STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Asset Management.

Slides:



Advertisements
Similar presentations
Closing the Gaps: Facilities Development and Planning Systems Texas Higher Education Coordinating Board February 26, 2004.
Advertisements

STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Acquisition and.
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
Summary of $475 million Bond Issue and Capital Financing Options Practiced By the State System of Higher Education in Oklahoma Practiced By the State System.
HB1438 Update & Statewide Capital Planning Initiative Office of State Finance Department of Central Services November 8, 2011.
United States Department of Agriculture Office of Procurement and Property Management U.S. Dept. of Agriculture Property Management Division PMD Freeze.
Space Bank & Freeze the Footprint May 22, 2013 Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
Ivan Graff Office of Acquisition and Project Management Oak Ridge, TN March 27, 2014 Applying the Memorandum on Data Related to Operations and Maintenance.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Office of Management, Office of Engineering and Construction Management DATA ELEMENT UPDATE Gary R. Horn Facilities Engineer, LEED AP Office of Engineering.
School Facility Maintenance and Repairs Idaho Code
June 16, 2011FIMS / Real Estate Workshop nd Annual FIMS / Real Estate Workshop.
FIMS/Real Estate Workshop June 16, 2011 The IFI Crosscut and You How FIMS Data Supports the Budget Process Cindy Hunt, PE, LEED AP, CCE, CFM Office of.
FY08 Space and Equipment Inventory Kickoff Meeting.
A-16 REAL PROPERTY THEME UPDATE June 26, Background Real Property Assets consist of buildings, land parcels, linear structures, and structures.
Legislative Branch Update: Current Audits and Legislation of Interest Ivan Graff, P.E., CFM, PMP, CCE, LEED AP.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
Logistics Management System Solutions Logistics Management System Solutions Working Group Survey Results February 2005.
Office of Budget and Financial Planning F&A Meeting Sep 30, 2014.
Office of Acquisition and Property Management Completing an Effective Project Data Sheet (PDS)
Disposing of Unneeded Federal Real Estate May 2011.
Acquisition, Technology and Logistics Current and Planned Management Initiatives for DoD’s Historic Infrastructure Maureen Sullivan Federal Preservation.
Disposing of Unneeded Federal Real Estate August 2011 SAME Luncheon John E.B. Smith.
Idaho Code Allocation for School Building Maintenance (HB 743) Schools must allocate at least 2% of the replacement value of school buildings.
Headquarters Perspective Carmelo Melendez May 2015.
FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual.
ANNUAL FIMS COMPREHENSIVE TRAINING Y- 12 NEW HOPE CENTER OAK RIDGE, TN MARCH 25, 2014 GAYLE SMITH Accomplishing FRPP Reporting and Improving Data Quality.
SEASONS OF THE ASSET: FIMS AND THE LIFECYCLE Ivan Graff, P. E. Office of Asset Management May 7, 2015.
How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.
Office of Acquisition and Property Management Proposed Changes to Attachment G FY 2011 – FY 2015 Five Year Plan.
2009 FIMS / RE Workshop DOE O 430.1B, Real Property Asset Management - Update Monja Vadnais, P.E. Facilities Engineer Office of Engineering and Construction.
National Laboratory Operations Board Infrastructure Assessment Subgroup Real Property Background Carmelo Melendez.
Facilities Information Management System (FIMS) Data Validation Inbrief program Facilities site name date.
Facilities Information Management System (FIMS) Data Validation Outbrief [Program] [Site] date.
Office of Management Office of Engineering and Construction Management 6/2/2009 Beyond the President’s Management Agenda & FRPC Update Gary R. Horn Facilities.
2014 FIMS Annual Training Oak Ridge, TN March , 2014 Presented by: Michael Kohut, DOE Headquarters (GCI)
Ivan Graff, PE, CFM, CCP, LEED AP Office of Management Office of Asset Management.
DOE ASSET MANAGEMENT PLAN
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
FRPP Data Issues FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy & Gayle Smith Energy Enterprise Solutions.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Office of Management Office of Engineering and Construction Management 6/2/2008 President’s Management Agenda & FRPC Update Gary R. Horn Facilities Engineer.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and.
Typesetting: Distinguishing Between Property Types Ivan Graff, P. E. Office of Asset Management.
Mark Gordy Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
1 FIMS Data Validations And Lessons Learned Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure Team FIMS.
ANNUAL FIMS COMPREHENSIVE TRAINING ARGONNE NATIONAL LABORATORY MAY 6, 2015 GAYLE SMITH Federal Real Property Profile Reporting.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure.
1 DOE Excess Elimination an Dispositions Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
FIMS Workshop June 2-6, 2008 Jolie Macier. A subcommittee of individuals comprised of Field Office users, including DOE contractor personnel, that recommend.
National Strategy for the Efficient Use of Real Property Fiscal Years I VAN G RAFF Lemont, IL May 6, 2015.
Replacement Plant Value (RPV) Dollars in Billions.
Lease Acquisition FIMS / Real Estate Workshop Tom Geronikos, Senior Realty Officer, OECM Office of Management June 5, 2008.
R ICHLAND O PERATIONS O FFICE Hanford Site 2008 FIMS/Real Estate Workshop.
GAO and Inspector General Reports: A Review of Recent Audits Ivan Graff, P.E., CFM, PMP, CCP, LEED AP.
Laboratory Operations Board
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Mark Gordy, Headquarters (EES) Facilities Information Management System Data Quality and.
Mark Gordy Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Freeze the Footprint Update March 25, 2014 Presented for Monja Vadnais Facilities & Infrastructure Division (MA-652) Office of Acquisition and Project.
The Capital Budget Game in Utah SHEEO 2006 Professional Development Conference Kevin Walthers Assistant Commissioner Utah System of Higher Education August.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Status of FIMS at Los Alamos National Laboratory.
May 7, 2015FIMS / Real Estate Training 2015 FIMS / Real Estate Training FY 2015.
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
FIMS FY16 Year-End Schedule FIMS Annual Training May 10-12, 2016 PREPARED BY: GAYLE SMITH.
1 of 32 Performance Measures and the State of Our Facilities Eric Haukdal MA-50 Office of Asset Management.
Prepared for the Facility Information Management & Real Estate Annual Comprehensive Training May , 2016 Orlando, FL Real Property Efficiency Plan.
Accountability and Internal Controls – Best Practices
Space Utilization Advisory Committee November 14, 2017
Current and Planned Management Initiatives
Presentation transcript:

STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Asset Management FIMS / Real Estate Training Lemont, IL May 5, 2015

Agenda Goals for the “State of Our Facilities Report” Differences between internal and proposed external versions Sample charts FY 2014 summary Five year trends (FY 2010 – FY 2014) May 5, 2015FIMS / RE Training 2

State of Our Facilities Report Will... Subsume  Three Year Rolling Timeline  Annual FIMS data charts Review Implementation of the Asset Management Plan Take stock of the Department’s current position by examining -  Summary data about the Department’s current portfolio  Data illustrating trends in areas of interest SOFAR SOGOOD = State of our Facilities Annual Report and Statement of Goals, Objectives, and Other Direction May 5, 2015FIMS / RE Training 3

About the Internal Version  May 5, 2015FIMS / RE Training 4 Audiences Purposes Program, Support Office Leadership Headquarters For each program or support office: Summarize its inventory Compare its health to the Department’s Highlight its strengths and weaknesses Information Source FIMS data from five most recent years All types of interest in real property All statuses and levels of utilization

Structure of the Internal Version  May 5, 2015FIMS / RE Training 5 Inventory Condition Is the program growing significantly? Does FIMS data match source documentation? Has the program increased its mission alignment? Do replacement values grow at industry rates? Are mission critical assets in an acceptable condition? Are maintenance expenditures adequate? Operation Costs At what rate have utility and waste costs grown? Does it lease more per capita than its peers? Do leases cost more than owned space? Does DOE lease near owned, underutilized space? Excess and Under- utilized Assets Does the program or support office hold or abandon unneeded real property? Does unneeded real property siphon scarce operating funds?

National Laboratory Operations Board Asks Did the Department execute its planned investments? 2. Is the percentage of adequate buildings and structures increasing? 3. Is deferred maintenance decreasing? 4. Is the square footage of underutilized space decreasing? 5. Are excess buildings being eliminated? 6. Are the annual costs of carrying excess facilities declining? 7. Are core capabilities at reduced risk due to infrastructure deficiencies? May 5, 2015FIMS / RE Training 6

May 5, 2015FIMS / RE Training 7 Audiences Purposes Office of Management and Budget Federal Real Property Council Government Accountability Office Public Summarize the Department’s inventory Address GAO “High-Risk List” concerns “Replace” the Three Year Rolling Timeline Information Source FIMS data from five most recent years submitted to the Federal Real Property Profile (FRPP) submission About the External Version 

Structure of the External Version  May 5, 2015FIMS / RE Training 8 Inventory Collecting Accurate and Useful Data Is the Department growing significantly? How accurate is DOE’s data? Does DOE invest enough in its assets? Has DOE’s inventory increased its mission alignment? Do replacement values grow at industry rates? Leasing Does DOE lease more per capita than its peers? Do DOE leases cost more than owned space? Does DOE lease near its owned, underutilized space? Excess and Under- utilized Assets Does DOE hold or abandon unneeded real property? Does unneeded real property siphon scarce operating funds?

