TS planning meeting 7 to 11 Nov 2011. Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.

Slides:



Advertisements
Similar presentations
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Advertisements

TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
TS1 preparatory meeting A.Tauro. General information TS1 week 25: 15 to 19.6 LHC beam stops on Monday morning at 6:00 AM. Cavern access starts.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 7&8 A.Tauro
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
winter shutdown planning A.Tauro
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
ALICE 5 o’clock meeting Wk 49
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Technical Support Activities in PH-ADO-PO
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
ALICE 5 o’clock meeting Wk 49
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
EYETS planning A.Tauro.
ALICE 5 o’clock meeting Wk 51.
ALICE planning meeting
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
ALICE 5 o’clock meeting Wk
ITS Cooling: Xmas Plan Claudio Bortolin.
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
ALICE 5 o’clock meeting Wk
November technical stop activities:
Presentation transcript:

TS planning meeting 7 to 11 Nov 2011

Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search (Arturo and Philippe): Mon 8:30 – 9:15 Access starts Mon at 9:15 No access during the following periods: – Tuesday 7:00 to 9:00: periodic maintenance lift (AS703) – Thursday 6:00 to 9:00: leak test on FB pipe. No access, exceptions to be agreed with TC – Whole Friday morning (tbc depending on TPC progress): GS-ASE will install and test new sirens in UX25 for the evacuation alarm

CV Primary cooling: – Intervention SF2. Should not impact ALICE Detector cooling (see next slide): – HMPID: replacement liquid sensor – SSD-SDD: replacement SSD T sensor – SPD: replacement pump

Activity Détector cooling Cooling Monday 7-Nov-2011Tuesday8-Nov-2011Wed 9-Nov-2011Thu 10-Nov-2011Fri 11-Nov-2011 MorningAfternoonMorningAfternoonMorningAfternoonMorningAfternoonMorningAfternoon SPD RP AnalysisReplace Pump “B” and test it SSD/SDD RP Analysis Disconnect temperature transmitter and heaters HMPID RP Analysis Replace level transmitter TRD RP Analysis Maintenance on station Cooling in run Cooling in stop 03/11/2011S.ROUSSEE EN/CV/DC

Detector activities TPC: – Replace FEC (2 shifts from and from from Mon to Thu) – Fix leak on heat screen loop TPC laser: – Access to laser hut: about 2-3 hours to check out the laser system MTK: – Low voltage maintenance ST1-2 – Need light FASS – New CROCUS cable ST4 (SPIE). VIC needed, waiting for more info – Check BUS-patches in ST2 – Remove cable lying on L4 gangway ZDC: – Replace card in rack (C-side) ? TRD: – Check switches in I-/O-/C-side racks – Check LV connections in sectors (C-side). Tighten connections.

Detector activities MTG: – MT12-OUT-RPC6: HV cable check and eventual replacement; for this activity one nacelle is needed – Gas: activity in CR5 and eventually at the distribution rack in the cavern side C, level 0 (PH-DT). There is not gas activity foreseen on the RPCs – Check possibility to modify SAA3 shielding (Thu AM) EMC: It should be only a half day of effort (probably on Mon afternoon): – Check and possible replacement of 1 RCU board from EMCal super module – Check communication link (cable) between one TRU module and STU module. Repair cable if necessary – Verify possibility to displace fibers (should be done in winter shutdown)

Detector activities TOF: replace DC/DC converters (Tue) – Move 2 SMs (1 and 10) ITS (see Claudio’s presentation): – SSD: Replace FEROM AD module on side A racks (Tue) Check connection T sensor on cooling plant – SDD: replacement board Med5 (tbc) – SPD: ultrasound cleaning ACO: – Calibration test to the electronics systems (rack O14 on Level-4) – Check 2 ACORDE modules that are not working properly T0: checking laser system and electronics

Watcher schedule MonTueWedThuFri 8:00 – 12:00 TOF EMCTPC 12:00 – 16:00 TOFTPCTRDTPC 16:00 – 20:00 TOFTPC

Other activities TE-VSC: inspection GIS setup (Tue) BE-ABP: check hydrostatic leveling system EN-HE: – Mount crane electronics (Mon AM) and dismount it on Fri (tbc) – Load test cavern cranes (Tue, PM) – Maintenance SX2 crane (wk 48) EN-EL: inspection PHOS cooling plant (UPS) GA-ASE: maintenance PX24 access system (faulty biometric scan). Access will not be stopped Intervention on the GSM and phone systems foreseen for all CERN on Wed VIP visit (France 5) on Nov 9 th at 11:00

TC & P2tech Inspection 5 TPC bottom sectors – Thu 14:00. Ton, Borge and Luciano S. Removal old fire detection pipes (Philippe) Identify gas spare pipes (Philippe) ADC access (Didier) Designer (Al) + TC: check L3 fences, DCal passage, SAA3 modification, TRD installation TC: look at TRD scaffolding (needed for Christmas)

AOB TRD: delivery next module around 17 Nov Dcal: – Delivery beams to SX2 wk 44 and load test wk in 46 TRD: – Counterweight test wk 47 – Reinforcement of frame ongoing. Test wk 48 (tbc)