.
Lecture 5 – Differential Correction
United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 11 Navigation Post-Processing for Ellipsoid-Referenced.
University of Southern Mississippi Canadian Hydrographic Service
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Laura Rear McLaughlin Center for Operational.
GPS Services Group C&C Technologies, Inc., C-Nav GcGPS System Background and Accuracy.
National Ocean Service NGS, NOS, NOAA Real-Time GPS Positioning of Ships To Integrate Navigation Services Real-Time GPS Positioning of Ships To Integrate.
Session III GPS DEPTH-FINDER UNITS. F GPS positions are not error free –User and/or Satellite clock bias. –Satellite signal can be blocked. –Atmospheric.
CE 453 – Horizontal / vertical reference systems and mapping.
Tide corrections from KGPS and a precise geoid
Navigation NAU 102 Lesson 5. Chart Editions You must use the latest chart! Date and Edition Number are on the chart New editions issued due to many changes.
The Delta Levees Program
INERTIAL AIDED POST PROCESSED KINEMATIC GPS FOR MARINE POSITIONING An Overview of POSPac MMS Lou Nash, Measutronics Corporation
WATER LEVEL OPTIONS. Water Level Corrections Water Level Above Chart Datum = Negative Tide Correction! In Depth Mode:  Chart Sounding =  Measured Sounding.
Lessons Learned Tether all equipment that goes in the water Revisit the Bow mount, do not use side mount Bow mount needed to be strengthened Patch test.
Geodetic Research Laboratory Department of Geodesy and Geomatics Engineering University of New Brunswick 2/20/2016 K. Cove 1 Carrier Phase Differential.
Project Update and 2014 Plans Jack Riley and Bryan Murray, HSTP.
RTK TIDES.
SC – VRS Network To Support Surveying and Machine Control.
Unit 2.b. Phases of a Hydrographic Survey Captain M K Barritt RN.
Satellite Network. Satellite Network 24 satellites in orbit, plus 3 backups lbs, solar powered Orbit height is roughly 20,000 km (Earth radius.
Datums and Tides Mean Low Tide versus Mean Lower Low Water And the winner is……….!
WATER LEVEL OPTIONS. Water Level Corrections Water Level Corrections Water Level Above Chart Datum = Negative Tide Correction! In Depth Mode:  Chart.
Total Station Surveying
Uchenna Nwankwo, Stephan Howden and Dave Wells
Alaska Heights Workshop
Presentation transcript:

TESTING OF KGPS FOR TIDE APPLICATION TO HYDROGRAPHIC SURVEYS BY THE NAVAL OCEANOGRAPHIC OFFICE

Objectives of the Test Plan are to determine: - Accuracy - Methods - Procedures

LSU-1 Tide Gage 7 N.M. ACOE Tide gage 10 N.M. Gulfport Base Station

KGPS Buoy Tide gage GULFPORT Base Station

Test Plan: - Establish an offshore tide gage - Measure the distance between spheroid and chart datum at the gage - Place a KGPS buoy alongside the tide gage - Run survey lines near the buoy in kinematic mode to correct for tides (Real time and post-processing) - Compute buoy chart datum distance from spheroid and compare to tide gage distance - Compare kinematic tide corrections to tide gage corrections

KGPS Buoy built by Planning Systems Incorporated

BUOY CAPABILITIES Buoy Dimensions: Hull diameter 6.25 feet Overall height: 17 feet Weight: 900 lbs Sensors: 3-axis Acceleration 3-axis Magnetometer Vertical Reference Hull depth pressure sensor GPS- Novatel OEM4 L1/L2 with GPS600 antenna CPU and 20 GB HDD Power: Four solar panels Sealed batteries Warning system: Flashing obstruction light Radar reflector

WGS-84 Ellipsoid Buoy phase center Water surface Observed MSL Chart Datum b C + accel. & tilt corr. Zoo - s t a. s = seasonal change n= no.of obs. Z oo = distance of long term MSL to chart datum C = vertical distance from phase center to water surface while stable

ERROR SOURCES: - Squat-settlement will have to be removed from GPS height results to make a direct comparison with the tide gage. - Measured vertical distance at offshore gage from the GPS antenna to zero of gage not easily measured. - Receiver noise, multipath and distance from base station result in errors in GPS - Error occurs in datum transfer of chart datum - Acceleration and tilt errors occur at the buoy and vessel - Other systematic and random errors are possible