CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
The procedure to replace CALO rectifier (AC/DC converter) 1.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
STATUS OF DAQ PROJECT OPERA collaboration meeting, Hamburg, 3-5 June, ’04 J.Marteau  T.T. LOW VOLTAGE POWER SUPPLIES  NETWORK, RACKS & CABLING  PT DAQ.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
Verigy V93000 Service Training Appendix B Autotransformer E8005A.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Danish Ali Nawaz 1CLIC workshop 2016 Danish Ali NAWAZ, BE-ABP LEETCHI: Drive Beam Electron Source Automation Control.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
Electronics Infrastructure Linda Bagby December 8-9, 2011.
Detector Control for the Insertable B-Layer Susanne Kersten Wuppertal University ATLAS Upgrade Workshop, February
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
LHCb Outer Tracker Electronics 40MHz Upgrade
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
T1 Electronic status Conclusions Electronics Cards:
ALICE Trigger Upgrade CTP and LTU PRR
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
CMS High Granularity Calorimeter (HGCAL) Beam H2 2017
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
The IFR Online Detector Control at the BaBar experiment at SLAC
Camera Connections 1 4 Connect camera to outlets inside grey box in the Pedestal. Turn Monitors on to channel 31. Turn toggle switch on, Aft plenum toggle.
The IFR Online Detector Control at the BaBar experiment at SLAC
Presentation transcript:

CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015

Outline 35T Power “Simple” scale of power to CERN single phase prototype (may be room for optimization) 7/30/2015T. Shaw | Neutrino Platform Meeting2

Early Block Diagram of 35T – slightly out of date 7/30/2015T. Shaw | Neutrino Platform Meeting3 Purity Monitor Drift HV Camera Trig_Scint TPC_PD DAQ(2)

35T test lab at Fermilab 7/30/2015T. Shaw | Neutrino Platform Meeting4 35T Test lab at Fermilab

Present Rack Configuration (excludes Drift HV) 7/30/2015T. Shaw | Neutrino Platform Meeting5

Rack Services – Rack Protection System (D. Huffman) Consists of two parts—chassis and smoke sensor (SS 2W-B) –Economical solution (~$650) –Design includes: System Sensor photoelectric smoke sensor. EPO (Emergency Power Off for UPS). +12V Voltage output interlock. Two sets of NO/NC interlock contacts, AUX1 and AUX2. Audible alarm. Front panel reset button. Status bit to Slow Controls. T. Shaw | Neutrino Platform Meeting6

Rack Services: AC Distribution Options used at 35T SurgeX: SX-1120-RT 120V/20A 6 switched outlets 2 un-switched outlets 1 FP courtesy outlet Interlock Eaton: PW309BA0U /3  /30A Requires AC Switch Box L21-30P, 5-20R D. Huffman T. Shaw | Neutrino Platform Meeting7

35T HV Drift Rack 7/30/2015T. Shaw | Neutrino Platform Meeting8 RACK Powered from one 120V/20A SurgeX: SX-1120-RT Same equipment can be used for CERN Prototype Installation

35T Trig_Scint Rack 7/30/2015T. Shaw | Neutrino Platform Meeting9 RACK Powered from one 120V/20A SurgeX: SX-1120-RT Questions: Do we have sufficient coverage with present 35T counters for CERN prototype? Will present equipment be reliable for CERN Proto and do we have spares?

35T TPC_PD Rack 7/30/2015T. Shaw | Neutrino Platform Meeting10 RACK Powered from two 120V/20A SurgeX: SX-1120-RT For CERN Prototype we anticipate upgrades: Photon Detectors plan will gang SiPM readout (groups of 3) and require: qty(15) 16-channel SSP (Silicon Photo-multiplier Signal Processor) Readout Modules (present SSPs are 12-channel) Required Pulser/Calibration units for CERN Prototype: qty (2) Pulsers for Photon Detectors – similar to SSP units qty (8) Pulsers for FE modules Weiner MPOD Crate for HV Wire Bias Will be very similar to 35T Weiner MPOD Crate for FE LV Right now a full 10 slot MPOD crate is being used to supply 5 independent voltage channels to each FE card. If we stay with this design, we will need 9 MPOD crates to supply LV for 6 APA’s FE modules.

35T Purity Monitor Rack 7/30/2015T. Shaw | Neutrino Platform Meeting11 RACK Powered from two 120V/20A SurgeX: SX-1120-RT For CERN Prototype, some type of purity monitor will be required. In the process of checking with cryostat team.

35T Camera Rack 7/30/2015T. Shaw | Neutrino Platform Meeting12 RACK Powered from one 120V/20A SurgeX: SX-1120-RT 35T has a set of 9 Cameras inside cryostat.

35T DAQ Racks (2) Each rack powered by one Eaton:PW309BA0U /3φ/30A and one 120V/20A SurgeX: SX-1120-RT Mostly similar equipment list, but we will need to have two ATCA shelves to support a quantity of 15 COB readout boards. DAQ racks to be enclosed air conditioned racks. 7/30/2015T. Shaw | Neutrino Platform Meeting13

Summary Table - Draft 7/30/2015T. Shaw | Neutrino Platform Meeting14