Title V Review DJ Law US EPA Region 8.

Slides:



Advertisements
Similar presentations
METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
Advertisements

IRON & STEEL FOUNDRY MACT QUESTION & ANSWERS
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
SUCCESSFUL SUMMER STRATEGIES SPRING 2009 Federal and State Administrative Research.
Participating in Your Child’s IEP Meeting
Identification of BART-Eligible Sources in the WRAP Region A Summary of the April 4, 2005 Draft Report.
CAM in Ohio Title V Permits Andrew Hall, Ohio EPA CAM/GHG Training August 22, 2011.
Team Writing Long-Form Proposals Terry A. Ring Chemical Engineering University of Utah.
2015 NCMA EPA Enforcement Policies and How They Affect Your Facility Michael Pjetraj, P.E. DAQ Stationary Source Compliance Branch Supervisor.
Jack Harrah Governor’s Office of Emergency Services
Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. Business and Administrative Communication SIXTH EDITION.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
Title V Site Operating Permits (SOPs)
Compliance Update NCMA 2015.
Slide #1 Writing Winning Proposals. Slide #2 Agenda  Overview  Writing Tips  Comments, Suggestions, Questions  Upcoming Seminars.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
U.S. Environmental Protection Agency
WESTCAS 2011 Winter Conference Fort Worth, Texas February 24, 2011.
National Archives Records on Microform What they are and where to find them Archival Research Basics with the National Archives Lesson # 8 The National.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
RESEARCH REPORT PREPARATION AND PRESENTATION. 2 RESEARCH REPORT A research report is: – a written document or oral presentation based on a written document.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
Administrative Policy Writing Spring Administrative Policy Writing Spring 2011 Introduction This week we are discussing a type of public-policy.
Where to find Information About Facilities. Overview of Title V Permits.
WILL ALLISON AIR POLLUTION CONTROL DIVISION APRIL 16, 2012 Oil and Natural Gas Air Pollution Standards.
By Rachel Coleman.  Definition of career area and its rational. A brief account of its history or evolution as a profession.
Air Permitting Update Yogesh Doshi ACE Academy New Jersey Department of Environmental Protection.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Delivering sustainable solutions in a more competitive world 1 © COPYRIGHT 2010 ERM.
Research & Technology Implementation TxDOT RTI OFFICE.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Developing Plans and Procedures
Environmental Justice & Air Permitting Training - August 15, 2012 EPA Region IV – Atlanta, Georgia.
1 Air Enforcement Matt Haber Senior Advisor Office of Enforcement and Compliance Assurance.
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
Reading and Writing Research Reports Reporting research results has a few basic components: 1) What has the author(s) read that prompted the research ?
Proposal Write proposal must understand what your reader wants and use the proposal to propose an action to be performed by your company.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
June 13, 2013 Joy Wiecks Fond du Lac Reservation 1.
REGULATIONS & LEGISLATION BIG TEN ENVIRONMENTAL STEWARDSHIP GROUP STEVE MARUSZEWSKI – PENN STATE Greenhouse Gases.
Administrative Law The Enactment of Rules and Regulations.
Introduction to NPDES Permits Introduction to NPDES Permits NPDES = National Pollutant Discharge Elimination System. Permit system required by Section.
Best Available Control Technology/Lowest Achievable Emission Rate Evaluation Sarah Fuchs Air Permits Division Texas Commission on Environmental Quality.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
MARE 103 MOP Proposal Lecture.
Navajo Nation Air Quality Control Program Operating Permit Program Navajo Nation Environmental Protection Agency Route 112 North/Bldg Fort Defiance,
Policies, Regulations, and Rules What administrative units should know about writing, adopting, promulgating and interpreting PRRs.
PSD Permitting Process Nancy Mayer EPA OAQPS. 2 Topics Find technical resources for permit review Describe how permits are constructed Describe what to.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Research Methods Technical Writing Thesis Conference/Journal Papers
Coordinating Permitting and Enforcement Nebraska’s Experiences David A Graiver Environmental Engineer NDEQ: Air Quality June 15, 2011.
How to Write a Proposal. Contains title of project, name of recipient, proponent and date Includes partners of appropriate Title should be clear and unambiguous.
CEC SoCal Electricity Reliability Workshop Environmental Agency Considerations Lisa Beckham, Environmental Engineer, U.S. EPA – Region 9 August 17, 2015.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.
A research proposal is a document written for the purpose of obtaining funding for a research project.
Title V Site Operating Permits (SOPs) Initial, Revision, and Renewal Applications Vasant Chaphekar, P.E. & Carolyn Maus, P.E. Air Permits Division Texas.
What is PDF?  Each group is required to create a Product Development File (PDF).  The PDF is a series of documents that cover the entire history of the.
Abstract  An abstract is a concise summary of a larger project (a thesis, research report, performance, service project, etc.) that concisely describes.
David Kurz, P.E. Lead Wastewater Engineer
Preparing for Permit Review
The Rulemaking Process
Nonattainment NSR Permitting Process
Single Event Violations
Writing a Business Plan
How To Write a Project Proposal
Presentation transcript:

