Australia Telescope Users Committee Technologies Report - Oct 2008.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
ATNF Scientific Software – an overview Mark Wieringa – ATNF/Operations/SCA.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Phil Edwards Head of Science Operations CSIRO Astronomy and Space Science Science Operations.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
Interference Daniel Mitchell, ATNF and Sydney University.
ATCA and Mopra Phil Edwards. VSOP observations with ATCA 190 observations with Mopra.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Receiver Systems Suzy Jackson – based on previous talks by Alex Dunning & Graeme Carrad.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
 Defining the RF jamming system and showing the importance and need of using it in many places.  Giving a complete RF jamming system design based on.
Technologies for Radio Astronomy Graeme Carrad | Assistant Director - Engineering Mark Bowen | Group Leader – Front End Technologies JULY 2012 CSIRO ASTRONOMY.
BY MD YOUSUF IRFAN.  GLOBAL Positioning System (GPS) receivers for the consumer market require solutions that are compact, cheap, and low power.  This.
RPG Radiometer Physics GmbH Japan Met. Agency – Tsukuba / Japan, Nov./Dec RPG RPG founded in 1973 Specialized in the design and fabri- cation of.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Phased Array Feeds John O’Sullivan SKANZ 2012 CSIRO Astronomy and Space Science,
Wideband Imaging and Measurements ASTRONOMY AND SPACE SCIENCE Jamie Stevens | ATCA Senior Systems Scientist / ATCA Lead Scientist 2 October 2014.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
FPGA-based Dedispersion for Fast Transient Search John Dickey 23 Nov 2005 Orange, NSW.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Spectral Line VLBI Chris Phillips JIVE The Netherlands Chris Phillips JIVE The Netherlands.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
Lab Group L2Bx EECE 380 – Electrical Engineering Design Studio (Spring 2014) 1 Spectrum Analyzer Michael Halpenny-Mason, Presenter 2, Presenter 3, Presenter.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
CABB update Philip Edwards Head of Science Operations 14 October 2010.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
1 Advanced ATNF Correlators Dick Ferris AT Electronics Development Group May 2003.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
Operations Philip Edwards Head of Science Operations 28 October 2008.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
ATUC meeting Director’s Report Brian Boyle May 2008.
GBT Focal Plane Array Development Program Steven White Program Manager.
The Correlators ( Spectrometers ) Mopra Induction - May 2005.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
Graeme Carrad Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 28 June 2011 Australia Telescope Users Committee Technologies.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
Atmospheric phase correction at the Plateau de Bure interferometer IRAM interferometry school 2006 Aris Karastergiou.
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Australia Telescope Users Committee Technologies Report - Nov 2007.
ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback.
1 Advanced ATNF Correlators Dick Ferris AT Electronics Group.
Australia Telescope Users Committee - Technologies Report - May 2008.
K-Band Focal Plane Array Steven White Program Manager.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
MSK-200 TV Signal Analyzer 6-In-One TV Test Solution  Installation, repair and maintenance of professional Analog and Digital terrestrial, CATV and satellite.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
Future LBO Developments
Receiver Systems Signal Processing.
The ELENA BPM System. Status and Plans.
Mini-drawers, FE-ASIC , Integrator
WP02 PRR: Master Oscillator and RF Reference Distribution
Local Oscillator Generation - Internal.
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Radio Astronomy Spectrum Management in practice – Australia (ATNF)
EVLA Advisory Committee Meeting System Status
Tri-Band RF Jamming System
Early indications of performance
Mark McKinnon EVLA Project Manager
Australia Telescope Users Committee Technologies Report – October 2011
EVLA Advisory Panel Mtg. System Overview
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

Australia Telescope Users Committee Technologies Report - Oct 2008

Staff changes Simon Mackay hired as a new technician in Front End Group. John Tuthill as an engineer in the Back End Group.

O/ERTM DSP Board O/ERTM DSP Board O/ERTM DSP Board O/ERTM DSP Board RTMO/E DSP Board RTMO/E DSP Board RTMO/E DSP Board RTMO/E WD DM Local oscillator distribution (Control building) Advanced Telecom Compute Architecture (ATCA) rack Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) Patch Panel 32 MHz distribution Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) WDM Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) WDM Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) WDM Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) WDM Conversion sampling Electrical to optical scheme Local oscillator distribution (antenna) WDM O/ERTM DSP Board O/ERTM DSP Board O/ERTM DSP Board O/ERTM DSP Board RTMO/E DSP Board RTMO/E DSP Board RTMO/E DSP Board RTMO/E WD DM O/ERTM DSP Board O/ERTM DSP Board O/ERTM DSP Board O/ERTM DSP Board RTMO/E DSP Board RTMO/E DSP Board RTMO/E DSP Board RTMO/E WD DM

