Claudio Bortolin – CERN. Y. Lesenechal started some tests last week (drill, twisted wire and a lot of patience): Ø ~ 1,2 mm Twisted wire + carbide drill.

Slides:



Advertisements
Similar presentations
Coat Hook Revision Notes
Advertisements

Manufacturing. Frame I manufactured large portions of the frame at home as I felt this was easier done at home an I felt the lab times could be better.
Forging- Bending Drop Twisting and Scrolling
1 INGSM 14, Seattle NOT PROTECTIVELY MARKED BEG/FORM/COMM/026A REV 007 Graphite Core Inspection, Measurement of Brick Stress M Brown – EDF-E E Kingston.
Machining Two introductory projects 1.Support post for mirror mount 2.Vertical micro-rail mount.
Advanced Maintenance Provider  Aeration Equipment …
 A 'heat exchanger' may be defined as an equipment which transfers the energy from a hot fluid to a cold fluid. Here, the process of heating or cooling.
Optimizing power to the detectors To avoid dark-current errors and bit-noise errors in your data, all four PSD detectors need a high SUM reading. However.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
DCP Meeting – September 12 th 2010 WP1/4: Leak Search & Repair- Paolo Petagna 1/9 PH-DT - WP1: REMOTE LEAK REPAIR- Update Report on status of leak analysis/quantification.
Weld Types – Butt Joint with Backing
Drill, Tap, Die & Eye.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
1 ME 330 Introduction Revision For the final exam Contact: Marker:
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Griner Drilling Service
LASER BEAM MACHINING BY S.PREMKUMAR.
Gage Blocks Unit 12.
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
Drills and Drill Press Safety in the Lab
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
CLAUDIO BORTOLIN SPD Cooling Status INFN – PD / CERN.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Competency 7.00 Competency 7.00 Develop an Awareness of the Designed World CommunicationTransportationManufacturingStructural Energy and Power Biotechnology.
Cold Metalworking Processes TSM 233 Unit 10. TSM 233 Metallurgy and Welding Processes Cold Metalworking Those metalworking processes where the base metals.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
Welding Trades Mild Steel Welding Copyright © Texas Education Agency, All rights reserved.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
1 CERN - 19/03/2016 Claudio Bortolin CLAUDIO BORTOLIN INFN – PD / CERN.
Case Study 3.1 WP Inc MGMT 580 – Quality Management and Statistics Group 3: Cody Groves, Bruce Kastner, & Heather Moore.
SAFE WORK PRACTICES IN AGRICULTURAL MECHANICS AG MECH II.
Hand Drilling Machine.
M EASUREMENT AND OPTIMIZATION OF DRILLING PROCESS PARAMETERS Presented by:  Rahul Bhat  Hardik Thummar  Maunik.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
ECAL LED monitoring system upgrade status 04/09/20131.
Automotive Engines Theory and Servicing
ULTRASONIC MACHINING PROCESS Prepared by B.BALAMURALI AP/MECH
Stato del sistema di raffreddamento del rivelatore SPD di ALICE
Shenzhen Rapid Tooling Co., Ltd.
By Martinus Bagus Wicaksono
Canta Open Canal Manufacturing Procedure
THE COMPANY OPTIKRON, your partner for micro-optics, assemblies and optical coatings was founded in 1992 in the optics and technology region of Jena. We.
Bonding study of wrapping part of PA1/2
CLEAN UP & INSPECTION.
Filter drilling status
Rosario Turrisi INFN Padova
Hole Machining Operations
Quality Control in Straw Production
Flexible lines production and planning
ITS Cooling: Xmas Plan Claudio Bortolin.
ALICE PD group meeting Andrea Francescon.
Boring Tools. Objectives: As a result of this lesson, students will be able to accomplish the following objectives. Identify and select appropriate boring.
Electron-Beam Machining
Weld Types – Butt Joint with Backing
Safety Stuff.
Università di Udine / INFN – PD / CERN
November technical stop activities:
Simplified Procedure Draft
Presentation transcript:

Claudio Bortolin – CERN

Y. Lesenechal started some tests last week (drill, twisted wire and a lot of patience): Ø ~ 1,2 mm Twisted wire + carbide drill bit welded on the head Metal swarf found only upstream the filter

The procedure has the be improved: To tune the force applied to the filter (the twisted wire can be broken inside the pipe) To test the cleaning effect using C6f14 and the cleaning machine in counter flow (or aspiration after the drilling using peek mini-pipes…) To reproduce the results many times in order to optimize the tools To drill the filters in the lab many times in order to find a precise procedure To measure the pressure drop after the drilling

The drilling procedure can be finalized in DSF: Using the counter flow cleaning while drilling measuring the pressure drop after the operation Clogged with glue but the hole

Laser Material Processing AG (Lyss –Switzerland) started some test on a small mockup. 1) too early to have a trustworthy result: the matter is how to bring the power through the bane at 80º (R=13 mm); the first test was not satisfying 2) The company is starting a new test and within this week I could have the result If the power of the signal after the bend is enough they can optimize the design of the lens (cost to be considered) Latest news: Rosario Turrisi found an Italian company that can provide the optical fiber and the equipment necessary for the visual inspection inside the pipe before and after the drilling operation. Delivery time is about 10 days.