Title V Review DJ Law US EPA Region 8

Overview Know your process Permit isn’t always the most important document Permit size shouldn’t be scary

The Process – Why is it important? No two permitting agencies will use the same permit style US EPA State of Colorado All techniques used apply to any kind of permit review

My Review Process – Permit isn’t most important Goal of reviewing permit is to understand what is in it and why Permit itself can be confusing Statement of Basis – Narrative form Much better for Who/What/Where/When/Why

Example – US EPA Permit

Same Thing - SoB

Starting Point Read Statement of Basis FIRST! It should Give clearest description of source and its permitting history Give reasons why permit is being issued Discuss why a particular regulation is included, or not included, in the permit Every item discussed in SoB should have corresponding section in permit

The Permit – What To Look For Permits can be hefty documents CDPHE Permit – 81 pages, 12 Emission Units EPA Permit – 35 pages, 4 Emission Units Proposed CDPHE Suncor Refinery Permit – 230 pages not counting Appendices That is only for Plants 1 and 3. It doesn’t include the Title V permit for Plant 2, at 196 pages

The Approach – Making it Bite-Sized The key is “Specific” – this is what makes the permit unique

EPA Permit -Table of Contents

CDPHE - Table of Contents

Permit Is Now Manageable Terms and conditions specific to units at facility EPA Permit – 7 pages out of 35 pages CDPHE Permit – 20 pages out of 81pages This is where you should find limitations, testing, monitoring, and reporting required for emission units at facility, as described in SoB State rules for that equipment NSPS requirements MACT requirements Requirements from other construction permits (BACT)

What about the rest? Boilerplate – Regulations that apply to every facility that obtains a Title V permit Should be identical for all sources within permitting authority’s jurisdiction Non-site-specific regulations Acid Rain Alternative Operating Requirements Permit Shield Administrative Requirements State-Specific Regulations It’s all still important but isn’t “specific” to this facility

Does A + B = C? What is discussed in SoB should show up somewhere in Permit Specific requirements “Boilerplate” typically isn’t discussed in SoB If it doesn’t, or isn’t clear, worth commenting about Public is generally the least knowledgeable about environmental regulation. If public is confused about requirements or conditions, typically permitting authority can rewrite permit to make it clearer

Should A + B = C? Requires working knowledge of environmental regulation and working knowledge of source operations Best place to start is Permit Application Typically not found as part of an “online” record. Must formally request, or visit location of physical permit record Other resources include inspection reports, AP-42 process descriptions, NSPS and MACT background documents, etc.

Final Points Develop your own personal system for permit review Don’t be discouraged by size of documents. Break permit into manageable parts Don’t expect to know everything at once

Last Rule When you are still confused about a condition…CALL! Every permit public notice should have a contact name/number for engineer who wrote permit Best source to determine intent of section that is troubling you