Computing Research Center, High Energy Accelerator Organization (KEK) Site Status Report Go Iwai, KEK/CRC, Japan WLCG Tier-2 Workshop Dec. 1 ~ 4, 2006.

Slides:



Advertisements
Similar presentations
INFSO-RI Enabling Grids for E-sciencE The EGEE project Fabrizio Gagliardi Project Director EGEE CERN, Switzerland Research Infrastructures.
Advertisements

Estonian Grid Mario Kadastik On behalf of Estonian Grid Tallinn, Jan '05.
Toward Production Level Operation of Authentication System for High Performance Computing Infrastructure in Japan Eisaku Sakane and Kento Aida National.
Development of Simulation Framework for Advanced Radiation Therapy Takashi Sasaki KEK (This project is supported by JST CREST)
Grid Computing for High Energy Physics in Japan Hiroyuki Matsunaga International Center for Elementary Particle Physics (ICEPP), The University of Tokyo.
1 Deployment of an LCG Infrastructure in Australia How-To Setup the LCG Grid Middleware – A beginner's perspective Marco La Rosa
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
RomeWorkshop on eInfrastructures 9 December LCG Progress on Policies & Coming Challenges Ian Bird IT Division, CERN LCG and EGEE Rome 9 December.
H IGH E NERGY A CCELERATOR R ESEARCH O RGANIZATION KEKKEK Current Status and Plan on Grid at KEK/CRC Go Iwai, KEK/CRC On behalf of KEK Data Grid Team Links.
Computing for ILC experiment Computing Research Center, KEK Hiroyuki Matsunaga.
3/27/2007Grid Efforts in Belle1 Hideyuki Nakazawa (National Central University, Taiwan), Belle Collaboration, KEK.
Computing Coordination in Japan Takashi Sasaki Computing Research Center KEK, Inter-University Research Institute Corporation High Energy Accelerator Research.
HEP Grid Computing in China Gang Workshop on Future PRC-U.S. Cooperation in High Energy Physics.
BINP/GCF Status Report BINP LCG Site Registration Oct 2009
May 8, 20071/15 VO Services Project – Status Report Gabriele Garzoglio VO Services Project – Status Report Overview and Plans May 8, 2007 Computing Division,
Data GRID Activity in Japan Yoshiyuki WATASE KEK (High energy Accelerator Research Organization) Tsukuba, Japan
Grid Applications for High Energy Physics and Interoperability Dominique Boutigny CC-IN2P3 June 24, 2006 Centre de Calcul de l’IN2P3 et du DAPNIA.
Data GRID deployment in HEPnet-J Takashi Sasaki Computing Research Center KEK.
Grid Infrastructure for the ILC Andreas Gellrich DESY European ILC Software and Physics Meeting Cambridge, UK,
H IGH E NERGY A CCELERATOR R ESEARCH O RGANIZATION KEKKEK Current Status and Recent Activities on Grid at KEK Go Iwai, KEK/CRC On behalf of KEK Data Grid.
The HEPiX IPv6 Working Group David Kelsey EGI TF, Prague 18 Sep 2012.
Workshop KEK - CC-IN2P3 KEK new Grid system 27 – 29 Oct. CC-IN2P3, Lyon, France Day2 14: :55 (40min) Koichi Murakami, KEK/CRC.
International Workshop on HEP Data Grid Nov 9, 2002, KNU Data Storage, Network, Handling, and Clustering in CDF Korea group Intae Yu*, Junghyun Kim, Ilsung.
Site Report from KEK, Japan JP-KEK-CRC-01 and JP-KEK-CRC-02 Go Iwai, KEK/CRC Grid Operations Workshop – 2007 Kungliga Tekniska högskolan, Stockholm, Sweden.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
HEP Data Grid in Japan Takashi Sasaki Computing Research Center KEK.
The ILC And the Grid Andreas Gellrich DESY LCWS2007 DESY, Hamburg, Germany
KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
ATLAS Tier 1 at BNL Overview Bruce G. Gibbard Grid Deployment Board BNL 5-6 September 2006.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
GRID Deployment Status and Plan at KEK ISGC2007 Takashi Sasaki KEK Computing Research Center.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
HEPiX IPv6 Working Group David Kelsey GDB, CERN 11 Jan 2012.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
IAG – Israel Academic Grid, EGEE and HEP in Israel Prof. David Horn Tel Aviv University.
KEK GRID for ILC Experiments Akiya Miyamoto, Go Iwai, Katsumasa Ikematsu KEK LCWS March 2010.
Status of Tokyo LCG tier-2 center for atlas / H. Sakamoto / ISGC07 Status of Tokyo LCG Tier 2 Center for ATLAS Hiroshi Sakamoto International Center for.
ICEPP regional analysis center (TOKYO-LCG2) ICEPP, The University of Tokyo 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo1.
INRNE's participation in LCG Elena Puncheva Preslav Konstantinov IT Department.
EGEE is a project funded by the European Union under contract IST New VO Integration Fabio Hernandez ROC Managers Workshop,
Breaking the frontiers of the Grid R. Graciani EGI TF 2012.
EGEE is a project funded by the European Union under contract IST Issues from current Experience SA1 Feedback to JRA1 A. Pacheco PIC Barcelona.
Computing Research Center, High Energy Accelerator Organization (KEK) Gird Deployment at KEK Go Iwai, Yoshimi Iida, Setsuya Kawabata, Takashi Sasaki and.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Pedro Andrade > IT-GD > D4Science Pedro Andrade CERN European Organization for Nuclear Research GD Group Meeting 27 October 2007 CERN (Switzerland)
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
KISTI activities and plans Global experiment Science Data hub Center Jin Kim LHCOPN-ONE Workshop in Taipei1.
Workshop KEK - CC-IN2P3 LCG update and plan at KEK Go Iwai, KEK/CRC 27 – 29 Oct. CC-IN2P3, Lyon, France Day1 15: :05 (40min)
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
GRID & Parallel Processing Koichi Murakami11 th Geant4 Collaboration Workshop / LIP - Lisboa (10-14/Oct./2006) 1 GRID-related activity in Japan Go Iwai,
KEK CC - present and future - Mitsuaki NOZAKi (KEK)
Bob Jones EGEE Technical Director
Performance measurement of transferring files on the federated SRB
LCG Service Challenge: Planning and Milestones
Update on SINET5 implementation for ICEPP (ATLAS) and KEK (Belle II)
LCG Deployment in Japan
Status and Plans on GRID related activities at KEK
Update on Plan for KISTI-GSDC
NAREGI at KEK and GRID plans
gLite deployment and operation toward the KEK Super B factory
High Energy Physics Computing Coordination in Pakistan
Interoperability of Digital Repositories
LHC Data Analysis using a worldwide computing grid
Current Grid System in Belle
Grid related activities at KEK
The LHCb Computing Data Challenge DC06
Presentation transcript:

