Bruxelles, 29/30 th January, 2014 Report on TSI OPE revision RISC 69 th.

Slides:



Advertisements
Similar presentations
EIMS EXPECTATIONS FROM CROSS-ACCEPTANCE WORK CROSS-ACCEPTANCE SEMINAR 17 NOV PHILIPPE GALLEY-EIM/RFF.
Advertisements

Manitoba School Bus Pre-Trip Inspection
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Signal Basics. Signals: –Allow for safe operation of trains – protecting your train, other trains, and the equipment –Lets the railroad operate more efficiently.
REEP A Process Model for Developing and Implementing Collectively owned enterprises in rural areas (AgriSETA Workshop: Premier Hotel O.R. Tambo) 21 September.
Reference Document Management 1 European Railway Agency (ERA) Cross-Acceptance Unit P. Mihm 17/11/2010.
IRSC DUBLIN OCTOBER 2006 vue n°1 INTERNATIONAL RAILWAY SAFETY CONFERENCE Dublin 23 – 25 october 2006 CIRCULATION OF TRAM-TRAINS ON THE FRENCH NATIONAL.
JAA 19th Annual FAA/JAA International Conference 1 TRANSITION FROM JAA to EASA Institutional changes in Europe Klaus KOPLIN JAA Chief Executive.
COMPRIS Demonstrator, Bratislava, 30th September 2005page: 1 Cross Border Information Services Lucia Karpatyova VUD – Transport Research Institute.
The Future – the “Roadmap” SIMPLIFICATION. The Road Map 2 TSI in Place Hi Speed Conv Loc & pass Off TENS TSI Conformity New Vehicles Networks Open pointsUpdates.
REMOVING BURDENS – a European rail system fit for the future Thierry Breyne – European Rail Agency - Head of the Safety Unit International Railway Safety.
The Quality Management System
NETWORKING CONCEPTS. Data Communication Communication is for sharing information Sharing can be local or remote Local communication between individuals.
Key changes and transition process
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
Managing Software Quality
IRSC – Goa, 30 Sept – 6 October ‹#› The Rail Sector and the European Rail Safety Directive Simon Fletcher Senior Safety and Interoperability Manager,
We increase the impact of marketing measures and enhance our customers’ brand value. In order to achieve this goal we combine market research and consulting.
RAILWAY UNDERTAKINGS & INFORMATION EXCHANGE ICT Interoperability Issues in Rail Freight - European Railway Conference.
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Implementation of EU Electronic Communication Directives.
Drive Right Chapter 7 Negotiating Intersections Unit 4
Delaware Health Benefit Exchange (HBE) Marketplace Assister Certification Delaware Health Care Commission Meeting: January 3, 2013.
Cluster Management Scorecard FITT (Fostering Interregional Exchange in ICT Technology Transfer)
Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.
1TAP Masterplanning kick-off25 September 2012 TAP TSI Masterplanning Overview of RU/IM obligations Masterplanning Kick-off Brussels, 25 September 2012.
Movement on Noise Regulation – Alignment with R 51.03
European Commission 1 TSM Regulation: Spectrum Briefing on Telecoms Single Market Package Anthony Whelan Head of Unit – Spectrum Electronic Communications.
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
THINK*PAIR*SHARE Why do you think the chances of a collision are greater at an intersection than at any other point on the roadway? (Your answer should.
IntelliDriveSM Update
Chapter 43 Emergency Vehicle Operations. © 2005 by Thomson Delmar Learning,a part of The Thomson Corporation. All Rights Reserved 2 Overview  Readiness.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
New Rail Market Access Rules Directive 2012/34/EU (recast) EUROPEAN COMMISSION.
UIC ERTMS World Conference ERTMS Baselines Pio GUIDO, Head of ERTMS Unit Istanbul, 2 April 2014.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
Safety, Interoperability, Passenger Rights and Rail Regulation Page Facing the Challenge: Cleaning up the National Vehicle Rules.
LECTURE 4: ICAO CHART requirements
Malcolm Crompton APEC Information Privacy Framework: review, impact, & progress APEC Symposium on Information Privacy Protection in E Government & E Commerce.
1 Standardisation, Assessment, and Certification Legal Framework, Standards  Measurement Instrument Directive (2004/22/EC)  Interoperability Directive.
SAFETY MANAGEMENT SYSTEM IN TURKISH STATE RAILWAYS (TCDD)
General Meeting Florence Secretary General report on Items 5 of the agenda Imrich KORPANEC.
We increase the impact of marketing measures and enhance our customers’ brand value. In order to achieve this goal we combine market research and consulting.
109 July 2009CER The Voice of European Railways Cross Acceptance CER Expectations ERA Seminar, Lille, Libor Lochman.
We increase the impact of marketing measures and enhance our customers’ brand value. In order to achieve this goal we combine market research and consulting.
John Batty DEFRA UK Bratislava November Legal Background For any given surface water body, applying the MAC-EQS means that the measured concentration.
Workshop accreditation and recognition / conformity assessment Removing Technical Barriers - TSIs within New Approach and Safety Directive Dr.-Ing. Andreas.
1 The WTO Agreement on Technical Barriers to Trade Basic Concepts and Member Obligations.
PERFORM THE TASKS AND FULFILL THE RESPONSIBILITIES OF RANGE PERSONNEL PO/EO: REF.: B-GL /TS-000, TRAINING SAFETY.
SCOTTISH BORDERS SAFETY FORUM WORKING SAFELY WITH WORK EQUIPMENT Compiled by Donald A Mackay Mainetti UK Ltd.
UIC ERTMS CONFERENCE 2006 – BUDAPEST 5 th April 2006 Operational Interoperability through ERTMS.
09/02/2018 6th ERA TAF TSI Regional Workshop (EE, LT, LV, PL) The Content of TAF TSI   ERA Telematics Team Warsaw September 2017.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING
Guide for the application of CSM design targets (CSM DT)
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
"Step by Step" Guide to implement TAF TSI
4th Railway Package – Implementation of the Technical Pillar
Session II: System authority for ERTMS 4RP Trackside approval
Network/route compatibility
ERA Seminar Cross Acceptance Ad hoc Summary
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
ATO over ETCS Benoît BIENFAIT 10/2/2016.
Ground Guide Procedures. Ground Guide Procedures.
Communication and Consultation with Interested Parties by the RB
Thursday’s Lecture Chemistry Building Musspratt Lecture Theatre,
Envelope Concept report, PCS UG
Working Group on Rail Transport Statistics:
Fourth Railway Package Technical Pillar Hearing at the European Parliament, Brussels 7 May 2013 José GORTAZAR Chief Technical Officer, CAF.
ACSF B2 SAE Level 2 and/or Level 3
Presentation transcript:

