T. Orimoto, ECAL in CRUZET 1 ECAL in CRUZET CRUZET Data Analysis Jamboree 30 May 2008 Toyoko Orimoto California Institute of Technology On behalf of the.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
ECAL Testbeam Meeting, Rome 28 March 2007 Toyoko Orimoto Adolf Bornheim, Chris Rogan, Yong Yang California Institute of Technology Lastest Results from.
Cluster Threshold Optimization from TIF data David Stuart, UC Santa Barbara July 26, 2007.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Neutron Background Simulation R. Wilkinson. 2 Neutron Background Simulation Long-lived neutrons created, diffuse around collision hall They get captured.
ECAL TIMING. 20/04/092 Ratios’ Method Basics Position of pulse maximum parameterized using the ratio of two consecutive samples, i.e., R = A(t)/A(t+1)
Cosmic Rays Data Analysis with CMS-ECAL Mattia Fumagalli (Università di Milano Bicocca) CIAO!
Approved Plots from CMS First Beam Runs 2-October-2008.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The ATLAS Pixel Detector - Running Experience – Markus Keil – University of Geneva on behalf of the ATLAS Collaboration Vertex 2009 Putten, Netherlands,
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Event Reconstruction in SiD02 with a Dual Readout Calorimeter Detector Geometry EM Calibration Cerenkov/Scintillator Correction Jet Reconstruction Performance.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Toyoko Orimoto, Caltech 1 CMS Electromagnetic Calorimeter US CMS JTERM III 12 January 2009 Toyoko Orimoto California Institute of Technology.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
DOE Review Adi Bornheim California Institute of Technology July 25, 2007 CMS ECAL Status, Test Beams, Monitoring and Integration.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 1 Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics.
The ZDD data structure Each ZDD channel produces a positive “waveform”, one 8-bit sample every 2 ns This waveform is then splitted in “fragments”: a sequence.
First CMS Results with LHC Beam
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Monitoring of L1Calo EM Trigger Items: Overview & Midterm Results Hardeep Bansil University of Birmingham Birmingham ATLAS Weekly Meeting 11/11/2010.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
10-Dec-2008 / S.KunoriHCAL Noise Identification and Monitoring1 HCAL Noise Identification and Filtering (HPD behavior and noise identification) Shuichi.
Ted Eltzroth RunII Stop in ttbar & ICD. 06/24/02 Ted Eltzroth Stop direct production qq -> tt ->c Z 1 0.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
Approved Plots from CRAFT
Results with the RPC system of OPERA and perspectives
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Preparation of LHCb for data taking
SANE Cherenkov - Bigcal Efficiency Update
Roberto Chierici - CERN
CMS ECAL Calibration and Test Beam Results
SLB Synchronization in H4 Beam (LIP - Lisbon)
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Calorimeter calibrations with Flight Software.
Commissioning of the ALICE-PHOS trigger
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Resistive Plate Chambers performance with Cosmic Rays
Imperial laser system and analysis
Status of DT Local Trigger Commissioning
Presentation transcript:

T. Orimoto, ECAL in CRUZET 1 ECAL in CRUZET CRUZET Data Analysis Jamboree 30 May 2008 Toyoko Orimoto California Institute of Technology On behalf of the ECAL prompt feedback group

T. Orimoto, ECAL in CRUZET 2 ECAL Prompt Feedback Group T. Orimoto, A. Bornheim (Caltech) K. Kaadze (KSU) S. Chang (Uni. Kyungpook) J. Fay (IPNL Lyon) F. DeGuio, P. Govoni (Uni Milano/INFN) S. Cooper, J. Haupt, J. Zhang, V Rekovic (Uni. Minnesota) P. Paganini (LLR) A. Palma, C. Doglioni (Uni. Rome/INFN) N. Cartiglia, A. Gozzelino, S. Oggero (Uni Torino/INFN) And others have joined since CRUZET!

