Prepared for Presentation to the American Dream Coalition By Emory Bundy, Jim MacIsaac and Doug Simpson November 11, 2007 Defeated on Nov 7, 2007.

Slides:



Advertisements
Similar presentations
9/26/20071 Building Owners and Managers Association September 26, 2007 Roads & Transit Forum by Jim Horn Dick Paylor.
Advertisements

Transit Initiatives and Communities Conference, June 24, 2013 Hard lessons in reputation management Hard lessons in reputation management.
Eastern Virginia Airport I. Introduction The Eastern Virginia Airport System Study (EVASS) was an analysis designed to help the Commonwealth identify a.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Central Puget Sound Regional Fare Coordination System Regional Program Administrator Seattle, WA Cheryl Huston March 18, 2013.
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
An Approach for Base Transit Trip Matrix Development: Sound Transit EMME/2 Model Experience Sujay Davuluri Parsons Brinckerhoff Inc., Seattle October,
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
METRO Rail Intercept Survey Findings, Data Uses AMPO Travel Modeling Work Group October 1, 2009.
TABOR Rebates: Just the Facts. What are TABOR Rebates? When state revenues (Fiscal Year Spending) exceed a voter approved cap (rate of change in CPI plus.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
North Shore Connector Cost-Benefit Study of Extending Pittsburgh Light Rail Transit to the North Shore Parshwanath Adiraja Dan Concepcion Nicolas Zitelli.
Dulles Metro Extension Phase I: Tyson’s Corner Martene Bryan Luis Serna Matt Zarit.
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Roads & Transit 2007 A Smart Joint Program? Financial Considerations As of April 15, 2007.
Case Study 3 — New Rail Starts: Seattle Monorail & LRT Britta Stein Justin Scott Wenteng Ma.
Transit Long Range Financial Scenario Assumptions: 1 st and 2 nd quarter existing sales tax growing at 5% In 2020 and again in 2030, another ¼ cent sales.
CFTE Transit Initiatives Conference: What We Can Learn From Recent Campaigns Tempe, AZ December 8, 2003.
June 2011  Route  Operations & Riders  Benefits  Construction  Operations & Maintenance  Potential System Manager  Next Steps & Conclusion Overview.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Trends in Urban Transit in the U.S. – Some Comparisons Edd Hauser, P.E., PhD Nicholas J. Swartz, MPA Center for Transportation Policy Studies UNC Charlotte.
Division of Budgets August 22, 2012 Budget and Allocation Capacity Update Presented to the California Transportation Commission Tab 14.
Moving the Most People for the Least Cost Preserving the American Dream Conference Friday, September 24, 2010.
1 Program of Projects Study The Impacts of Regional Transit Investment Forum March 21, 2013 Move LA - "LA's Got Lines"
Transportation leadership you can trust. prepared for National Capital Region Transportation Planning Board presented by Arlee Reno, Cambridge Systematics.
2006 Annual Report on the Status of the Implementation of Proposition 400 Management Committee 9/6/06.
Metro Cities Transportation Policy Committee August 10, 2015 Overview of Minnesota Highway and Transit Finance.
EFFECTS OF RISING GAS PRICES ON BUS RIDERSHIP FOR SMALL URBAN AND RURAL TRANSIT SYSTEMS Jeremy Mattson 18 th National Conference on Rural Public and Intercity.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
Wake County Transit Plan Choose how you move! December 7, 2011 Capital Area Friends of Transit 1.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
Center for Transportation Excellence June 20 – 22, 2011.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Regional Transit Study Final Recommendations March 15, 2010.
Mercer Corridor Stakeholder Committee November 4, 2015 Sound Transit.
DESTINATION 2030 Regional Local Personal 2004 Review and Progress Report.
Getting & Using Transit Data John Semmens Laissez Faire Institute & Arizona Transportation Institute.
Tactics and Strategies for Organizing a Successful Ballot Measure Campaign Center for Transportation Excellence Conference Dec. 9, 2003 Kelly Nordini Transit.
North Carolina Transportation Issues David T. Hartgen, Ph.D., P.E. Emeritus Professor of Transportation Studies UNC Charlotte Remarks at the Shaftesbury.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Revenues Sources for Transportation Financing Jeffery A. Richard Foster Pepper & Shefelman.
TRANSPORTATION PROGRAMS Statewide Transportation Survey Arizona Transportation Summit May 29, 2008.
Regional Transportation Plan Draft Hybrid Scenario Transportation Policy Committee 7/22/03.
DESTINATION 2030 Regional Local Personal Adopted May 24, 2001.
Get Out the Vote 2015 Campaign in support of Transportation Funding Bill - Texas Proposition 7 on the November 3, 2015 Ballot.
IMPACTS OF PROPERTY TAX REFORM January 30, Introduction Randy Singh, Office of Management & Budget –Opening Remarks Bill Donegan, Orange County.
Road Services Funding Options Bridges and Roads Task Force October 28,
Regional Transportation Investment District Overview Presentation to the Discovery Institute, Cascadia Project, Transportation Working Group Kjristine.
2005 TWG Legislative Recommendations. Fix It First ? WSDOT recommends first priority be Alaskan Way Viaduct, SR-520 with new state revenue Does the TWG.
APTA Sustainability and Public Transportation Workshop Benjamin Smith
Regional Roads Committee
Central Puget Sound Regional Fare Coordination System
Budget Update nd Interim Assumptions
Lorain County Transit Needs Assessment
D Line Project Overview
Orange County Board of County Commissioners January 24, 2017
I-81 Corridor Improvement Plan
February 2017 New Starts Financial Plan
2020 RTP Update - Proposed Changes to Transit Projects
MARTA HISTORY MAX Program April 16, 2018.
Dakota County Regional Railroad Authority
Presentation transcript:

