E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.

Slides:



Advertisements
Similar presentations
EMCal DCS Status By B. S. Nilsen, M. Cherney, J. Fujita Creighton University For the EMCal project.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
16JAN08CaloECSMeeting - Xvc1 Calo ECS meeting DCS and PS/SPD temperature monitoring Xavier Vilasis-Cardona.
COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.
M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
DS420 Case study – a reference counting problem 1.0 Clark Elliott Instructor.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
Lightning Detector Michael Bloem December 5, 2002 Engr 311.
Control & Monitoring of DC-DC Buck Converters Satish Dhawan Yale University Power Distribution Working Group Meeting- Tuesday 24 February 2009 ATLAS Upgrade.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Contributed by: Integrated Teaching and Learning Program, College of Engineering, University of Colorado at Boulder.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
CALO News Pascal Perret LPC Clermont 26 November 2014.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Status of NA62 straw electronics Webs Covers Services Readout.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
Production I.Yield. II.Acceptance criteria. III.Test. PS & SPD LHCb Calo PRR – March 2004 – CERN.
MP3 List of main Issues during March 2010 MP3 - Team.
Evgeny Gushchin (INR,Moscow) 23-Feb-2009 Calorimeters meeting, CERN Status of PS/SPD LED tuning C-side : SPD, PS A-side : PS Some statistics, problems.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
CALO News Pascal Perret LPC Clermont 22 January 2012.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
2009: restart the system: few observations. Hw maintenance week:
Electrical and electronic systems projects
Presentation transcript:

E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning To do

E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status on A-side PS: After first tuning there were two things remaining to do: –One “hot” LED –There were no data from FEB6 Status: “hot” LED – was not a problem of unstable resistor, just tuning (good news!) After FEB6 show data it was tuned, some LED may be still too low. SPD: It was tuned without presenter in Two problems arrived: –two LEDs (in SPD6-2 and SPD8-2 bias lines) seem dead with shortcut. This brought all LED in group lost regulation. – LEDs to be cut off. –Regrouping of DCS lines –Bad news: During last week one more LED died! Again in the same group of SPD6-2 bias line. This is a very first observation during all the time after LED system installed. Investigation is going on, few hypothesizes… Status: 2 LEDs are located and cut Regrouping was effective. Only few (<10) LEDs need to be tuned.

E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Some problems Dead LED Two hypothesizes: 1.Accidental death (aging, mechanical stress of LED after machining) 2.Electrical damage (overload, discharge, unstable contact) If it is p.1 or instability of contacts, it is difficult to identify but it should go away with time. If it is problem of regime of operation, it needs urgent investigation. Ways of investigation: 1.Check of electrical circuit on detector. 2.Investigate some extreme regime “on table” One idea came: LED bias at 4000 counts (DCS) sends -5.2V on SPD6-2 line, this exceeds the absolute rating value of reverse bias (5V). Therefore the “default” DCS setting is changed now to 3000 counts, which is safe both for PMT and for LED. Now I study in details how to kill LED on table: overvoltage, transient effect.

E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN PS-A delays

E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN PS-C delays

E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Plans for this week To have an access to SPD-A site (from today evening) in order –to tune remaining LEDs –To fix dead LED –To check SPD6-2 line and circuitry In case of access to PS to tune few more low LED. To continue monitoring of PS/SPD To study urgently dead LED case.