Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Construction material – All the material has been ordered with some spare (10%) Material Procurement Faraday cage – Final FEE board dimensions available.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of MWPC production and quality control The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
G. Passaleva Status of MWPC production site in Florence G. Passaleva.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
Engineering: MWPC design configuration schemas. Wire Pad Chamber (WPC), one gap Avalanche Cdet in parallel to current source (not shown) will reduce current.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
1 26 November 2003, CERN LHCb Muon meeting Anatoli Kachtchouk (INFN Cagliari, PNPI) Final FEE-board conception proposed by Walter Bonivento Sandro Cadeddu.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
09/07/20021Burkhard Schmidt Muon Station M1 Outline: Material Budget –What is the present best estimate of the material budget of a “default” MWPC station.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
BUS 611 Week 5 Assignment Monthly Status Reports To purchase this material link Monthly-Status-Reports.
G. Carboni for the Muon Group
RPC HV&LV status Introduction HV power supply tender
Outer Endcap External Bus tape
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted in Sept. PNPI : M3R4-M2R4 under production LNF : production of M5R3 started CERN : waiting for M2R2-M2R1 (should be moulded together !) PZ-FE – FI : in stand-by (enough already done) – Additional material needed Problems Quality tests at the company have improved Still some problems with the new moulds – Erratic quality - may be due to thickness of FR4 sheets (0.8 mm up to 0.95 mm, marginally in acceptance) - under investigation, probably solved Feedback to Eltos given – promise not to exceed 0.9 mm Production yield 60/ panels discarded in PZ/FE LNF team (Alvaro & co.) continuing to check the planarity of all panels ROME2 panel-o-meter with new measuring technique ????? P. Campana – LHCb Week – Chia – September 2004

HV bars 40% of the material delivered: M3R3-M3R4-M1R3 finished, M2R3-M2R4-M5R3 under completion the rest by the end of the year FR4 frames M2R4-M3R4-M3R3-M2R3 delivered M5R4 1/3 ordered the rest to be ordered now (waiting for offer) Faraday cages Finalizing INFN layout – to be replicated to PNPI (order next year) OPB 2100 red+1400 yellow +120 DCRO delivered (needed INFN 1300 red+950 yellow; CERN ? Which type ? In total 752) SPB needed to test chambers >> PZ <<!

Honeycomb for M1 Waiting for a global offer from Imatec (cut included) [ special gas angular pieces under preparation ] M1 Panels 2 companies contacted (Lugano [Rm2]+Faenza [GEM]) Tests underway (order next year) Rest of the material R+C+pins+spacers+gas connectors delivered HV plastic distributors ordered (50% delivered)