Computing Research Center, High Energy Accelerator Organization (KEK) Site Status Report Go Iwai, KEK/CRC, Japan WLCG Tier-2 Workshop Dec. 1 ~ 4, 2006 Tata Institute of Fundamental Research, Mumbai, India

2006/12/1KEK/CRC, Japan, Go Iwai2Outline 1. Introduction1. Introduction –KEK –Network in Japan 2. Grid Deployment2. Grid Deployment –Current Status –Strategy –Hosted VOs: Belle, ILC, APDG and so on 3. Grid Inter-operability3. Grid Inter-operability –NAREGI: NAtional REsearch Grid Initiative –Relationship among LCG, NAREGI and KEK 4. Summary4. Summary

2006/12/1KEK/CRC, Japan, Go Iwai3 Next Topics IntroductionIntroduction –KEK –Network in Japan Grid DeploymentGrid Deployment –Current Status –Strategy –Hosted VOs: Belle, ILC, APDG and so on Grid Inter-operabilityGrid Inter-operability –NAREGI: NAtional REsearch Grid Initiative –Relationship among LCG, NAREGI and KEK SummarySummary

2006/12/1KEK/CRC, Japan, Go Iwai4 KEK Computing Research Center Introduction Overview of CRC Super Computer System Our mission related computing and networkingOur mission related computing and networking –Providing Computing Facility KEK-B/BelleKEK-B/Belle ILCILC J-PARCJ-PARC –Proton Synchrotron K2K, T2KK2K, T2K –long baseline neutrino detection Accelerator designAccelerator design Application at Synchrotron Radiation FacilityApplication at Synchrotron Radiation Facility –material science, life science and etc –Networking –Security –Support for university groups in the field As an Inter University Research Institute CorporationAs an Inter University Research Institute Corporation

