PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.

Slides:



Advertisements
Similar presentations
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
PACS SVR 38/9 Nov 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber, R. Vavrek.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
PACS IQR13 Jan 2005 Optical Plans PFM 1 Optical Qualification and Plans for PFM N. Geis MPE.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
PACS IHDR 12/13 Nov 2003 PACS Instrument Overview1 Instrument Design/Development Overview and System Performance PACS Instrument Overview A.Poglitsch MPE.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 AVM/CQM ILT – test results1 PACS CQM/AVM ILT Results of functional/performance/ calibration tests.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS SVR22/23 June 2006 FM IST1 PACS FM Tests at Integrated Satellite Level H. Feuchtgruber with inputs from the PACS Operations Team: D. Cesarsky, H.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS INSTRUMENT HARDWARE DESIGN REVIEW CEA-Grenoble / DSM / DRFMC / SBT / HSO Cryocoolers/ PACS IHDR1 MPE - November, HSO SORPTION COOLERS Lionel.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
PACS SVR 22/23 June 2006 Instrument Performance Prediction1 PACS Instrument Model and Performance Prediction A. Poglitsch.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
Jörn Helbert Planetary Emissivity Laboratory Facing the heat – Obtaining near infrared real emissivity spectra at Venus surface temperatures.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
Optimisation of the PACS Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IHDR 12/13 Nov 2003 Filters1 N. Geis MPE. PACS IHDR 12/13 Nov 2003 Filters2 PACS Filter Scheme Filter scheme with 5 or 6 filters in series in each.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
CEA DSM Dapnia SAp Readout mode of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/SAp.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
CEA DSM Dapnia SAp Flux calibration of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/Sap.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Presentation transcript:

PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching

PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule2 AVM/CQM Schedule Areas of Concern  Test Cryostat: 4K level temperature and hold time problem, still not at MPE  Filters available, but no documentation: critical for PhFPU  Mirrors: gold layer loose in 3 out of 13 lots, Astrium found no real reason  2.5 weeks delay of FPU integration  PhFPU and Ge:Ga detector arrays on critical path  PhFPU STM cryovibration at CSL failed: 2 broken Kevlar wires  separate qualification program for PhFPU STM and modified Cooler STM (Titanium body)  Grating STM cryoqualified, but CQM failed: loose spring washer  several weeks delay  Distribution Boards: several weeks delay due to misunderstanding between Project PA/QA and KT: poor manufact. quality  possibly another 4 to 6 weeks delay Delivery to ESA: mid June 04, AVM WE two weeks earlier

PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule3 Duration AVM ctd Test and CQM+AVM Instrument Integration

PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule4 CQM ILT Programme ("Blue" means range of parameter settings reduced or test modified) F1.1FPU integration with test cryostat and OGSE3, alignment F1.2Electrical continuity check F1.3Functional test exercising all mechanisms, temperature sensors, sources and detector array read-outs F1.4Cool down to LHe F1.5Functional test exercising all mechanisms, temperature sensors, sources and detector array read-out Q2.1FPU Thermal behaviour Q2.2Focus definition Q2.3Relative alignment check spectrometer vs. photometer arrays after vibration respectively thermal cycling Q2.4sensitivity Q2.5spatial performance Q2.6spectral performance E1.1 Instrument EMC tests C3.1Absolute flux calibration, linearity C3.2Flat field C3.3Point spread function C3.4Distortion, grating alignment C3.5Relative Spectral Response Funct. C3.6Wavelength-calibration using TUFIR replaced by vapour absorption cell C3.7Instrumental profile (grating) measured with TUFIR replaced (however, some initial profile information from absorption line measurements are planned. C3.8Ghosts (search for spectral ghosts) TUFIR only, maybe Ge laser? (C3.9)Stray light (ghosts) with Ge laser? C3.10Detector time response, stability (C3.11) Definition of PACS pass bands with TUFIR (not possible with Ge laser) (C3.12) AOT try out

PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule5 Duration CQM+AVM Instrument Test Sequence

PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule6 PFM Schedule FPU structure manufacture started Early delivery of several subunits Areas of Concern –BOLC and Ge:Ga detector arrays on critical path oILT: PhFPU FM will be tested with BOLC QM2 oBOLC FM will only be delivered in Sep 05 Delivery to ESA: end June 05

PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule7 Duration PFM Instrument Integration and Cryovibration

PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule8 Duration PFM Instrument Test Sequence