Prepared for Presentation to the American Dream Coalition By Emory Bundy, Jim MacIsaac and Doug Simpson November 11, 2007 Defeated on Nov 7, 2007

11/11/2007James E. MacIsaac, P.E.2

11/11/2007James E. MacIsaac, P.E.3

11/11/2007James E. MacIsaac, P.E.4

11/11/2007James E. MacIsaac, P.E.5

What Was the R&T Package?  RTID (Regional Roads Package) Initially an $18 billion capital program to improve highways of statewide significance Reduced by half to allow a “Balanced” Roads and Transit Package  Sound Transit ST2 Package Started out as a Phase 2 program of 80 transit projects desired by participating agencies Emerged as mostly a 50-mile extension of Sound Transit’s Light Rail System 11/11/20076James E. MacIsaac, P.E.

11/11/2007 Central Link LRT Promise at $2.3 B Delivery at $4.2 B 18 miles with 12 Stations 24 miles with 21 Stations 2016? ?? ST1/ST2 LRT Plan 70 miles with 34 Stations Total - $21 Billion 7James E. MacIsaac, P.E. Completion by 2006 “Initial Segment” by 2010

All-or-Nothing Ballot  Forced by State Legislature seeking combined support  Total Package Tax: +1.0% Sales Tax plus 0.8% MVET  20% of state sales tax would go to transit  Tax Sunset Years RTID – Would Sunset in 2037 ST1 & ST2 – Hopeful reduction after 2057 bond payoff (but no law commitment) 11/11/20078James E. MacIsaac, P.E.

Campaign Approach  It Costs too much …  And it Does so Little! 11/11/2007James E. MacIsaac, P.E.9

R&T Package Cost Cap Cost 2006$ ST1 Extend N.A. ST2 $11 b RTID $7 b Totals $18 b 11/11/2007James E. MacIsaac, P.E.10 Full Cost YOE$ N.A. $23.6 b $14.5 b $38.1 b (20-year Capital Development Period) Post 2027 Bond Interest $9.3 b $47.4 b

$157 Billion R&T Tax Proposal*  RTID (Roads) – $8.0 b $16 b  ST1 Extension – $14.8 b $64 b  Sound Transit – $11.7 b $77 b  Total Tax Authorization $34.5 b $157 Billion Total Tax Collections: (10%) 11/11/200711James E. MacIsaac, P.E. * Source: Sound Transit estimates thru 2040, extended to Why thru 2057 for ST2? Because Sales Tax Revenues will be used to secure the ST2 Bonds with payoff extending thru ST uses legal means to extend tax collections.

Post-Elect Advise to Supporters  "Release one price tag and don't mention another number, ever. So many cost figures were discussed, the public was never certain which was correct. The mentality became, ‘if the experts don't know the true cost, how would we?’ “ … Seattle Times 11/11/2007James E. MacIsaac, P.E.12

Regional Transit Ridership Average Weekday: 2030 w/o ST2* Total Person Trips 13,200,000 Total Transit Trips** 482,000 Transit Mode Share*** 3.7% Transit “Boardings” 661,000 Transfer Rate 1.37 * Includes ST1 With Central Link from Airport to UW Stadium. ** Source: ST Making Connections, Appendix C, June 2007 With ST2 Change 13,200, , , % +0.5% 818, , Within Sound Transit Service Area 11/11/200713James E. MacIsaac, P.E. *** 2006 Mode Share – 2.9%; Transfer Rate – 1.29.

ST2 Effect on Regional Travel  ST1 and ST2 reflect a Light Rail Transit Overlay of transit services to downtown Seattle  But downtown Seattle represents only 10% of Region’s jobs  The ST2 effect on the Balance of the Region is negligible  Following are proportions of tri-county trips generated by three subsectors and the share of those trips served by transit:* Percent of Transit Mode Shares Region Subsector Total Trips 1998 Base 2030 w/ST1&2 Seattle CBD 5%- 27% 44% Balance of Seattle 20-18% 4.5% 6.5% Balance of Region 75-77% 0.5% 0.7% Total Region 100% 2.7% 3.7% *Source: PSRC 2006 MTP Update. 11/11/200714James E. MacIsaac, P.E.

Our Campaign Approach  “It Costs too much, and does so little”  $157 BILLION Dollars  H e e r r e e’ s Doug 11/11/200715James E. MacIsaac, P.E.

11/11/2007James E. MacIsaac, P.E.16