2006/12/1KEK/CRC, Japan, Go Iwai5HEPnet-J Originally, KEK organized HEP institutes in Japan to provide the networking among themOriginally, KEK organized HEP institutes in Japan to provide the networking among them –We started from 9600bps DECnet in early 1980’s –KEK is one of the first Internet sites and the first web site in Japan (1983? and 1992) The current network infrastructure is the SuperSINET operated by NII (National Institute of Informatics)The current network infrastructure is the SuperSINET operated by NII (National Institute of Informatics) NII will be upgraded to the SINET3 in April 2007.NII will be upgraded to the SINET3 in April The SINET3 will provide multi-layered network service with Gbps backbone.The SINET3 will provide multi-layered network service with Gbps backbone.Introduction

2006/12/1KEK/CRC, Japan, Go Iwai6 SINET (44nodes) 100 Mbps~ 1Gbps Super SINET (32nodes) 10Gbps International lines Japan~U.S.A 10Gbps (To:N.Y.) 2.4Gbps (To:L.A.) Japan~Singapore622Mbps Japan~Hong Kong 622Mbps NationalPublicPrivateJuniorCollegesSpecialized Training Colleges Inter-Univ. Res. Inst. Corp. OthersTotal Introduction Tab.: Number of SINET particular Organizations (Feb. 2006) Tab.: Line Speeds HEPnet-J (cont.) Network Topology Map of SINET/SuperSINET(Feb. 2006)

2006/12/1KEK/CRC, Japan, Go Iwai7 Next Topics IntroductionIntroduction –KEK –Network in Japan Grid DeploymentGrid Deployment –Current Status –Strategy –Hosted VOs: Belle, ILC, APDG and so on Grid Inter-operabilityGrid Inter-operability –NAREGI: NAtional REsearch Grid Initiative –Relationship among LCG, NAREGI and KEK SummarySummary

2006/12/1KEK/CRC, Japan, Go Iwai8 Strategy on GRID Grid Deployment Deployment at KEK for major groupsDeployment at KEK for major groups –BELLE Ongoing experimentOngoing experiment –ILC Near future targetNear future target University supportUniversity support –education and training –Deployment at smaller centers HEPNET-J VOHEPNET-J VO Overview of KEK-B accelerator Design of ILC accelerator/detector

2006/12/1KEK/CRC, Japan, Go Iwai9 Recent Events Nov. 2005: HEP Data Grid WorkshopNov. 2005: HEP Data Grid Workshop –training and cooperation in Asia-Pacific region –Lecturer: Dr. Marco La Rosa very good exercise for usvery good exercise for us Mar. 2006: First meeting on NAREGI/EGEE InteroperabilityMar. 2006: First meeting on NAREGI/EGEE Interoperability –launched Inter-OP projects between NAREGI and EGEE talk about NAREGI latertalk about NAREGI later –at CERN Aug. 2006: Belle workshop on GridAug. 2006: Belle workshop on Grid –to share the information among Belle collaborations –at Nagoya Univ. Sep. 2006: Japan-France Workshop on Grid ComputingSep. 2006: Japan-France Workshop on Grid Computing –at IN2PS/Lyon Univ. Grid Deployment

2006/12/1KEK/CRC, Japan, Go Iwai10 Summary of LCG Deployment JP-KEK-CRC-01 (Pre-Production System)JP-KEK-CRC-01 (Pre-Production System) –since Nov –is registered to GOC, is ready to WLCG (World wide LCG). –is operated by KEK staffs. –Site Role: practice for production system JP- KEK-CRC-02.practice for production system JP- KEK-CRC-02. test use among university groups in Japan.test use among university groups in Japan. –Resource and Component: SL w/ LCG-2.7SL w/ LCG-2.7 –upgrade to gLite-3.0 is done. CPU: 14, Storage: 1TBCPU: 14, Storage: 1TB –Supported VOs: belle, apdg, dteam and opsbelle, apdg, dteam and ops JP-KEK-CRC-02 (Production System)JP-KEK-CRC-02 (Production System) –since early –is registered to GOC, is ready to WLCG. –is outsourced to IBM Co.,Ltd. –Resource and Component: SL or SLC w/ LCG-2.7 –upgrade to gLite-3.0 is done. CPU: 48, Storage: 6TB (w/o including HPSS) –Supported VOs: belle, apdg, atlasj, ilc, dteam and ops JP-KEK-CRC-00 (Testbed System)JP-KEK-CRC-00 (Testbed System) –since Jun –is closed environment in comparison with other sites. easy to access and configure. –Resource and Component: SL w/ gLite-3.0 (100% pure) –Supported VOs: belle, apdg, atlasj and g4med Grid Deployment

