1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.

Slides:



Advertisements
Similar presentations
1 E206 Terahertz Radiation from the FACET Beam SAREC Review SLAC 2013 July 26 Alan Fisher and Ziran Wu SLAC National Accelerator Laboratory.
Advertisements

First THz Measurements at FACET Ziran Wu, Alan Fisher, Henrik Loos FACET 2011 Users Meeting
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Online Data Analysis and Simulation Sven Reiche UCLA - 09/22/04 Sven Reiche UCLA - 09/22/04.
Patrick Krejcik LCLS June 16-18, 2008 High Level Applications Facility Advisory Committee Meeting June 17, 2008 Applications Team.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Spontaneous Radiation at LCLS Sven Reiche UCLA - 09/22/04 Sven Reiche UCLA - 09/22/04.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
John Arthur LCLS Diagnostics and Commissioning September 22, 2004 Summary of Related Topics from the Miniworkshop on.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 28-Jan
CLIC programme at FACET Update on CERN-BBA A. Latina, J. Pfingstner, G. De Michele, D. Schulte (CERN) E. Adli (Univ. of Oslo), J. Resta Lopez (IFIC) In.
ESS DTL beam commissioning
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
S. Molloy, P. Emma, J. Frisch, R. Iverson, M. Ross, D. McCormick, M. Woods, SLAC, CA, USA S. Walston, Lawrence Livermore National Laboratory, CA, USA V.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Henrik Loos LCLS ICW October 2006 Diagnostics in the LCLS LCLS Injector Commissioning Workshop October 9-11, 2006 Henrik.
Management Sunspots Quality Emittance IP3 Aberrations Grounding CSR APE Accelerator Physics and Engineering Providing a new paradigm for a forward-looking.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
What did we learn from TTF1 FEL? P. Castro (DESY).
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 18/06/2015 High Gradient work shop 2015.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
ATF2 Status N.Terunuma, KEK
LCLS Commissioning & Operations High Level Software
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Accelerator Physics and Engineering Update Jan 6, 2010
Beam Optics Set-Up at SLAC End Station A
LCLS Commissioning & Operations High Level Software
What am I working on… H. Loos 08/02/2010.
Machine Studies/Software Update
Transverse emittance measurements
Beam-Based Alignment Results
Recent Activities H. Loos 02/15/2011.
Accelerator Physics and Engineering Update Jan 6, 2010
Linac/BC1 Commissioning P
Overview Pre-Beam Checkouts
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Plasma acceleration and betatron oscillations
Breakout Sessions SC1/SC2 – Accelerator Physics
First results of micro-bunching and COTR experiments at FLASH
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Injector Diagnostics Status
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Presentation transcript:

1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011

2 Henrik Loos 2 13 Sep 2011 APE Meeting Activities FACET Bunch length monitor commissioning LCLS HLA for FACET THz source simulation Software development MAD deck parser for Matlab Accelerator agnostic HLAs Spatial 2D transition radiation simulation LCLS LEM server Transport matrix measurement Ultra-fast emittance measurement Undulator BBA studies

3 Henrik Loos 3 13 Sep 2011 APE Meeting FACET BLM & OTR Screens Ample signal from pyro with properly setup beam Absolute bunch length calibration needed Cameras suffer from higher radiation environment at FACET Display by J. Yocky

4 Henrik Loos 4 13 Sep 2011 APE Meeting LCLS HLSs for FACET Wire scan, emittance, profile monitor, correlation plot, Matlab model

5 Henrik Loos 5 13 Sep 2011 APE Meeting Data from A. Fisher & Z. Wu FACET THz Experiment Simulations of spectrum and beam size Measured spectrum Simulated spectrum Water absorption Vertical Size 2.4 µm Horizontal Size 2.9 µm λ = 100 µm

6 Henrik Loos 6 13 Sep 2011 APE Meeting 2D Transition Radiation Simulation Laguerre-Gauss Modes for radiation propagation Original only 1 angular mode for both polarizations each Inaccurate results for eccentric electron beams Use multiple angular modes for true 2D calculation TR 1D CalculationTR 2D Calculation 1mm x 250 um e-beam

7 Henrik Loos 7 13 Sep 2011 APE Meeting Transport Matrix Measurement Measure jitter orbits or phase space grid oscillations Non-invasive jitter measurement Generate grid in normalized phase space with two correctors

8 Henrik Loos 8 13 Sep 2011 APE Meeting LTU Matching Prediction Predict lattice functions in LTU from LI28 emittance measurement and R-matrix measurements

9 Henrik Loos 9 13 Sep 2011 APE Meeting Fast Emittance Measurement Orbit bump at wires in LI28 Emittance in 1 plane < 10s Agrees with scanning wire

10 Henrik Loos Sep 2011 APE Meeting Undulator BBA Studies Try BBA at single energy Girders don’t move much, only BPM offsets Fit launch & linear offset slope Compare with BBA offsets with K. Bertsche, H.-D. Nuhn, F. Peters