Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects July 2009.
Advertisements

WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT September 16 th, 2013 – October 25 th, 2013.
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Presents. Clubhouse lower level Renovation December 2013.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
Trying to get the shingling finished in a snowstorm.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: June 24 th, 2013 – June 28 th, 2013.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Boren School Preparing an existing wall to receive structural improvements.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Foundation Systems.
Operation Build Progress What once was a dream, is now becoming reality. With the Grace of God, work on the Renovations and Educational wing of Second.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
SITE SUPERVISION (CITADEL TOWER)…………….…1 SITE SUPERVISION (CITADEL TOWER)…………….…1 DESIGN OF A 3 BEDROOM STOREY BUILDING…..2.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
Winchester Medical Center Campus Expansion June 21, 2011.
F ACILITIES, P LANNING, AND C ONSTRUCTION April 14, 2014 Construction Report.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
North Augusta High School Design Development Presentation.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
Caretakers House Demolition Decking to STEM and ARTS.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
BUILDING CONSTRUCTION
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Competency: Draw wall sections and details
In the underground-ground Under ground there are trains, In the trains – trains There are people – people People travel somewhere, Where they work, Where.
Floor Systems and Foundation Support
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
Commercial Constructions o Nations Construction provides best Commercial Constructions service. Commercial Constructions o It is one of the best construction.
APPLICATIONS OF TECHNOLOGY
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Design of a Commercial Shopping Center
Capital Improvements Presentation
CHANNEL DISTRICT ACTION TEAM
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
1 Semester Project Design A Multi Story Office Building
Minuteman Vocational Technical Regional High School Progress
Project 2018 October 31, 2018.
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
North Augusta High School – Phase 2A and 2B
Minuteman Vocational Technical Regional High School Progress
Lafayette Airport Commission New Terminal Program Update
Presentation transcript:

Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high” and starting to take the walls in Gym/Cafeteria wing to bearing height. The steel frame in 2-3 wing is 98% complete and began on the K-1 wing on 10/4/10. Part of Gym/Cafeteria wing steel frame has been started. Slab On Grade in 4-5 wing has been poured and the mason has the interior walls up to scaffold height. The plumber has finished the underground rough-in in K-1 wing and 2-3 wing; the kitchen is the next area for installation. The electrician has continued with rough-in. Project is 26% completed.

Aerial Photo taken from Northern Elevation---Picture taken on 9/13/10 Gym Cafeteria 4-5 wing 2-3 wing K-1 wing

K-1 Wing Masonry in Fore Ground; 2-3 Wing Steel Frame on Right

Picture taken from Church Parking Lot viewing 2-3 wing Steel Frame

Slab on Grade poured in 4-5 wing. Steel for 2-3 wing.

Givens Street Extension Completed prior to Children returning to School on 8/25/10

Project in relation to the existing school; Picture taken from North Elevation