Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,

Slides:



Advertisements
Similar presentations
Contracts for Builders Ross Kinzler, Executive Director.
Advertisements

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Task: Verify completion of pre-work To see this in PennWorks...click herehere Task Definition: After the authorized work has been completed, the person.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Alistair Wells Glen Hutchinson
Setting Up The Project Project Manager Academy Section Five JOB LOOP 5.0Post Project Review 4.0Project Management 3.0Project Pricing 2.0Project Estimating.
1 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES Rocky Mountain Steel Construction Association Structural Engineers Association of Colorado Structural Engineers.
First Article Inspection Report
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
Project Closeout Issues A Review of Critical Tasks Required During the Closeout Process.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Project Close Out CTC-470.
Conditions of the Contract for Construction
Subcontracting. Subcontractors % of work is subbed –Significant impact on costs and schedule –Want to develop a working relationship with good.
PROCEDURES FOR SELECTING THE CONTRACTOR
Placing Order Approval Process Manufacturing Delivery SUBMITTAL PROCESS.
Working Drawings Chapter 12.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Construction Contract Documents
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives.
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Owner Has Idea and Conducts Feasibility Study GoNo Go End of Project Pursue A/E Hire A/E to Design Project Scope of Work Defined Contract Negotiated Go.
Job Order Contracting Process Bob Bourg, Claims & Disputes Manager Marlene Anglemyer, Cost Engineer.
Tips on Routing and Contracts: An Intro for the Campus Research Coordinator Michelle Artmeier Director of Award Services Ron.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Document and Record Keeping CTC-470. Project Files Important tools –Indispensable for managing project –Must have a logical organization –Must have documents.
© 2015 Universal Service Administrative Company. All rights reserved. Direct BEAR Payment Process E-rate Program Applicant Training Washington DC Tampa.
CVE 4070 Construction Engineering Shop Drawings Quality Control
Contract Training Class I
INSPECTION OF SCHEMES. PROCESS OF EARLIER INSPECTIONS INSPECTION TEAM VISITS GRAM PANCHAYATS. ASKS FOR SCHEMATIC DOCUMENTS. FILLS THE INSPECTION FORMAT.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Lynnette Roshell
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Measurement and Payment
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Building Code Overview.
Mitch Moncur Project Management Manager Project Management – Receipt of Order Confirm: Signed Purchase Order - Reviewed by Builder for Clarity - Returned.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Subcontractors and Suppliers Procedures for Receipt of Payment.
1 Today’s pegboard Drawings & Specd due 11/21. 2 Today’s pegboard Cirrious Tightpinch.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Contract Compliance Training
+ WHY KNOWIFY MAKES SENSE FOR GAF FACTORY-CERTIFIED CONTRACTORS
Purchase order management process
Contract Compliance Training
Department of Community Development
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Completing the State Aid Payment Request
Force Accounts.
Delegated Contract Process for Federal Construction Contracts
Testing & Inspecting QC starts with submittals
AGREEMENTS OFFICE Support Agreement (SA) Process
Georgia Tech Facilities INC.
The Contract Review Process
Working Drawings Chapter 12.
Diversity management system (DMS)
Presentation transcript:

Submittals

Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase, deliver, and install is in fact what design team intended in drawings and specs –One last check –First step in QC

Types Color charts Coordination Drawings Cut sheets of product data Fabrication drawings Samples Mock ups Shop drawings

Types One of the final design steps –Construction drawings do not show adequate detail for fabrication & production of many parts –Shop drawings supplement, enlarge or clarify design –Shop drawings prepared by fabricator and reviewed by engineer –Other submittals could include carpet and paint swatches

Review and Approval –Section App F –Submittals no longer approved F 14-1 Releases designer from legal responsibility of party seeking approval GC stamps submitted received and forwarded GC and fabricator responsible for work according to contract and submittal review does not relieve that responsibility Stamps indicate that people have read submittal Do not want non-stamped submittals

Review and Approval –GC must submit everything that specs require as a minimum Submit everything and get reviewed signatures –Shifts blame to reviewers –In best interests of subs, suppliers and GC

Management –Submittals allow PM to id hidden errors and exceptions subs and suppliers have taken in bids Errors mean delays in getting building done on time –Sometimes PM does not complete design Allows subs and suppliers to have choices of field routing, materials selections and construction applications Means and methods Allows contractor to construct (not A/E or owner) –Bolted connections vs welded

Management –Submittal process also gives heads up on validity of construction schedule If submittal is late probably part will be late Times of submittals need to be on all PO and sub contracts “Color to be selected later” enough to get competitive bids and issue contracts if product brand is known

Management –Need to develop schedule of submittals –F14-2 –Need expediting log to manage submittal process from subs and suppliers F14-3 –PM looks through subcontracts to determine submittal schedule Subcontracts should include submittal requirements Send expediting log to subs and suppliers for agreement

Management –F14-4 –Submittal Log Logs submittals to PM for project Only logged in after PM has checked submittal against contract to verify mat’ls are as spec’ed Each submittal has unique # Submittal cover letter – transmittal F 14-6 Submittal log needs room for all reviewers to be accounted for –Could include city, state, county, A/E –Need to know about review outome

Management –Once reviewed submittal goes back to originating party for action Either revise or fabricate –Also provides way to change contract thru submittal