Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.

Slides:



Advertisements
Similar presentations
4. Capacity Planning. Basic Organizational Structures in a Production Plant: Functional Line Continuous Process Group Organization.
Advertisements

Servicing Welch DRYFAST ULTRA Pump Models 2032
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
Cutting With a Jeweler’s Saw
Working With Acrylic 1. Acrylic Uses 2. Cutting Acrylic
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Wood Turning Wood turnings are produced on a wood lathe. Various types of turning tools supported on a tool rest are used to produce different shapes.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Making Coverslips by Steve Smith, Cheng-Zhong Zhang and Amy Xu.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Tissue Processing.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
GCSE Graphic Products Shaping and Forming Plastics
ScannersScanners How to use them to scan pictures and documents.
AIR CONDITIONING (COOLING)
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
Metal Packaging in the Microwave Oven. Increasing Demand for Quick Meals  26 % of the European consumers use the microwave oven to prepare quick meals.
Vacuum tests on scintillating fibres. Table of content The Aim of the vacuum tests on the scintillating fibre plane Equipments used in the vacuum tests.
2009© 2009 Aircraft Maintenance Systems RD inc. The following presentation will showcase Aircraft Maintenance Systems RD inc. products most important.
BE PREPARED TO TAKE A FEW NOTES TODAY… Pick up the pink sheet at the front.
Making a Enlargement from your negative. Making an Enlargement Part Two: Correct Exposure: Test Strips & Final Print.
Soldering. Soldering is a way of attaching two pieces of metal by melting a third piece of metal (called solder) to join them. The solder will have a.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
MAKING A GREAT SCIENCE LAB NOTEBOOK. 1. FINDING THE RIGHT BOOK Your notebook should be a durable hard- bound notebook For this assignment you will be.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
Making Python Pretty!. How to Use This Presentation… Download a copy of this presentation to your ‘Computing’ folder. Follow the code examples, and put.
21 Nov 2013 Juergen Thomas: ATLAS Tracker Upgrade: Hybrid Production and Test Setup at Birmingham 1 ATLAS Tracker Upgrade: Hybrid Production and Tests.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Manual Density Business Today
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
Independent Reading Day #1 (Sad, but true.). Let’s do an experiment: Figure out a starting page number for today’s reading – It might not be page one.
Exquisite Heat For Steam Boilers. Time based system  Thermostat Demand Analysis over time will determine the length of burner fire time of the boiler.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
WP3_Bham; 29May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs the glue thickness is controllable. i)Room temp curing.
Say Cheese!. The enzyme activity of the rennet causes the milk to coagulate to a solid gel known as curd. The liquid whey is drained off. The curd is.
Creating Data Sheets. When you see a Red circle or a next button, like this, that means we want you to click on something. These are the same steps you’ll.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Taking Control of Energy. In this workshop... Understanding Bills 3 Easy Ways to Save Concessions & Grants Switch & Save Saving Energy Flexible Pricing.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
WP3_Bham; 15May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs i) Room temp curing the glue thickness is controllable.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
HOW TO MAKE YOUR OWN SOAP STEP 1  Gather the ingredients. Cold process soap is made from oils, lye and water. When these ingredients are combined at.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
 Heat travels from hot to cold  The bigger the temperature difference the faster the rate of transfer.
BY TEAM FARMERS 16 TH MAY :00-14:00 Product Demonstration.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Planned Preventive Maintenance for Fridges To improve your fridge’s function do the following tasks all the time: 2) Defrost your fridge once a month OR.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Permanent Joining Nails: come in different shapes and sizes. Nails are much cheaper than screws and quick to put in. You do not need to drill holes in.
Cold Temperature Test Jig
→ need to guide UV light into gap; also beware temp effects
Glue curing studies (contd)
Ti/SS transitions A.Basti INFN-PISA*
Ladder Assembly All tools and jigs produced Glue dispensing works
Gluing jigs for Demonstrator
University of California Los Angeles
Replacing TrueAir Thermostat with Ecobee SI
Presentation transcript:

Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine if the panel can be heated to reduce the current cure time of 24 hours per ASIC placement session to speed up production. Extract from TRA-DUCT 2902 datasheet: So yes, the glue can be heat cured... However the panel cannot be placed in an oven because of the vacuum hoses, so an alternative needs to be found. A proposed alternative is to use a heating plate that can be placed under the current curing setup. Flat heating elements are available.