T. Orimoto, ECAL in CRUZET 3 ECAL in CRUZET Since CRUZET, have processed all good ECAL cosmics events.. 24M! ECAL barrel fully readout for most of the time, 36/36 supermodules –Aside from some LV issues, ECAL readout has been clean through CRUZET Successful “prompt” analysis –By Friday of CRUZET, had analyzed ~14M events. Now continuing with further analysis of CRUZET data: –Cosmics analysis, now starting to look at track association with muon system –Analysis of high energy events –Study of problematic channels –Laser data analysis –Cosmic intercalibration with CRUZET statistics

T. Orimoto, ECAL in CRUZET 4 Cosmics in ECAL: Event Displays Run 43566, Event Triggered by DT High Energy Event: 288 GeV in one cluster of 25 crystals 288 GeV Cluster, 25 xtals DT hits Reco Track

T. Orimoto, ECAL in CRUZET 5 Cosmics in ECAL: Event Displays Run 43588, Event Triggered by ECAL & DT More event displays: cruzetvisualization.web.cer n.ch/test- CRUZETVisualization/ 16 GeV Cluster 17 xtals HCAL (with E cut of 1 GeV) 1 GeV Cluster

T. Orimoto, ECAL in CRUZET 6 Cosmic selection, based on clusters: 1 xtal with >135 MeV or two neighboring xtals with > 45 MeV each Then take the 5x5 of the crystals and build a Basic Cluster. Efficiency of cosmic cluster selection is ~14% Cluster energy spectra (All plots are for 24M events analyzed, unless otherwise specified) Cosmics selection in ECAL Energy to 200 GeV

T. Orimoto, ECAL in CRUZET 7 ECAL Cosmic Occupancy Looking at the promptly-produced offline processing, HV issue was noticed and subsequently fixed.. S. Cooper, J. Haupt, T. Orimoto HV prob Masked TT (Maximum forced to 2x10 2 ) TOP BOTTOM EB+ EB-

T. Orimoto, ECAL in CRUZET 8 ECAL Cosmic Occupancy with L1 Occupancy for events which pass “cosmic” selection, also selecting on L1 bits. Inclusive Trigger (no requirement on other subsystem trigger) ECAL Trigger DT Trigger RPC Trigger

T. Orimoto, ECAL in CRUZET 9 Track Association Coming soon. S. Cooper, F. DeGuio, C. Doglioni, T. Orimoto

T. Orimoto, ECAL in CRUZET 10 High Energy Events ~5k clusters w/ E>10 GeV (~100 clusters w/ E>200GeV) Possible sources: Showering muons Muon catastrophic Bremsstrahlung Deep inelastic scattering Created “high energy” skim to collect events which contain at least one cluster with E>10 GeV Show here: Occupancy of high E clusters Num of xtals in high E clusters (Basic Clusters, so max is 25. Average is 16 xtals.) Further analysis ongoing C. Doglioni, A. Gozzelino S. Oggero, T. Orimoto

T. Orimoto, ECAL in CRUZET 11 ECAL Timing Mean timing (pulse peak position - 6) in modules in (iphi,ieta), for events which pass cosmic selection (TT binning) S. Cooper, J. Haupt, T. Orimoto Top earlier Bottom later

T. Orimoto, ECAL in CRUZET 12 ECAL Timing ECAL signal: 10 samples, 3 pedestal, ideally peak is at 6th sample Timing = pulse peak position - 6 Divided by trigger type: “Exclusive” trigger (no trigger from other systems) S. Cooper, J. Haupt, T. Orimoto ECAL triggered Mean 1.5 RMS 1.0 DTTriggered Mean 0.4 RMS 0.7 RPCtriggered Mean 0.9 RMS 0.5 ALL events Mean 0.54 RMS 0.70 (Timing throughout CRUZET, close to optimal) Confirm HCAL: ECAL is 2 clocks off