2006/12/1KEK/CRC, Japan, Go Iwai11 Other Grid-related Services We have our own GRID CAWe have our own GRID CA –is started on Feb. 2006, and is recognized by LCG. –is accredited by APGRID PMA –# of issued user certificates: 32 –# of issued host certificates: 77 – VO Membership ServiceVO Membership Service –Supported VOs: apdg is the VO for Asia-Pacific Data Grid.apdg is the VO for Asia-Pacific Data Grid. belle is the VO for Belle experiments.belle is the VO for Belle experiments. atlasj is the VO for Atlas experiments in Japan.atlasj is the VO for Atlas experiments in Japan. g4med is the VO for Geant4 medical application.g4med is the VO for Geant4 medical application. Local Mirror ServiceLocal Mirror Service –SL, SLC, LCG, gLite –It takes ~30 minutes to update by using apt-get with CERN or FNAL repositories. ~3 minutes with KEK repository~3 minutes with KEK repository – Semi-automatic Installation ServiceSemi-automatic Installation Service –WNs can be installed semi-automatically by PXE (Preboot eXecution Environment) and kickstart configuration file. – Site PortalSite Portal – Grid Deployment KEK Grid CA Web Repository

2006/12/1KEK/CRC, Japan, Go Iwai12 Belle VO Started using SRB and LCGStarted using SRB and LCG –LCG site: JP-KEK-CRC-01/02 Data distribution service using SRB-DSIData distribution service using SRB-DSI –Belle already have a few PBs data in total including 100s TB DST and MC Bulk file register helps us: SregisterBulk file register helps us: Sregister we do not move any of themwe do not move any of them –Benefits both for native SRB users and LCG users VO is supported by KEKVO is supported by KEK –Nagoya (JP), Melbourne (AU), Academia Sinica (TW), Krakow (PL) and etc Grid Deployment

2006/12/1KEK/CRC, Japan, Go Iwai13 New B Factory Computer System Performance(Year)1997~(4years)2001~(5years)2006~(6years) Computing Server ( SPECint2000 rate ) ~100(WS)~1,250(WS+PC)~42,500(PC) Disk Capacity ( TB ) ~4~91,000(1PB) Tape Library Capacity ( TB ) ,500(3.5PB) Work Group server ( # of hosts ) 3+(9) FS User Workstation ( # of hosts ) 25WS +68X 23WS +100PC 128PC Grid Deployment - New B Factory Computer System since March History of B Factory Computer System Moore’s Law: 1.5y=x2.0 4y=x~6.3 5y=x~10

2006/12/1KEK/CRC, Japan, Go Iwai14 Belle Grid Deployment Plan We are planning a 2-phased deployment for BELLE experiments.We are planning a 2-phased deployment for BELLE experiments. –Phase-1: BELLE user uses VO in JP-KEK-CRC-02 sharing with other VOs. JP-KEK-CRC-02 consists of “Central Computing System” maintained by IBM corporation.JP-KEK-CRC-02 consists of “Central Computing System” maintained by IBM corporation. Available resources:Available resources: –CPU: 72 processors (opteron), SE: 200TB (with HPSS) –Phase-2: Deployment of JP-KEK-CRC-03 as BELLE Production System JP-KEK-CRC-03 uses a part of “B Factory Computer System” resources.JP-KEK-CRC-03 uses a part of “B Factory Computer System” resources. Available resources (maximum estimation)Available resources (maximum estimation) –CPU: 2200 CPU, SE: 1PB (disk), 3.5 PB (HSM) This system will be maintained by CRC and NetOne corporation.This system will be maintained by CRC and NetOne corporation. Grid Deployment

