Follow up PDNA actions Chisinau, September 30, 2010. State Chancellery Government of Moldova.

Slides:



Advertisements
Similar presentations
United Nations University Institute for Environment & Human Security Global Platform June 2009 "Advancing Knowledge for Human Security and Development.
Advertisements

1 Comprehensive Disaster Risk Management Framework National Disaster Management Systems 1111 Introduction to Damage and Reconstruction Needs Assessment.
Cyprus Project Management Society
Cohesion Policy and Climate Change Viktoria Bolla DG ENV Unit C.1 ‘Climate strategy, International Negotiation and Monitoring of EU Action’ Tallinn, 4.
Progress and Strategic Directions in the Pacific Brussels, 07 July 2014 Michael Bonte-Grapentin, Senior DRM specialist.
Slum Situation Analysis
2008 Hurricane Season in Haiti Post Disaster Needs Assessment (PDNA) Damage, Losses and Needs Estimation.
Session 1 World Bank Institute Ricardo Zapata Marti UN ECLAC
The Philippine Experience Employment-led Post-disaster Recovery: The Philippine Experience Hon. Rosalinda Dimapilis-Baldoz Secretary Department of Labor.
NATIONAL DISASTER RECOVERY FRAMEWORK INDIA ANNUAL CONFERENCE OF RELIEF COMISSIONERS VIGYAN BHAVAN, NEW DELHI 27 MAY 2014 MINISTRY OF HOME AFFAIRS, GOVERNMENT.
Water Security in Iraq Anton Stemberger EU Delegation to Iraq.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
SEISMIC RISK REDUCTION Stela PETRESCU MDPWH PMU General Director Ministry of Development, Public Works and Housing ICAR FORUM, Bucharest, 1-2 October 2007.
National Disaster Risk Management Program NDRMP Belgrade, March
Session 301 Factors in Assessing Risk Mitigation Actions Impact reducing the identified risks and vulnerabilities in the community Probability that each.
1 CHAPTER 12 INTERNATIONAL FINANCING AND NATIONAL CAPITAL MARKETS.
Vulnerability Assessments and Adaptation to Climate Change Consultations on the Relationship between Climate and human rightsGeneva 22 October 2008 Festus.
United Nations Development Programme
MALAWI CAADP IMPLEMENTATION PROGRESS A PRESENTATION MADE AT THE FANRPAN REGIONAL POLICY DIALOGUE- MAPUTO, MOZAMBIQUE. 3 rd September, 2000 By K. Ng’ambi.
Financing Access to Basic Utilities for All Mobilizing Finance: Zambian Experience Sam Gonga DTF.
May 6-7, 2011 Academy House, Seoul. Ecumenical Challenge 1. Immensity of disaster 2. Need for capacity building and training due to insufficient experience.
1 INTRODUCTION TO DAMAGE AND NEEDS ASSESSMENT METHODOLOGY AND BASIC CONCEPTS Ricardo Zapata Marti UN ECLAC.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
“Community Based Approach to Local Development ”Project: Strategic context, nature, objectives and key characteristics.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
The Roles of Government and The World Bank Rodney Lester World Bank Istanbul December 8, 2005.
South Asia Earthquake: Transition from Relief to Development Joint Executive Board of UNDP, UNFPA, UNICEF and WFP New York, 20 January 2006 Presented by:
National Policy and Strategy for Agriculture, Forestry and Fisheries 15 March, 2004.
Czech Provincial Reconstruction Team in Logar, Afghanistan Assisting the people of Afghanistan in the reconstruction of their country and the development.
Session 6 Strategy formulation and climate change prioritizing areas for climate action and funding, linkages to development priorities including poverty.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
BACKGROUND  The Third SIDS International Conference comes at a time of great urgency for small island developing States  The problems and issues confronting.
TRANSPARENCY INTERNATIONAL GEORGIA 20 OCTOBER 2009 ONE YEAR AFTER BRUSSELS DONOR CONFERENCE.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
Mapping and Gap Analysis Summarised Preliminary Results.
LEDC CASE STUDY Flooding in Bangladesh. Effects of the floods Flood waters swept away and caused severe damage to railways, roads and bridges. This cut.
Dr. Le Van Minh SPRCC Program Deputy Coordinator Adviser to NTP-RCC Regional Clinic on the Design and Management of National Climate Funds – Bangkok, September.
Daniel Kull Senior Disaster Risk Management Specialist Global Facility for Disaster Reduction and Recovery (GFDRR) World Bank Geneva, 19 November, 2012.
Damage and Losses Evaluation in Cases of Disasters An Introduction to the ECLAC methodology J. Roberto Jovel, Consultant.
The Early Recovery and Reconstruction Cluster in Pakistan - From saving lives to restoring livelihoods - Angelika Planitz UNDP BCPR Shelter Meeting May.
Environmental, cultural and historical damages To ecosystems (marine life, cays, reef, natural reserves, ecological parks, etc.)To ecosystems (marine.
Assessment of Damage and Losses after Disasters (PDNA)
Session 8Slide 8-1 The Mitigation Plan Session 8 Slide Deck.
Developing a Recovery FrameworK United Nations Development Programme Bureau for Crisis Prevention & Recovery Bangkok, Thailand November 2010.
International Recovery Forum 2014 ~ The Role of Private Sector in Disaster Recovery ~ 21 January 2014 Kobe, Japan Dr Janet L. Asherson THE LINK BETWEEN.
R&D STRATEGIES IN SUPPORT OF INDUSTRIAL TRANSFORMATION Arm.Dpt. ROMANIA MINISTRY OF DEFENCE ARMAMENTS DEPARTMENT 01 November 2007.
Damage Overview Overall damages assessment Environment Productive Social Infrastructure Total Damage.
Moldova Floods Joint Government and Development Partners response Chisinau, July 29, State Chancellery Government of Moldova.
European Commission EU policy response to the crisis EU policy response to the crisis ILO Thematic Dialogues Geneva, 4 June 2009 Robert Strauss, DG EMPL.
Multi-stakeholder Dialogue on Benchmarking Water Quality and Services Brussels - 9 September 2014 The ECI 'right2water' Commission response.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Disaster Risk Management Concepts and Applications Southern Province of Sri Lanka 1.
1 Ensure the consistency between sectoral plan, strategy and budget PRSP Forum, April 2006.
1 Mongolia - Vision Long term vision All residents of the capital city (Ulaanbaatar) of Mongolia will have access to improved water supply and sanitation.
National Plan for Food Security and Poverty Reduction A Thought Exercise.
November 7th 2009, the combined effect of Hurricane IDA and low-pressure system off the Pacific Coast led to heavy rainfall (355mm in few hours) Severe.
A Presentation to the 2017 GEO Work Programme Symposium,
San Bernardino County OES
Disaster and Emergency Planning
Sendai Framework for Disaster Risk Reduction
NEPAL RECOVERY TO RESILIENCE
CREATION OF ENERGY EFFICIENCY FUND
First meeting 28 September 2006 Council of Ministers
District Disaster Risk Reduction Managment Plan
Mapping and Gap Analysis
The Islamic University of Gaza- Higher Studies Deanery
Dominica: Needs Assessment and Recovery Strategy
Responses to the Crisis An Urban Perspective
The U.S. Department of Homeland Security
Responding to Changing Climate Washington State Department of Ecology
Presentation transcript:

Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova

2010 Floods - background  people in 16 districts affected,1.085 flooded households  Adverse economic impact on GDP of about 0.15 percent  Total damage and losses estimated at USD 41.9 mln (damage – USD 18.3 million; losses – USD 23.6 million)  Damage sustained in the infrastructure sector was 67 percent and in the productive sector was 26 percent of total  Damage concentrated in housing (USD 6.5 million or 36% of the total), transport (USD 4.8 million or 26 percent), and agriculture (USD 4.4 million or 24 percent)  Structure of losses concentrated heavily in the infrastructure (70 percent) and productive (24 percent) sectors  Human dimension critical in terms of lost incomes and property making the affected population especially vulnerable (13,000 persons affected)  Short and medium term needs produced by the flood equal 77.5 mln USD or 1.4% of 2010 GDP

PDNA Outline Overall Objective: determine the impact of floods and financing needs for recovery and reconstruction Short-term impact mitigation; identify recovery and reconstruction needs; financing requirements Medium and long term Elaborate measures to reduce the risk of future floods and other hazards Improved disaster risk management strategy

Damage, Loss and Financial Needs by Sector

Government Actions  Continued dialogue with Development Partners  Rigid coordination and reconstruction measures  Reallocating finances from own resources for reconstruction efforts  Action planning for implementing PDNA recommendations and findings

Continued dialogue with Development Partners  Communicating with international partners during the reconstruction process  Continuing financial and material support from donors. Pledges at the moment of around 38 mln USD.  Immediate donor response for emergency aid - Food, water, hygiene, health, protection and prevention, shelter and security  Monetary and in-kind contributions for mid-term reconstruction efforts  Financing of mid- and long-term actions  Major destinations of support – disaster relief, disaster risk management, reconstruction efforts

PDNA Action Plan Action Plan to be approved by Government Decision and incorporated into line ministries reporting system Short- and mid-term recommendations from the PDNA exercise combined with long- term priorities elaborated internally. Main components:  Infrastructure (reconstruction of dams, housing, energy, transport, water and sanitation)  Productive sectors  Social  Cross-sectorial (environment, disaster risk management, cadastre system, scientific basis)  Legal and regulatory framework

Coordination and reconstruction measures Commitment at all Government levels. Major stakeholders inside the Government: -State Chancellery -Ministry of External Affairs -Ministry of Economy -Ministry of Finance -Ministry of Construction and Regional Development -Ministry of Transport -Ministry of Internal Affairs -Local Public Administration

Reconstruction actions  Housing: 703 houses to be built; contracts awarded and works started for the construction of 694 houses. Contracts amount – 16.9 mln USD.  Transportation: 10.8 mln USD allocated for roads reconstruction. Railway already reconstructed.  14 companies involved in works, creating around 2000 jobs, most of them for locals.  Committed from Government resources (contracts signed): 27.7 mln USD, out of which 3,04 mln USD paid in advance for Contractors. Sources not yet fully allocated.  Social infrastructure – funds allocated to LPA.  Water and sanitation, natural gas supply – design works under way.

Finances from own resources allocated

Further action  Financial deficiencies in funding the 77,5 mln USD needs spanning to mid-term (long-term needs higher)  Tighten monitoring and coordination of reconstruction efforts  Improve transparency of funds use from the Special Account – regular detailed reporting of incoming funds and their destinations  Finalize and approve the Action Plan with Government Decision, incorporate it in the line Ministries’ programs and reporting systems

Follow up PDNA actions Donors Meeting, September 30, State Chancellery Government of Moldova