FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department

Slides:



Advertisements
Similar presentations
L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Kathleen Ratcliffe BC2/Linac Installation April 16, BC2 / Linac Installation Coordination Kathleen.
Scientists Leverage WebFOCUS and FOCUS to Manage a Program Joseph P. Ring, Ph.D., CHP Radiation Protection Officer.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
ESTB Test Beam Procedures User Support Operations Schedules Carsten Hast March 17 th 2011.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
FACET Safety and Procedures Christine Clarke August 29 th 2011.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Safety Oversight for SLAC Accelerator Department Operations
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Updates Assessments available online Resources available Online testing components Testing Coordinator Quick Checklist Technology Coordinator Quick Checklist.
LCLS NEH Operational and User Safety Programs
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
 After a near miss or incident when asked what happened your most common reply is “ I thought it would work”  This is only the tip of the iceberg.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started + Information for Reviewers AMS World Marketing Congress /
1 Leah Walker California Department of Health Services Division of Drinking Water and Environmental Management October 2001 DHS TurboSWAP Welcome to TurboSWAP,
By Reza Esfandiari, SULI Program Mentor: Carsten Hast August 14, 2009.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Component 8 Installation and Maintenance of Health IT Systems Unit 1a Elements of a Typical Electronic Health Record System This material was developed.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
AboutFACET What is FACET Current Research PUBLICATIONS NAVIGATE UP Dielectric Wakefields.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
End Station A Test Beam Facility ESTB Carsten Hast SiD Workshop SLAC, January 16-18, 2013,
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 7 PowerPoint presentation Supporting information.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Test beam check list Michael JECKEL EN-EA-EC.
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
SLAC Accelerators Power Electronic System Operation for Reliability
LUSI Coordination with LCLS
ACCU meeting - D.Chromek-Burckhart – Users’ Office
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
End Station Test Beam (ESTB) at SLAC
J. Seeman Assistant Director for PPA/LCLS
Installation of Photon Beam Transport to FEH
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
Electron Beam Systems ETC and Methodology
X-Ray Endstations Update
Endstation Systems, Installation Costs and Schedule J. Hastings
T-489: Induced Activity and Residual Dose Rates
DOE Review of the LCLS Project October 2006
Safety Program for LCLS Experiments
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department

3/18/2010FACET User Support 2 Apologies I was rather distracted with work for a new Test Beam Project at SLAC: End Station A Test Beams (ESTB) Use 5 Hz of LCLS 14.6 GeV e- beam in ESA for ILC style Machine Detector Interface and Beam Delivery System studies Can produce single electrons and hadrons for detector development studies Interested? to

3/18/2010FACET User Support 3 Past to Future Until 3 years ago the Experimental Facilities Department (EFD) supported users in FFTB and ESA etc. Since 2 years Test Facilities Department (TF) is operating ESB and NLCTA –Mostly SLAC, no users Since this year TF is supporting all test facilities (ASTA, ESA, ESB, FACET, NLCTA) –All programs are growing at the same time –TF is growing (currently 2 Techs, 2 DAQ/Controls, 1 LLSO, 5 Physicists) –Developing user support Here is what we can do Tell us what you need

3/18/2010FACET User Support 4 SLAC A SLAC PI will be assigned to each experiment Training requirements –Every user will need a SLAC computing account –Many training items can be done remotely via web training –Couple of things on first day of arrival Need to clarify what general training will be needed Will setup a web page which will lay out what you need to do and when (no training, no work)

3/18/2010FACET User Support 5 After your proposal is accepted Experimental setup needs review and approval to be installed and operated at SLAC –Safety Oversight Committee (SOC) Brand new process (rolled out on March 1 st ) Looks at experimental equipment and will request Safety Officers and others to review your setup –TF will be instrumental in getting the necessary approvals for you We know how the system works We are part of the system We can do many things for you – If you tell us what you want to do This process can be quite fast for “normal” setups But if you’ll need “more exotic” components (e.g. hazardous gases) will take more time –Electrical components need to be UL listed (or equivalent) That’s a tough one, because many devices you are using in your home institutes are not! SLAC has an inspection process to approve non listed devices –TF can do that –Radioactive sources need to be registered with RP

3/18/2010FACET User Support 6 SLAC With the end of EFD we lost some capabilities for machining parts, especially quick turn around and installation support –Need to reestablish that, though I fear it will be on a reduced level compared to years ago Mechanical Fabrication Department (MFD) is very good, but can be slow Most of the vacuum work will be done by the SLAC vacuum shop  needs scheduling Heavy equipment needs to be lowered by the SLAC Riggers  needs scheduling Alignment group is available on short notice, but fiducialization will need time If you need things which don’t exist yet (special gases, cables, lasers, etc.) we need time (and money) to install these Special DAQ needs will need time to be implemented TF should be your point of contact to start your quest to be successful at SLAC

3/18/2010FACET User Support 7 Location of FACET More or less in the middle of nowhere Will establish a User building this year at S20 –Parking will be interesting –Bicycling is a good option Need lights Can be quite wet in winter Underground without easy access  Very careful planning of the experimental setup, the installation procedure and the operation is key to success Carrying equipment up and down the stairs is very limited (I don’t want to see anybody in the middle of the night carrying a scope in their hands into the tunnel!) Need to install a small crane to lower stuff up and down ourselves Tool box down in the Linac (need to know what you will need) Very small workshop (drill press, saw etc.) in klystron gallery but remember: No training, no work!

3/18/2010FACET User Support 8 Reuse of old FFTB equipment We build quite a few specialty items, like the sliding vacuum table with 2 beam lines –Reuse The FACET user community should agree on some common tools, dimensions etc. to make life easier, faster and cheaper Mark and I will list some inventory of things we have available

3/18/2010FACET User Support 9 Summary Users will have a SLAC PI who will be responsible for their training assessment and work authorization and work release Users will be responsible to only do what they have been trained, authorized and released to do TF will be your point of contact to get started with your equipment here at SLAC TF will assist with equipment installation and the coordination with other services needed (rigging, vacuum, alignment, etc) Special requests (DAQ, hardware, gas, laser) will need time to be implemented Careful planning ahead will be a key ingredient to make you experiment a success