2006/12/1KEK/CRC, Japan, Go Iwai15 Belle Grid Deployment Plan (cont.) We are planning to federate with Japanese universities.We are planning to federate with Japanese universities. –KEK hosts the BELLE experiment and behaves as Tier-0. –Univ. with reasonable resources: full LCG (Tier-1) –Univ. without resources: UI –The central services such as VOMS, LFC and FTS are provided by KEK. –KEK also covers web Information and support service. –Grid operation is co- operated with 1~2 staffs in each full LCG site. Grid Deployment JP-KEK-CRC-02 JP-KEK-CRC-03 University UI University UI University UI University UI University UI University UI University UI University UI University UI Tier-0 Tier-1 deploy at phase-2 preliminary design

2006/12/1KEK/CRC, Japan, Go Iwai16 Other VOs ILCILC –The initial goal is data sharing among institute in Japan, Asia and world-wide. 1-10TB in total1-10TB in total APDGAPDG –is the VO for DataGrid in Asia-Pacific region. Atlas JapanAtlas Japan –is the VO for the ATLAS collaborations in Japan not for world wide ATLAS.

2006/12/1KEK/CRC, Japan, Go Iwai17 Next Topics IntroductionIntroduction –KEK –Network in Japan Grid DeploymentGrid Deployment –Current Status –Strategy –Hosted VOs: Belle, ILC, APDG and so on Grid Inter-operabilityGrid Inter-operability –NAREGI: NAtional REsearch Grid Initiative –Relationship among LCG, NAREGI and KEK SummarySummary

2006/12/1KEK/CRC, Japan, Go Iwai18 NAREGI: NAtional REsearch Grid Initiatives National Research Grid Initiatives (NAREGI)National Research Grid Initiatives (NAREGI) –Apr MEXT funded NAREGI 5 years Project –Lead by Prof. Ken Miura (NII) –Development of Grid infrastructure and an application for promotion of national economy –Target application is nano science and technology for new material design – Players Computing & networking: NII, AIST, TITECComputing & networking: NII, AIST, TITEC Material scientists :IMS, U. Tokyo, Tohoku U., Kyushu U., KEK,..Material scientists :IMS, U. Tokyo, Tohoku U., Kyushu U., KEK,.. Companies: Fujitsu, Hitachi, NECCompanies: Fujitsu, Hitachi, NEC –Distributed facility: Computing Grid up to 100 TFLOPS in total –Extended to 2010 as a part of National Peta-scale Computing Project Grid Inter-operability SuperSINET NII 10 TFLOPS (1,618 CPU) Application Testbed 5 TFLOS (896 CPU) Software Testbed * As of 2004 TokyoNagoyaIMS

2006/12/1KEK/CRC, Japan, Go Iwai19 Collaboration with NAREGI What we expect for NAREGIWhat we expect for NAREGI –Better quality –Easier deployment –Better support in the native language What we need but still looks not in NAREGIWhat we need but still looks not in NAREGI –File/replica catalogue and data GRID related functionalities Need more assessmentsNeed more assessments Comes a little bit lateComes a little bit late –Earlier is better for us We need something working today!We need something working today! Require commercial version of PBS for beta-1Require commercial version of PBS for beta-1 LCG (LHC Computing GRID) is now based on gLite 3.LCG (LHC Computing GRID) is now based on gLite 3. Only middleware available today to satisfy HEP requirementsOnly middleware available today to satisfy HEP requirements –US people are also developing their own DifficultyDifficulty –Support Language gapsLanguage gaps –Quality assurance –Assumes rich man power Grid Inter-operability

2006/12/1KEK/CRC, Japan, Go Iwai20 LCG and NAREGI Inter-operability NAREGI has much interests on interoperability because they came late and they decided to establish in their sideNAREGI has much interests on interoperability because they came late and they decided to establish in their side First meeting at CERNFirst meeting at CERN –March 2006 –NAREGI, LCG and people from KEK Second meeting at GGF TokyoSecond meeting at GGF Tokyo Grid Inter-operability

