API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation.

Slides:



Advertisements
Similar presentations
Technology readiness levels in a nutshell
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
Hytera Communications Corporation Limited Hytera Typical application Case archive template v.1 Customer name: Country/Region: Industry:
Don Wells Hess Corporation
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Don Wells Hess Corporation
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
Levetidsforlengelse av Existerende felt Oppgradering av kontrollsystemer subsea Erfaringer og losninger fra Tordis og Vigdis February 8 th 2012.
Monitoring, Control & Reporting. The nature of control Develop a structured plan - the “baseline” for control Monitor the plan Assess current and forecast.
Development Processes and Product Planning
IS&T Project Management: Project Management 101 June, 2006.
Course Material 1.Overview of Process Safety 2.Compliance with Standards 3.Process Hazard Analysis 4.Standard Operating Procedures 5.Safe Work Procedures.
Product Lifecycle Management
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
Cover graphic should fill and not exceed the defined grey box. June 14 th, 2012 Gary Devlin API SC 18 – Quality Product Life Cycle TG7.
Effective Methods for Software and Systems Integration
Taking SMEs from Word-based narrative to topic-based structure.
EngageNY.org NYSCEA Presentation Friday, March 1, 2013.
Discussion Items with Bruce
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
PRODUCT TRANSFER.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Don Wells Hess Corporation
The Business Plan- Creating and Starting the Business
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
UK Link Programme Update to PNUNC June 17 th 2013.
{ Phases of Project & life cycle Prepared by: Syed ShahRukh Haider.
PowerPoint Template Click to edit title style  How do I incorporate my logo to a slide that will apply to all the other slides?
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier.
QAQC for KM3NeT QAQC Group - 5th VideoMeeting Quality Plan...how to communicate about it? , QAQC group, 5 th videomeeting, Laurence CAILLAT 1.
API 18LCM (Life Cycle Management) Report back to SC17 August 27, 2015 Review Team: Dave Wilkinson, John Strut, Smarty John, David Saul, Peter Moles.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
1 Program Release 2008 Update to the Administrative Council August 9, 2007.
Monmouth County Multi-Jurisdictional Hazard Mitigation Plan Update.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
Developing a Project Management Standard for Your Organization Francine DiMicele, PMP June 08, 2015 NC Piedmont Triad Chapter.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
19th January 2012 Don Wells (Hess)
PlusAlpha Risk Management Solutions, LLC Barrier and Project Interface Management The Keys.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
A Tutorial Institutional Research and Effectiveness.
Supplier Management Can’t live with them, Can’t live without them!
Fall CS-EE 480 Lillevik 480f06-l4 University of Portland School of Engineering Senior Design Lecture 4 Definition phase Design phase.
Task Group Status January ,11, 2017
API 17X Subsea Boosting January 13, 2015
Life Cycle Models PPT By :Dr. R. Mall.
NRC Cyber Security Regulatory Overview
API 17Q – Subsea Equipment Qualification
PowerPoint Template
First 8 slides are what was presented in San Fransisco…
Don Wells Hess Corporation
PowerPoint Template
Ppt宝藏提供支持.
PowerPoint Template.
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
PowerPoint Template.
Presentation transcript:

API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation

History / Status Document released in 2009 Specification contains: – Life Cycle Process (LCP) – Define, Plan, Implement, Feedback (DPIF) Loop – 12 Key Practices (KP) – Technology Qualification Process – Technology Readiness Level

Why Change? BSEE Wants: – Prevent Prescriptive Standards – Self-regulation by the Industry Issues with 17N: – Operational Goals & Requirements – Unbalanced Life Cycle Processes – Technology Readiness Level Use & Implementation

Plan / Path Forward Process – Split into 5 subgroups – Industry Leaders – Common Template Introduce IM into the scope of 17N: – Define IM – Expand the Life Cycle Processes – Reassessment through remediation – Define TRL progression

Detail Expand the LCP – Provides balance and depth to the document – Communication of goals & requirements 5 Feasibility Concept Selection FEEDDetailed Design Manufacturing & Assembly SIT, Installation, & Commissioning OperationDecommissioning

Detail Change to a Dual-DPIF Loop D efine – P lan – I mplement - F eedback – Add Remediation cycle – Facilitates Integrity Management

Detail

Change to a Dual-DPIF loop – Add Remediation cycle – Facilitates Integrity Management

Next Remaining challenges: – Incorporating Human Factors – Decommissioning (Well Abandonment) – Document Matrix – Technology Qualification Appendix 17N is currently in first edition drafting Final Draft Review late-Q Peer & Industry Review Q Submittal Planned Q4 2013