CABB demonstrated a three element interferometer at 128MHz bandwidth in August 08. CABB has interim system hardware installed on five antennas, and has demonstrated 2GHz bandwidth 2048 channel autocorrelations on all data streams. Software developed for online amplitude, phase and delay calibration. CABB system testing continuing, also in parallel with normal array operations. Compact Array Broadband Backend – CABB (1)

Build complete for CABB DSP cards, testing continuing. RF and IF module build complete, LO and Reference Modules are 75% complete. CABB Digitisers are 65% complete. Delayed due to delivery problems with de-mux chips. Have now received all of the outstanding de-mux chips. CABB RTMs have been built and tested, with exception of 8 boards which need to be fitted with ROSAs The hardware required to implement the interim 5 antenna single frequency 2GHz bandwidth system is now available. Compact Array Broadband Backend – CABB (2)

20/13 and 6/3cm Upgrade (1) A project review showed a doubling of the initial cost to complete the full upgrade. This required the consideration of the project against other commitments of the ATNF. The project can be split into three steps: Step 1. Routing existing cm receiver signals into the CABB system. OMT fin retro-fit. Step 2. Broadbanding the 20/13cm receiver system Step 3. Broadbanding the 6/3cm receiver system.

ATNF is committed to Step 1 and it will cost ~$1m This comes at the cost of non-simultaneous observations at 20cm and 13 cm. An option exists to recombine the 20 and 13 cm signals in another module to achieve simultaneous observing and very preliminary estimates put the cost of this ~$300k. 20/13 and 6/3cm Upgrade (2) Step 1. Routing existing cm receiver signals into the CABB system.

Step 2. Broadbanding the 20/13cm receiver system Step 3. Broadbanding the 6/3cm receiver system. These other two steps will cost ~$1.4 million each in isolation and the whole project (Steps 1, 2 and 3) ~$3.2 million. Scientific input via the Project Scientist, NMcG, and endorsed by the Steering Committee, prioritises the 20/13 step over the 6/3 step. The Steering Committee – The ATSC recommends that the ATNF aims to complete at least stages I and II of the LSCX upgrade provided that can be done without significant impairment of the delivery of ASKAP. The ATNF will review resource availability with the aim of achieving Steps I and 2. 20/13 and 6/3cm Upgrade (3)

LSCX Upgrade (4) Parts for two OMT fins have recently been assembled and tested. They are now at Narrabri ready for retofitting. Others are fabricated as workshop time allows. The risk inherent in the development of a three stage 1- 3GHz amplifier has been lessened by the development of a two stage amplifier that gives good performance.

Parkes 13 mm receiver (1) - Installed

Parkes 13 mm receiver (2) - Preliminary measurement carried out using spectrum analyzer, single polarisation only (A), circular feed, yields Trec ~25K and Tsys ~60K. A broadband measurement (20 – 22GHz) of B polarisation carried out simultaneously gives a result for Tsys ~60K. Problems with the cold load, weather and time prevented any further measurements being carried out. John Reynolds’ first estimate of Tsys on Jupiter is ~280Jy, approx ≥4dB improvement over the existing receiver. Preliminary Performance

First Observation New detection of H 2 O Maser. Observation carried out by Jose-Francisco Gomez and P616 team. Parkes 13 mm receiver (3) - De-rippling Experiment Observations of a strong Ammonia source, G showing strong (1,1) and (2,2) transitions. The plot shows two observations taken one after the other, the first (upper panel) with no special 'de-rippling' measures, the lower taken in a mode where the receiver is moved cyclically up and down to 'smear out' the ripple. Experiment carried out and data provided by John Reynolds.

PDFB External contracts Five systems in total have been constructed for Jodrell, Effelsburg, Sardinia, Urumqi and Miyun. Engineers from Jodrell (1), Beijing (1) and Urumqi (2) were on site early October for training. Testing at Parkes from 11 th to 14 th October. Crated and ready for shipment this week.

Water Vapour Radiometers The existing units have been tested and shown to have satisfactory performance. The fabricating company (AstroWave) has submitted all mechanical designs and anticipates the delivery of all commercial components in November.

ATCA 7mm upgrade 7mm upgrade for Mopra Parkes 13 mm receiver PDFB3 PDFB external contracts CABB 20/13 and 6/3 cm upgrade ASKAP Water Vapour Radiometers CA Upgrade to 115 GHz Mopra Multibeam FPA for Parkes StudyFabrication or Operations projects ?? L/S C/X