2006/12/1KEK/CRC, Japan, Go Iwai21 KEK Plan on GRID Inter-op NAREGI will implement LFC on their middlewareNAREGI will implement LFC on their middleware –We assume job submission between them will be realized soon –Share the same file/replica catalogue space between LCG and NAREGI Move data between them using GridFTPMove data between them using GridFTP NAREGI SRB LCG will be tried alsoNAREGI SRB LCG will be tried also –using SRB-DSI Assessments will be done forAssessments will be done for –Command level compatibility (syntax) between NAREGI and LCG –Job description languages –Software in experiments ILC, International Linear Collider, will be a targetILC, International Linear Collider, will be a target – interoperability among LCG, OSG and NAREGI will be required Grid Inter-operability

2006/12/1KEK/CRC, Japan, Go Iwai22 Next Topics IntroductionIntroduction –KEK –Network in Japan Grid DeploymentGrid Deployment –Current Status –Strategy –Hosted VOs: Belle, ILC, APDG and so on Grid Inter-operabilityGrid Inter-operability –NAREGI: NAtional REsearch Grid Initiative –Relationship among LCG, NAREGI and KEK SummarySummary

2006/12/1KEK/CRC, Japan, Go Iwai23Summary We, KEK Computing Research Center, are working for Belle and ILC mainly related GRIDWe, KEK Computing Research Center, are working for Belle and ILC mainly related GRID –Belle has started to use LCG –ILC soon –University supports also 3 LCG sites are in operation at KEK.3 LCG sites are in operation at KEK. Other Grid-related services are in operation also.Other Grid-related services are in operation also. –CA, VOMS, Mirror, Installation and Documentation Grid inter operability between NAREGI and LCG will be established.Grid inter operability between NAREGI and LCG will be established.

Computing Research Center, High Energy Accelerator Organization (KEK) Thank You K. Amako 1,2, J. Ebihara 3, Y. Iida 1, K. Inami 4, K. Ishikawa 5, M. Kaga 4, S. Kameoka 1,2, S. Kawabata 1, K. Kawagoe 6, A. Kimura 7, Y. Kiyamura 6, M. Matsui 5, K. Murakami 1,2, H. Sakamoto 8, T. Sasaki 1,2, S. Suzuki 1, Y. Watase 1, S. Yashiro 1 and H. Yoshida 9 1 High Energy Accelerator Organization (KEK) 2 Japan Science and Technology Agency (JST) 3 SOUM Co.,Ltd. 4 Nagoya University 5 IBM Japan Systems Engineering Co.,Ltd. 6 Kobe University 7 Ashikaga Institute of Technology 8 ICEPP, University of Tokyo 9 Naruto University of Education

Computing Research Center, High Energy Accelerator Organization (KEK) Backup

2006/12/1KEK/CRC, Japan, Go Iwai26 ILC VO GRID for ILC is sponsored byGRID for ILC is sponsored by –GAKUJYUTSU SOUSEI budget (a grant from MEXT) –French-Japan Joint Lab. Program Initial goalInitial goal –As a tool to share data of total size 1~10TB among Institutes in Japan, Asia, and World Wide. Grid Deployment

2006/12/1KEK/CRC, Japan, Go Iwai27 APDG VO Asia Pacific Data GRIDAsia Pacific Data GRID Collaboration among Academia Sinica(TW), Center for HEP-Korea, University of Melbourne and KEKCollaboration among Academia Sinica(TW), Center for HEP-Korea, University of Melbourne and KEK Regular meetings, workshops and conferencesRegular meetings, workshops and conferences We are seeking tighter collaboration with ASGCWe are seeking tighter collaboration with ASGC –GOC in Asia Grid Deployment

2006/12/1KEK/CRC, Japan, Go Iwai28 ATLAS JAPAN VO federation among ICEPP, Kobe Univ., Nagoya Univ. and KEK.federation among ICEPP, Kobe Univ., Nagoya Univ. and KEK. –Okayama Univ. and Hiroshima-IT are also potential sites VO UsageVO Usage –Testing inter-connectivity among ICEPP, Kobe Univ. and KEK –Testing Function of middleware –Measuring performance of data sharing ATLAS RC is hosted by ICEPP not usATLAS RC is hosted by ICEPP not us Grid Deployment