Decay Solenoid – what do we have to do to make it work?

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Acceptance Criteria for the Decay Solenoid Tom Bradshaw Mike Courthold Matthew Hills.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
ELENA installation progress F. Butin / ELENA collaboration.
S A Griffiths CM42 June 2015 Electrical & Control.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
CMS Area Working Group Meeting
LHC Experimental Vacuum Systems Status October ‘07
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
Status of the cryogenic system for B180
Teleconference ACS – FREIA 20th February 2018
Remote Handling Workshop Introduction
LCLS Undulator System Production Management
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Decay Solenoid – what do we have to do to make it work?

Work Strands Refurbishment Alignment –Shims and stops These tasks should be completed by the time Linde commissioning is complete (November 23 rd ?) Testing –Controls –Interfaces – Electrical and Pneumatic Positioning System for Installation

Refurbishment Method Statement and Risk Assessments in place 1 week’s work on exit end MLI Entry end MLI probably slightly less, BUT this includes repairing copper shield and investigating leak. Jenny Tomkins was originally lined up to do MLI, but will probably be too busy on other projects to do it all.

Alignment Requires shims and stops to be designed and procured –Design in progress Help required from Metrology (CC).

Test Position

Testing – Preparatory Work Create a level area for the Solenoid Test Position Specify and procure pipework for connecting Gas Panel to Solenoid Turret Position the Power Supply, Control Rack and Gas Panel –We need a safe place to store the Gas Panel (currently in R12) Make all the necessary electrical connections between the Solenoid, Fridge, Control Rack, Power Supply and Gas Panel. Connect up the vacuum pumps Software??

Controls – Update from Graham Charnley The rack is now complete except for the 48v back up supply. We are waiting for the battery charger to be delivered. Expected end Oct. Rack wiring checks next week External field cables complete by end this week except for DC cables, these to be supplied by Martin Hughes. Need to clarify latest delivery date to allow for software testing prior to delivery. Aiming for w/c 12th Nov but could be w/c 19th Nov DL will provide resource at RAL to connect field wiring for test position. DL require confirmation of actual date for this work ASAP to enable booking of travel and accommodation.

Final Installation Procure (?) and install pumping rig Re-orient transfer line –Need to book in DeMaCo for this? –Needs a support inside the DSA Need to design and procure positioning system – probably just a simple pulley.

Open Questions Can we get help for the MLI work? Is the power supply cabling for the test and final positions in hand? Can a temporary scaffold platform be made to support the Solenoid in the test position? What support is needed for moving the transfer line to the test position? What are the full implications of connecting all the solenoid systems in the DSA? –Do we need a high level platform? –Are cable routes agreed?