Where are the Assets? (FY 2014) May 5, 2015FIMS / RE Training 9 Includes: All ownerships All statuses All prop. types GSA as well

Where are the Land Parcels? (FY 2014) May 5, 2015FIMS / RE Training 10 Includes: All ownerships All statuses Total: 2.81M Ac

Land Area by Interest (FY 2014) May 5, 2015FIMS / RE Training 11 Includes: All ownerships All statuses Total: 2.81M Ac

Building Count and Area by Interest (FY 2014) May 5, 2015FIMS / RE Training 12 By Count Total: 12,091 By Area Total: 134 MSF Includes: All ownerships All statuses Build. & trailers GSA as well

Average Age by Asset Type (FY 2014) May 5, 2015FIMS / RE Training 13 STRUCTURE BUILDING TRAILER 36 Years 35 Years 19 Years LAND 42 Years Includes: All ownerships All statuses All prop. types GSA as well

Replacement Value by Property Type May 5, 2015FIMS / RE Training 14 Includes: All ownerships All statuses All prop. types No GSA

Building Use by Program (FY 2014) May 5, 2015FIMS / RE Training 15 Includes: All ownerships All statuses Build. & trailer GSA as well

Occupancy by Use (FY 2014) May 5, 2015FIMS / RE Training 16 Includes: All ownerships All statuses Build. & trailer GSA as well Total: 137,279

Buildings over 5,000 GSF (all ownerships, status, etc.) May 5, 2015FIMS / RE Training 17

Building Area by Use May 5, 2015FIMS / RE Training 18 Includes: All ownerships All statuses Build. & trailer GSA as well

Building Area by Use (Federal) May 5, 2015FIMS / RE Training 19 Includes: DOE Owned & Leased All statuses Build. & trailer GSA as well

Building Utilization (FY 2014) May 5, 2015FIMS / RE Training % 90 – 100 % 0 % AND 90 – 100 % 55 % 73 % 86 % UtilizationArea Includes: All ownerships All statuses Build. & trailers 72 % 79 % 90 % Count

“Unneeded” Building Area by Use May 5, 2015FIMS / RE Training 21 Includes: All ownerships Excludes GSA Build. & trailer Excess Unutilized Underutilized Shutdown

Mission Critical Assets by Property Type, ACI May 5, 2015FIMS / RE Training 22 Includes: DOE Owned Status 1, 2, & 6 All prop. types ACI = Asset Condition Index = 1 - (DM / RPV)

Not Mission Dependent Assets May 5, 2015FIMS / RE Training 23 Includes: All ownerships All statuses Build. & trailers

Select Operations Costs May 5, 2015FIMS / RE Training 24 Includes: All ownerships All statuses All prop. types No GSA Note: FIMS allocates structures’ operation costs to buildings and trailers

Maintenance by Mission Dependency May 5, 2015FIMS / RE Training 25 Includes: DOE Owned Status 1, 2, & 6 All prop. types No 3000s & 4289

Building & Structure Validation Scores May 5, 2015FIMS / RE Training 26

USAGE CODES May 5, 2015FIMS / RE Training 27

“Other” Usages by Count (FY 2014) May 5, 2015FIMS / RE Training 28 Includes: All ownerships All statuses Build. & trailer GSA as well Shown Here: 90% of 4,475 Assets Citing an “Other” Usage 19% of All Assets Cite an “Other” Usage

“Other” Usages by Count (FY 2014) May 5, 2015FIMS / RE Training 29 Includes: All ownerships All statuses Build. & trailer GSA as well 2009 Catchall: 230 records 20% of All Assets Cite an “Other” or “Catchall” Usage

“Other” Usages by Count and Property Type May 5, 2015FIMS / RE Training 30 Includes: All ownerships All statuses All prop. types GSA as well

May 5, 2015FIMS / RE Training 31 Ivan Graff (202) Contact for more information: TCS Zen Garden At Argonne National Laboratory