APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.

Slides:



Advertisements
Similar presentations
Trigger & DAQ Ole Hansen SBS Collaboration Meeting 19 March 2010.
Advertisements

Update on GEM Activities for the 12 GeV Program in Hall A at JLab
SRS Readout electronics
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
SPHENIX GEM Tracker R&D at BNL Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
SRS Readout System for VMM2 Sorin Martoiu, IFIN-HH (RO)
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
SRS Readout architectures Hans Muller, CERN PH
Strip No Detection and Imaging of High-Z Materials with a Muon Tomography Station using GEM Detectors K. Gnanvo 1, W. Bittner 1, B. Benson 1, F. Costa.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
News on GEM Readout with the SRS, DATE & AMORE
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
GEM Detector R&D at Florida Tech – “Get to know each other” –
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Florida Institute of Technology, Melbourne, FL
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
SRS readout for Fermilab Test Beam Facility (FTBF) (R&D for all GEMs Tracking and PID detectors for EIC) Outline  GEM detectors R&D for EIC Tracking.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Integration with ATLAS DAQ Marcin Byszewski 23/11/2011 RD51 Mini week Marcin Byszewski, CERN1.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
Digital Acquisition: State of the Art and future prospects
“Medium Term”: VFAT2 + SRS readout system
Electronics for GEM R&D at the University of Virginia
PRAD DAQ System Overview
mmDAQ (Muon Atlas MicroMegas Activity – ATLAS R&D)
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Hall A Compton Electron detector overview
Large CMS GEM with APV & SRS electronics
Status of the Front Tracker GEM
Example of DAQ Trigger issues for the SoLID experiment
Physics program in Hall A for the CEBAF 12 GeV era
The CMS Tracking Readout and Front End Driver Testing
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University of Virginia, Charlottesville, VA 22901, USA 10/15/2013RD51 Electronic School, Feb 03, 20141

Outline  GEM Trackers for Hall A 12 GeV Upgrade at JLab  Super Bigbite Spectrometer (SBS)  APV25 Electronics for SBS GEMs  MPD Electronics  SRS-ATCA electronics ?  Current status of SRS Electronics at UVa  Test of large SRS system with the SRU  SRS Electronics in Test beam at Fermilab 10/15/20132

RD51 Electronic School, Feb 03, 2014 GEM Trackers for Hall A 12 GeV Upgrade at JLab 10/15/20133

RD51 Electronic School, Feb 03, /15/ GeV Upgrade of Lab in Newport News VA, USA CEBAF 6 GeV (before 2013) Max. current: 200  A Max. Energy: 5.7 GeV Longitudinal pol.: 75 to 85 % CEBAF 12 GeV (2014) Max. current: 90  A Max. Energy: 11 GeV (Hall A, B, C), 12 GeV (Hall D) Longitudinal pol.: 75 to 85 %

RD51 Electronic School, Feb 03, /15/20135 Super BigBite Spectrometer (SBS) in Hall JLab Dipole Magnet GEM for Tracking Calorimeters CH2 Analyzer for Proton Polarimeter for GEp (5) Dual-radiator RICH for SIDIS Program SBS is the first apparatus in Hall A for the CEBAF 12 GeV upgrade at JLab Set of instrument for flexible spectrometer configuration

RD51 Electronic School, Feb 03, /15/20136 Super BigBite Spectrometer (SBS) in Hall JLab

RD51 Electronic School, Feb 03, /15/20137 GEM Trackers for SBS Back Tracker 8 GEM Layers (200 × 50 cm 2 ) Each Layer = 4 GEM modules (50 × 60 cm 2 ) R&D and University of Virginia Front Tracker: 6 GEM Layers (150 × 40 cm 2 ) Each layer = 3 GEM modules (50 × 40 cm 2 ) R&D and Production by INFN Roma, Catania Proton arm layout for GEp (5) experiment 50 cm 60 cm 50 cm 40 cm

RD51 Electronic School, Feb 03, /15/20138 SBS Back Tracker GEM Module X ADC / Y ADC = 1.3 Charge sharing X/Y strips Average ADC counts 50 × 50 cm 2 UVa with APV25 electronics (SRS FE cards) Final design size is going to be 60 × 50 cm 2 production just started

10/15/2013RD51 Electronic School, Feb 03, Two APV25 Readout Systems for SBS GEM Trackers Front Tracker: Multi Purposed Digitizer (MPD) By Paolo Musico (INFN Genoa) VME 64x crate Two active components: apv25 FE cards and MPD VME module Backplane interface between FE cards and MPPD Back Tracker: SRS-ATCA + SRU Hans Muller (RD51) & eicSys (Germany) ATCA crate High density channels at limited cost/channel High rate for experiment like SBS

RD51 Electronic School, Feb 03, /15/ Status of MPD MPD v 4.0 Hardware modifications: Used HDMI-A connectors for analog and digital signals Adopted larger FPGA (+20%) Replaced DDR with DDR2 (128 MB) 110 MHz system clock Removed USB support Moved from Flash to SD-Card Added front panel coax clock All spare signals go to PMC compliant connectors Improved ADC power distribution Added optional termination on ADC inputs

