Enbridge SCC Management Program SCC Workshop Houston - December 2, 2003 Walter Kresic Enbridge Pipelines Inc. SCC Workshop Houston - December 2, 2003 Walter.

Slides:



Advertisements
Similar presentations
Risk Ranking : An Example Process and Method SI-POWER Nuclear Cable Workshop August 6-7, 2012 Richmond, VA Shane A. McManus Senior.
Advertisements

PROJECT RISK MANAGEMENT
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.
Materials and Joining March 2005 R&D Forum David Horsley TransCanada Pipelines Limited.
Understanding & Managing Risk
High Consequence Areas & Pipeline Assessment Intervals –Is there a need for change? Terry Boss Sr. VP Environment Safety and Operations Interstate Natural.
Overview of Key Rule Features
Pertemuan 7-8 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
The Systems Development Lifecycle Your_Name_Here.
Stress Corrosion Cracking Overview & Introduction David Johnson December 2, 2003.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
1 Philip Sher Connecticut Department of Public Utility Control Gas Pipeline Safety Unit RepresentingNAPSR National Association of Pipeline Safety Representatives.
S T A M © 2000, KPA Ltd. Software Trouble Assessment Matrix Software Trouble Assessment Matrix *This presentation is extracted from SOFTWARE PROCESS QUALITY:
PRM 702 Project Risk Management Lecture #28
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Integrity Management Inspection Process Don Moore, OPS Central Region.
8/29/2006 DRAFT Implementing an Adaptive Management Framework for the Fish and Wildlife Program DRAFT.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
ILIA View: In-Line Inspection State-of-the-Art For SCC Presented by: Scott Thetford Manager- Government Relations GE-PII OPS Workshop on SCC December 2,
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Guidance Notes on the Investigation of Marine Incidents
CIS Case History NACE Eastern Area Conference
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
OPS - SCC Workshop R&D Past and Present December 2, 2003 Jerry Rau - Panhandle Energy.
Managing Stress Corrosion Cracking Williams Gas Pipeline Transco – Ron Scrivner Northwest Pipeline – Dave Katz.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
©2000 Bank for International Settlements 1 F I N A N C I A L S T A B I L I T Y I N S T I T U T E BANK FOR INTERNATIONAL SETTLEMENTS On-site Examination.
Agenda Interthink – 2003 Organizational Project Management Baseline Study –Industry Profile –Country Profile –Organization Size –Data On Schedule –Data.
SCOR® Risk Management Team Update
KINDER MORGAN ENERGY PARTNERS, L.P. Experience with Stress Corrosion Cracking (SCC) Scott Davis – Director of Pipeline Integrity and Facilities Engineering.
Measured Progress ©2011 Guide to the Smarter Balanced IT Architecture Connecticut Assessment Forum August 14, 2012.
Ensuring Success in Integrity Management Marty Matheson American Petroleum Institute July 24, 2002.
Project Management Cross lifecycle Activity
Using OMB Section 508 reporting in addressing your agency's program maturity. How to Measure Your Agency's 508 Program.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Research Needs on SCC of Pipelines Raymond R. Fessler Stress-Corrosion Cracking (SCC) Workshop DOT/RSPA Houston, TX December 2, 2003.
1. 2 Industry Integrity Efforts Have Reduced Incidents in Key Areas  Corrosion incidents are down 76% –Enhanced “smart pig” ILIs –Strengthened corrosion.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Lessons Learned from Integrity Management Inspections Byron Coy – OPS Eastern Region Derick Turner – OPS Southern Region May 17, 2005.
+ SOUTH DAKOTA PRINCIPAL EFFECTIVENESS MODEL PROCESS OVERVIEW PE WEBINAR I 10/29/2015.
Stress Corrosion Cracking (SCC) Josef Kopec, P.Eng.
Implementing an Adaptive Capital Improvement Program
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
4.5 Perform Integrated Change Control
Technology … Can It Save Us? - Toolbelt Evolution - J. A. Drake, P.E. Director, Technical Serivces Duke Energy Gas Transmission.
MICHAEL BAKER Jr., Inc. Stress Corrosion Cracking SCC Workshop December 2, 2003 Engineering & Energy.
U.S. Army Corps of Engineers Levee Safety Program US Army Corps of Engineers BUILDING STRONG ® December 2013 Update for the NAFSMA Annual Meeting.
Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Information Technology for Management Chapter 13: Project Management and SDLC Prepared by.
SCC Management 16” Camas to Eugene 26” Sumas to Washougal.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Road Investment Decision Framework
Pipeline Assessment Certification Program (PACP) Benefits of Version 7
NACE International Calgary Section
Water Loss Audit Findings (FY 13-14)
Planning Actual execution of maintenance & upgrade
Software Project Management (SPM)
IS4680 Security Auditing for Compliance
Wet Gas Gathering Pipeline Failure – Internal Corrosion
Monitoring Cathodic Protection Effectiveness and Record keeping
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
Presentation transcript:

Enbridge SCC Management Program SCC Workshop Houston - December 2, 2003 Walter Kresic Enbridge Pipelines Inc. SCC Workshop Houston - December 2, 2003 Walter Kresic Enbridge Pipelines Inc.

System Map Norman Wells Athabasca Line 1 Line 2 Line 3 Line 4 Line 5 Line 6 Line 7 Line 9 Line 10 Line 11 Line 13 Line 14 Line 17 Vector 540 Miles 591 Miles 1098 Miles 800 Miles 1098 Miles 645 Miles 759 Miles 153 Miles 524 Miles 91 Miles 47 Miles 909 Miles 461 Miles 88 Miles 348 Miles Pipeline System Line 9 Line Miles

Initial susceptibility assessment Potentially susceptible to SCC? Estimate consequences, prioritize and implement field investigations Is SCC present? Is significant SCC present? Estimate Consequences and prioritize for mitigation Select mitigation Schedule and implement mitigation Is routine mitigation required? Document and learn No Periodic monitoring No Yes Yes or No Yes Condition Monitoring Plan & Implement Mitigation Document & Learn CEPA Framework

Condition Monitoring Pipeline segment susceptibility inventory –coating type / disbondment observations –field examinations whenever pipe exposed –crack ILI data –hydrotest results when available

Plan and Implement Mitigation Mitigation of discrete pipe joint –addresses isolated SCC colonies –grinding, sleeving, recoating Mitigation of entire pipe segment –ILI-based repair project for widespread colonies –hydrotest is an option –pressure spectrum modification? (PRCI)

Document and Learn Annual update of technical process –databasing significant volume of information –on-going trend process –share with industry

SCC Detected by ILI

Documented Process Roles and responsibilities Annual plans and budgets Technical procedures –Field NDT –Pressure restriction during field work –Grinding / Sleeving / Coating Specifications –Gathering samples and field observations –Annual trending techniques

Enbridge SCC Observations No failures have occurred Near neutral pH SCC Associated with disbonded P.E. tape Pressure cycling a potential contributor Crack detection ILI is effective

Improvements Field NDT process (i.e. reporting styles) NDT depth sizing Fitness-for-purpose equations Crack tool defect sizing precision Crack initiation and growth lifecycle understanding

Summary Enbridge SCC Management Program is a component of a broader crack program applied to all pipe Techniques and technologies exist but greater precision desirable

Enbridge SCC Management Program SCC Workshop Houston - December 2, 2003 Walter Kresic Enbridge Pipelines Inc. SCC Workshop Houston - December 2, 2003 Walter Kresic Enbridge Pipelines Inc.