T. Orimoto, ECAL in CRUZET 13 ECAL Timing Run 43637: at end of CRUZET, with GT latency set to correct for ECAL timing… Moved 2 bunch crossings so ECAL is aligned Timing for earlier run 43431: Timing for run 43637, after correction: Mean = 1.7 RMS = 0.6 Mean = 0.4 RMS = 0.6 ECAL timing looks much better now. S. Cooper

T. Orimoto, ECAL in CRUZET 14 ECAL Laser Data in Gap Sequence First successful laser data in gap event sequence Run 43625: 34 SM Timing from laser data: –50ns overall scale. <1ns variance inside TT, ~15ns variance between SMs –Intra SM spread -- can be corrected –Pattern of 2 SMs.. (still to be understood) J. Haupt Time of pulse peak vs FED.TT Laser timing by xtal Red: corrected for differences in laser cable lengths

T. Orimoto, ECAL in CRUZET 15 ECAL Laser Data: Timing Correct intra-SM differences in timing in cosmic data, using laser data –Compute average timing for each SM & compute difference between each TT in SM and the average… then correct cosmic data with these correction factors J. Haupt Before laser correction After laser correction

T. Orimoto, ECAL in CRUZET 16 ECAL Problematic Channels Problematic channels list produced using information about known hardware problems, as well as “hot” channels seen during and since GRUMM with cosmic and pedestal data (channel status map now in DB) Dedicated analyses deployed to study “problematic” channels not previously seen C. Doglioni, A. Palma Reconstructed amplitudes (weights method) w/ and w/o masked channels: Clearly noisy areas, still to be fully understood…

T. Orimoto, ECAL in CRUZET 17 ECAL Trigger Primitives Study was done on the trigger occupancy from ECAL trigger primitives (P. Paganini). This led to a list of trigger towers to be masked. With this in place, a top- bottom coincidence ECAL trigger was deployed (1Hz when threshold set to 250 MeV). Something from Pascal?

T. Orimoto, ECAL in CRUZET 18 Conclusions Cosmic analysis. All data available as of last night processed. Already closely investigating trigger and instrumental patterns. High energy events: several k of > 10GeV clusters.. Study ongoing. ECAL trigger: top-bottom coincidence deployed ECAL timing: Shifted 2 BX, now looks OK. Studies with laser timing. Laser: Successful laser data taking in gap event sequence Cosmic Intercalibration with CRUZET data: Analysis started… More plots, linked from our PFG wiki pages: Getting ready for CRUZET-II: blah blah blah Grateful to ECAL P5-commissioning and DAQ teams for helpful discussions!

T. Orimoto, ECAL in CRUZET 19 Zero Suppression of ECAL After considering feedback from GRUMM, zero-suppression threshold of 7 (1.75 ADC counts) applied throughout CRUZET A. Palma Amplitudes reco’d with weights method Fraction of digis with amp >= emulated 0-supp threshold ZS=7 (1.75 ADC counts)

T. Orimoto, ECAL in CRUZET 20 ECAL Triggering history run 43307: only ECAL triggers with EB-, single EM trigger TT theshold=20 run 43308: only ECAL triggers with EB+, single EM trigger TT theshold=20 after run 43308: muons trigger only run and later: muon triggers+ECAL triggers with top-bottom configuration. TT threshold=25 run and later: muon triggers+ECAL triggers with top-bottom configuration. TT theshold=20 run 43545: only ECAL triggers with top-bottom configuration. TT threshold=20 run 43547: HCAL provides the trigger with a top-bottom configuration run 43548: only ECAL triggers with top-bottom configuration. TT threshold=25 later runs: same as muon triggers

T. Orimoto, ECAL in CRUZET 21 RPC near side, YB0 & YB1 DT = all wheels; 3.or.4.or.5.or.9.or.10.or.11; at least 2 chambers ECAL = EB+.or.EB-; (5.or.6)&(14.or.15) RPC = YB0.or.YB1; 10.or.11.or.12.or.1.or.2.or.3; at least 3 rolls CSC =ME1+,4+; almost all chambers Triggering Scheme