RD51 Electronic School, Feb 03, /15/ Status of MPD

10/15/2013RD51 Electronic School, Feb 03, SRS-ATCA For SBS GEM Back Trackers Requirement for SBS Back Trackers GEMs 91 K electronics channels at an acquisition rate up to 5kHz SRS-ATCA: Certified crate standard: ADC/FEC combo replaced by ATCA blades Higher channel integration => reduce cost/channel for large systems Replace DTCC cables by ATCA backplane The Standard CERN Scalable Readout Unit (SRU) Event builder: collect events from up to 40 FECs and send to the DAQ PC via a 10 Gb optical link SRU distribute the trigger and clock signals via DTCC links to APV25 and the ATCA blades ad ADCs, 40 x DTC links 4 x LVDS trigger TTCrx optical 4 x NIM in 4 x NIM out 4 x SFP+ 2 GB DDR Virtex 6

RD51 Electronic School, Feb 03, /15/ SRS-ATCA: OC Chiplink Converter Box SRS crates far away from the detectors with optical fibers ASIC power via HDMI  address our concern with no rad hard LDOs on APVs Hybrids We are really interested in this development and would like to contribute to the effort

RD51 Electronic School, Feb 03, /15/ SRS-ATCA: What is the current status of the RTM? Can we have 4 DTCC links for each RTM (with at least 3 for the data to the SRU?) What are the other options available?

RD51 Electronic School, Feb 03, 2014 Current status of SRS Electronics at UVa 10/15/201315

10/15/2013RD51 Electronic School, Feb 03, Test of the SRU with Multiple FECs Test performed at CERN August, 15 th – 30 th 2013 First time SRU was been tested with more than one FEC card Many groups interested and involved in the test: UVa (Kondo Gnanvo) RD51 Electronics WG5 (Hans Muller & Alfonso Tarazona) RD51 GDD lab at CERN (Eraldo Oliveri) ATLAS MAMMA Group (Andre Zibel, Michele Bianco) SRS Material used for the test: UVa: SRU + FP Euro crate + 1 FEC card + 4 ADCs cards + 40 apv25 hybrids Florida Tech: 2 FEC/ADC combos MAMMA Group at CERN: 2 FEC/ADC combos + Micromegas Tracker Telescope RD51 GDD: 2 FEC/ADC combos + x-ray box and DATE PC

RD51 Electronic School, Feb 03, 2014 Test of the SRU with Multiple FECs at CERN 10/15/ DATE Run Control Display SRS-SRU tested in RD51-GDD X-ray box 8 FECs card connected to the SRU 70 APV25 Hybrids, 4 APV25 connected to a small 10 x 10 GEM chamber High rate capability of the system

10/15/2013RD51 Electronic School, Feb 03, BNL: Mini drift GEM Yale Univ: 3D-Coordinate GEM setup Stony Brook Univ: GEM-RICH setup UVa & Florida tech: Large Size GEM for forward tracking T-1037 is funded by Site-neutral R&D Program BNL Test Beam Fermilab: GEMs for EIC Tracking and PID Detectors APV25-SRS for all the 20 GEMs of the 4 setups

RD51 Electronic School, Feb 03, 2014 Large Size GEMs in FTBF (Fermilab) (UVa and Florida Tech joint effort) SBS1 SBS2 EIC-SoLID Tracker 3 (FIT) Tracker 2Tracker 1 SRS Electronics 2D Moving table BEAM 10/15/ CMS (FIT) NS4 (FIT)

RD51 Electronic School, Feb 03, 2014 SRS Readout With FTBFL (FNAL)  Beam structure: 1min cycle, 4s spills 10k to 35k particles/spill  64 APV25 with SRS+SRU+ 4FEC/ADC combos  DAQ rate is up to 400 Hz (average over 4s spill)  Using 3,6 and 9 time slices (25ns) for digitization  Trigger: coincidence of 3 scintillators ADC’s FEC’s U. Va. SRU 10/15/201320

RD51 Electronic School, Feb 03, 2014 SRS Readout With FTBF 10/15/ SBS1 TRK_4: SBS2 EIC-SoLID TRK_0TRK_1TRK_2

RD51 Electronic School, Feb 03, 2014 Preliminary Results with Fermilab Test Beam 10/15/ SBS Proto I EIC-SoLID Proto 20 GeV Hadron Beam: Position Scan of SBS1 and EIC Chambers 120 GeV Proton Beam: Position Resolution of SBS1 Chambers  X = 58  m  Y = 67  m

10/15/2013RD51 Electronic School, Feb 03, Summary  GEM Trackers for SuperBigBite in Hall A 12 GeV Upgrade at JLab on very good track  Ongoing production for the GEMs for the Front (INFN Roma, Catania) and Back Trackers (at UVa)  Two APV25 based Electronics for SBS GEMs  MPD Electronics for the Front Tracker GEMs  SRS-ATCA electronics candidate for the Back Tracker GEMs  Some important development needed for SRS-ATCA to satisfy the requirement for the SRS  Discussion with RD51 Electronics Group (Hans Muller) on the implementation of these upgrades  Current status of SRS Electronics at UVa  Test of “large” SRS system with the SRU at CERN and in Test Beam Fermilab  Early promising results w.r.t the requirements needed for the SBS challenging environment