Hybrid panel heated plate study First test is to determine curing rates, this is done with test samples of glue on glass slides in an oven. Several tests are done at 30oC, 40oC and 50oC. Samples are prodded every half an hour. All temperatures give the same result, a hard shell forms on the glue after 2 hours. The hard shell is self supporting but not completely cured, it can be dented with a sharp point indicating that the glue interior is not completely cured. But could this be good enough to support the ASICs without the ASIC vacuum jig once it has reached this state? Next stage is to design a system that can be usable.

Hybrid panel heated plate study After some searching we found two companies who sell flat heating plates, Minco (Based in France) and Watlow (Based in Nottingham): Minco: HK5529R101L12B Unit price : € Minimum Order Quantity : 25 pieces Lead time : 7 to 9 weeks from order receipt. 4,625 Euros to buy a heater! Awful customer service, two months to get a quote. Watlow: Helpful on the phone, willing to sell a single item. £63.20, bargain!

Hybrid panel heated plate study Proposed hybrid panel heating system is as follows: Hybrid panelPanel vacuum jig Metal block Heating element Insulating sheet of glass (Temporary, will get something better later) The heating element is stuck (Pressure sensitive adhesive) to the metal block, then this just needs placing under the existing setup. Panel vacuum jig is placed on the metal block without any fixings or screws. No modifications are needed to the existing mechanics.

Hybrid panel heated plate study Heating element is self adhesive, quick to fit on the heating block. A “K” type thermocouple is embedded into the heater. Lets try it out...

Hybrid panel heated plate study Based on oven tests a target temperature above 30oC is needed. Thermocouple on the heater and another one on the panel surface (On an ASIC pad) is connected to a temperature measurement unit. A dual power supply is connected and turned up to the maximum of 70 volts (370mA drawn) After over 2 hours the temperature settles at 34.4oC, not as fast as hoped but it got there. Time to glue one glass ASIC hybrid. Bare stencil used to put an additional glue sample directly on a hybrid as a “Prod and stir” sample

Hybrid panel heated plate study A glass ASIC hybrid is placed. A “Stir and prod” sample is placed which is then checked periodically. Sample forms a hard shell after two hours as seen on previous tests. Assembly is left for a few more hours, ASIC jig is removed, heater turned off and left to cure overnight.

Hybrid panel heated plate study Results look good, dots are well defined, glass ASICs have not moved position. The glue is completely cured on the sample.

Hybrid panel heated plate study Ok, some real tests now. First test, temperature stability, how much control is needed. A proper temperature monitoring system is now used, a HP Data logger connected to a PC to capture the data. One day short test and one three day long test. (Windows 95 PC!)

Hybrid panel heated plate study 3 day test. Temperature is very stable to within a degree, lucky. The procedure should work without requiring a controller.

Hybrid panel heated plate study Second test. 2 Hybrid glass ASIC cure test. How stable is the temperature while the panel is being worked on. How smooth is the procedure to change over the ASIC jig. Hybrid “Stir and prod” sample Room temperature comparison sample Procedure works well. Hybrid glue sample cures as predicted. glass slide sample still stirrable long after procedure is finished.

Hybrid panel heated plate study There is no significant change in the temperature during the procedure. Swopping the ASIC jig over takes 5 minutes. finished hybrids look good, including the positions of the ASICs.

Hybrid panel heated plate study Third test. Produce samples for full testing. Real ASICs. Three heated hybrid cures done in a single session. Three room temperature hybrid cures for comparison (Done later). A timer is added to start the heater early in the morning so the setup is ready to work on at 10am. Timer is from RS components, stock number £ Timer is only to turn heater on, heater is turned off manually.

Hybrid panel heated plate study Procedure goes smoothly.

Hybrid panel heated plate study Disaster! Something is wrong with this panel. Height distance between jig pads and ASIC pads too big. This ASIC fell off. This ASIC came off easily. This ASIC was fairly firm.

Hybrid panel heated plate study Conclusions (So far): Procedure requires some organisation and timing. However there is a two hour gap between placements and the final jig placement can be left overnight with the heater on. Total expenditure is a £63 heater and a £10 timer. The metal plate and base are easy to make. The power supply type is already being used on the project. The heating system can be added to the current setup without any additional modifications. Positioning (Using visual inspection) of ASICs is the same as room temperature cured ASICs. CMM results need checking because of problems with last panel. Next steps: Shear testing in Berlin (We are already talking to this group). A complete 8 hybrid gluing session (We have run out of panels and ASICs). Other groups trying out the procedure.