Presentation to Traffic Working Group February 6, 2014.

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Congestion Management System The Mobility Management Process.
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation GPA Conference Fall 2012 Presented By: David Pickworth,
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
5/19/20151 Segoe Road Proposed Remarking Plan Scott Langer Traffic Engineer City of Madison Traffic Engineering Division Madison, Wisconsin.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
Lec 28: Ch3.(T&LD): Traffic Analysis – Traffic assignment Learn how to assign generated and distributed trips to the street system approaching the site.
Highway Capacity Software (HCS) – Part II
An MPO “Big Data” Application Colorado Springs Metropolitan Planning Area Congestion Management Process 15 th TRB National Transportation Planning Applications.
1 Example of How Bus Stop Inventory is Used and Issues are Addressed.
Ch. 4 Traffic Control NY State DMV.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
Southern Nevada HOV Plan Update ITE Luncheon July 17, 2014 Jeff Lerud, Project Manager.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Tshwane Line 1 Traffic Simulation Results October 2012.
Driving Directions You may take 470 northbound, just after exiting the airport (see map), and follow it northwesterly 18.5 miles to I-25. User without.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Network effects from improved traffic signals Kristina Schmidt Transek AB.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Traffic Flow Parameters Surface Street Application.
The Stockholm trials – Emme/2 as a tool for designing a congestion charges system 1.The trials and the congestion charges system 2.Observed effects 3.Transportation.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
A stop sign is a traffic sign that stands for coming to a complete stop at an intersection or end of the road.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Transport Challenges in Northwest Auckland Presentation to Independent Hearings Panel Ian Clark 14 April 2016.
Congestion Management Process / Performance Measures Report
Proposed Zone RR Here’s a map of the City’s preferential parking zones, with 4th Street and adjacent. The residents petitioned as they were concerned with.
How to Read a Bus Schedule
Friday, December 16th.
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
FM 518 By-pass Traffic Review
Traffic Circulation/ Parking Restrictions
Strategic Plan proposed timeline
Sanford Creek Elementary School (Precinct Polling Place)
Elapsed Time.
Proposed Driscoll Expansion Brookline, Massachusetts
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
RTC RIDE Service Improvement Recommendations
Cambourne to Cambridge Better Bus Journeys: On Road Option
Broward County Congestion Assessment
State Route 55 Improvement Project from Interstate 5 to State Route 91
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Black Mountain Parking & Circulation Study
Presentation transcript:

Presentation to Traffic Working Group February 6, 2014

What is the Proposed Project? US 52 Interim Improvements Salem Creek Connector Business 40 Research Park Blvd Peters Creek Pkwy Interchange

Business 40 Closed How Do We Understand Patterns? Detour Scenario 1 -Business 40 fully closed -Broad Street, Marshall Street, and Cherry Street overpasses are closed Broad St Marshall St Cherry St Detour Scenario 2 -Business 40 fully closed -Broad Street, Liberty Street, and Main Street overpasses are closed Broad St Liberty St Main St

Where Would the Traffic Go? 40,000 Additional Vehicles 20,000 Decrease in Vehicles 16,000 Increase 12,000 Increase 22,000 Increase Business 40 carries approx. 75,000 Vehicles per Day

What Did We Study?

What Did We Discover? 2011 Existing Conditions 2011 Existing Conditions –76 – Level of Service D or Better –14 – Need Improvements (Level of Service E/F) 2021 No Build Conditions 2021 No Build Conditions –74 – Level of Service D or Better –16 – Need Improvements (Level of Service E/F) 2021 Detour Conditions Scenario Detour Conditions Scenario 1 –71 – Level of Service D or Better –16 – Level of Service E or F 2021 Detour Conditions Scenario Detour Conditions Scenario 2 –66 – Level of Service D or Better –20 – Level of Service E or F

What Did We Discover? Area 2Area 1Area 4 Area 3

What Did We Discover? Area 2 Scenario 1& 2

What Did We Discover? Area 3 Scenario 1 & 2

What Did We Find Out? Area 2 - Recommended Improvements at 2 Intersections Area 2 - Recommended Improvements at 2 Intersections –First St at Northwest Blvd –First St at Hawthorne Rd Area 3 - Recommended Improvements at 2 Intersections Area 3 - Recommended Improvements at 2 Intersections –Marshall St at Academy St –Peters Creek Pkwy at Silas Creek Pkwy –Peters Creek Pkwy at Silas Creek Pkwy

What Are We Presenting Tonight? 4 Intersection Boards 4 Intersection Boards –Results for each Scenario –AM and PM Peak Hours Daily Flow Board Daily Flow Board –Daily traffic along major routes –Colors indicate Roadway Flow Overall Intersection Board Overall Intersection Board –Peak Hour Intersection Performance

What Do the Colors Mean? Level of Service (LOS) Level of Service (LOS) –LOS A – C Minimal Wait –LOS D Moderate Wait –LOS E Wait At/Above Roadway Capacity –LOS F Wait Substantially Exceeding Roadway Capacity

What You Told Us BUSINESS 40 CLOSED X X X X X X X

Let Us Get To Work Now Groups Groups –Each Group selects a Spokesperson Part I Part I –Review each of the 4 Intersection Boards o Provide input on any other issues/comments –Review the Overall Daily Flows Board –Identify detour routes and mark them on your map –You have 60 minutes for this effort Part II Part II –Present group findings to all

Questions?

Presentation to Traffic Working Group Thank You!