Bruxelles, 29/30 th January, 2014 Report on TSI OPE revision RISC 69 th

Focus of the revision Appendix B “Other rules enabling a coherent operation” Appendix C “Safety related communication methodology” Appendix D “Information to which the RU must have access in connection with the route(s) over which he intends to operate” Appendix T “Braking performance” Train rear end signal for international & domestic freight trains TSI RISC2

Appendix B New: common operational principles and rules -Methodology was agreed (and presented here with ERA’s intermediate report) -Comments were taken into account -Start of inventory of existing operating procedures -Risk-based approach  General principles in form of operational requirements  Appendix B – common operational principles and rules TSI RISC3

Topics covered in the revised Appendix B Top/down and Bottom up approach Transfer from Appendix A to Appendix B Transfer from Appendix A to Appendix C No common basis – postponed to a future revision Passing a signal at stop aspect with authorisation running on sightWritten ordersrunning with caution Failure of level crossingEmergency call Procedure for arrival Complete failure of front end lights No authorisation for train movement at the expected time Speeds in degraded mode Failure of voice radio communication (including GSM-R) Departure of a train Immediate actions to prevent danger to trains Failure of the audible warning device Failure/missing rear end signal Anomalies in lineside signalling Assistance to a failed train TSI RISC4

Appendix C Safety related communications methodology Cleaned, clarified and restructured Predefined messages mostly kept in TSI Agreed to request a study on communication methodology with a specific target on the safety benefits of predefined messages Background: – CER wants to delete predefined messages in the TSI due to doubts on the benefits – ERA regards them as important, especially for those working in other than mother tongue – Some IMs have introduced predefined messages and strongly support them TSI RISC5

Appendix D Elements the Infrastructure Manager has to provide to the RU for the Route Book and for the train compatibility over the route intended for operation Before: collection of data elements that are – Necessary for train planning – Part of the RINF – Necessary for train operation – Not relevant at all Now: 2 sets of elements relevant for – RU’s preparation of the driver’s route book – RU’s check of train’s compliance with the path TSI RISC6

Train rear end signal - Invitation to clarify/amend operational rules in order to accept plates on all networks when acceptable -Rear end signal for freight trains crossing borders must be accepted for domestic freight trains as well, existing solutions may continue -  implicit transition periods with a clear target TSI RISC7

Appendix T  Braking performance 1 st step in 2010/314/EC: – IM defines the required braking performance, RU defines the rules of train calculation and fulfils IM’s requirement. 2 nd step now: – IM delivers the track side information (gradients; speeds, stopping distances with safety margins) – RU calculates the required braking performance and ensures that the train fulfils the requirement – Existing braking tables can be used TSI RISC8

New standard procedure TSI RISC line characteristics + line safety margins IMRST marginsRU necessary train braking performance RU Can the train fulfil it? RU Ensure that train achieves necessary brake performance during operation RU appropriate measures + no yes planning In case BP not achieved during operation 9

In summary TSI RISC10 TSIs RST allow for new developments Capacity needs new developments RUs are looking for efficiency and safety at the same time Technology allows new solutions Restriction to old solutions like existing braking tables Forcing IMs to follow RST developments for braking performance Obliging IM to take responsibility for RST-related calculations (required braking performance) SMS shall support improvements and internal transparency Recommended revised Appendix T shows a way out for the future allowing IMs and RUs to agree on a transition period (without limitation)

COMMENTS OR QUESTIONS ? TSI RISC11