EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: JULY 8, 2011.

Slides:



Advertisements
Similar presentations
 Pascack Valley Cooperative Road Improvement Program ◦ $ 350,000 ◦ $ 325,000 ◦ $ 130,000 ◦ $ 768,000 ◦ $ 510,000 
Advertisements

Presented by Lynley Doyen, Water Program Liaison Field Operations Support Division Water Quality Advisory Work Group January 25, 2011 Austin, Texas.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 12, 2010.
Orange County Budget Budget Worksession Summary July 18, 2013.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Cherokee Bend Phase II, Roadway Pavement: Atoka Trail Request to Complete Roadway Pavement of Atoka Trail to Live Oak Church Road Shoal Lake Homeowners.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
Vineyard Planting in Sonoma County Nick Frey Sonoma County Winegrape Commission.
Pipeline Possibilities by Judith and R. Doug Pew.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
ANNUAL REPORT Monitoring Reports 2010 Monitoring Reports 2010  Every month SSD is required to send a monitoring data report to the State Water.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners September 11, 2012.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2009.
Community Development Department Construction Phase.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Big Walnut Local School District Monthly Financial Summary May 2015.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2010.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
Orange County Public Works Board of County Commissioners Presentation January 5, 2016 Board of County Commissioners Presentation January 5, 2016 Roadway.
Lucy Martin. Graham is the county seat of Alamance County Located in the northern Piedmont of NC.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 10, 2006.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
1 Lockheed Martin TLS Visitor Maps & Directions Orlando, FL.
Monday-Thursday Route Participants Agusta Ct Agusta Ct Baltusrol Drive Baltusrol Drive Barnes Lane Barnes Lane Beverly Road Beverly Road Brae Burn Drive.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Waterways Management Monthly Report Council Briefing December 12, 2012.
Molly Kline, Project Manager
City Council Work Session July 5, 2017.
Highway 110 Project Update
Wakerobin/Cedar Cove Stream Restoration Assessment
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
BUDGET DEVELOPMENT FY TOWN OF WAXHAW BOARD RETREAT January 19, 2017
FIRE ALARM / FIRE SPRINKLER SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-19-1 MAJOR MAINTENANCE FY BRAINERD AVENUE
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
SUNCREEK ESTATES Section 1
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
Meadow Lane – Brandon Road Improvements Welcome!
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-23-1 MAJOR MAINTENANCE FY 16 63AB HOME AVENUE
The Lake Norman 2017 Mid Year POA Status Meeting.
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
Monterey County Project Report for Measure X Expenditures
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Presentation transcript:

EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: JULY 8, 2011

FY 2010 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1 MANHOLE REPAIRS TAB 2 TV INSPECTION TAB 3 ROOT CONTROL TAB 4 HYDRAULIC CLEANING TAB 5 EASEMENT CLEARING TAB 6 AERIAL STREAM CROSSING INSPECTIONS TAB 7 COMBINED TOTALS BY FISCAL YEAR TAB 8

MANHOLE INSPECTIONS INFLOW/INFILTRATION SECTION3,682 SYSTEM MAINTENANCE 17 TAB 1

MANHOLE REPAIRS CONTRACTED (RAISED) 610 GENERAL MAINTENANCE 30 TAB 2

TV INSPECTION INFLOW/INFILTRATION SECTION 53,579’ SYSTEM MAINTENANCE 96,376’ TAB 3

ROOT CONTROL PHASE 1 98,252’ ANDERSON MILL ROAD ASQUITH AVENUE BARRIER COURT BLACKWILLOW DRIVE BREAKWATER TRAIL CALVARY HILL COURT CAROLINA ROAD CLARE COTTAGE CUNNINGHAM ROAD DEBBIE DRIVE DRIFTWOOD DRIVE ENCHANTED WOODS HAMPTON VIEW COURT JAMERSON FOREST JODY DRIVE LANTERN LANE MARTIN ROAD MULKEY ROAD PEDRO DRIVE SEAYES ROAD THRASHER DRIVE WESTWARD DRIVE WINFIELD DRIVE PHASE 2 377,077’ ALCOTT DRIVE AIRCRAFT DRIVE ATLANTA COUNTRY CLUB BEN KING ROAD BIRCHWOOD LANE BOGGS ROAD BUNKER HILL CIRCLE CARRUTH DRIVE CHISHOLM TRAIL DOGWOOD TRAIL FAVORWOOD DRIVE FREY LAKE ROAD GRANT DRIVE HICKS ROAD LAKESHORE DRIVE MILFORD CHURCH PINETREE COUNTRY CLUB SEMINOLE CIRCLE SWEETBRIAR DRIVE TIMBERLAKE ROAD TIMBERLY DRIVE VALLEY VIEW DRIVE VANGUARD CIRCLE WALNUT CIRCLE WICKS LAKE DRIVE WIMBLEDON DRIVE TAB 4

HYDRAULIC CLEANING GENERAL MAINTENANCE 246,039’ (COUNTY WIDE) TAB 5

EASEMENT CLEARING Quarterly Total YTD Quarter 1898,216’898,216’ Quarter 2321,268’1,219,484’ Quarter 3458,778’1,678,262’ Quarter 4 TAB 6

AERIAL STREAM CROSSING INSPECTIONS INFLOW/INFILTRATION SECTION 713 SYSTEM MAINTENANCE 11 TAB 7

Totals by Fiscal Year Linear Feet TAB 8

Each Totals by Fiscal Year TAB 8

Totals by Fiscal Year Tab 8 Each