Pensacola Bay Ferry Service Transportation Symposium November 13, 2015 Gulf Islands National Seashore National Park Service U.S. Department of the Interior.

Slides:



Advertisements
Similar presentations
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Advertisements

Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Cruz Bay Waterfront Plan
North Florida AACEi. Project History July 18, 2011 – Phase I FFGA signed at Florida Hospital ceremonies Nov. 3, 2011 – FDOT purchased the corridor from.
Gateway National Recreation Area Jamaica Bay Transportation Studies at Floyd Bennett Field, Jacob Riis Park, Riis Landing, and the Former Pennsylvania.
1 Residential Design by the Rosellini Group, llc, copyright © 2007, all rights reserved THE WATERFRONT at FIDALGO BAY A Planned Mixed-Unit Development.
Smart Growth: Big and Small Steps in the Bay Area Steve Heminger, Executive Director Metropolitan Transportation Commission National Governors Association.
NYSERDA Alternative Fuel Vehicle Programs Patrick Bolton NYSERDA October 4, 2013.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Waterbury Branch Line Improvements opportunities to support sustainable development Tom Maziarz, Chief of Planning Connecticut Department of Transportation.
Ferry Services Development Through The Oban Hub. Structure of Presentation  Existing transport services  Transport interventions  Approach to appraisal.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
Thomas S. Cahir Administrator July 9, FEDERAL STATE CONTRACT ASSISTANCE LOCAL ASSESSMENTS FARE BOX REVENUE HUMAN SERVICE TRANSPORTATION GRANTS CCRTA.
Creating a Win-Win Relationship Presented by: John McCarthy GO Airport Express.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Redwood City Ferry Terminal Why Ferry Service Terminal Needs Locational Analysis Land availability for 5-6 acre terminal Vehicular access Environmental.
Transportation & Aging Senior and Disabled Riders Transportation Summit December 6, 2013.
Airport Shuttle Agreements Presented by: John McCarthy GO Airport Express.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
Chapter 15 Travel Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives List the two major segments of the.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Pacheco Transit Center Regional Express Bus Hub and Park and Ride Project Description and Background TRANSPAC TAC Meeting November 19, 2009.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
TAG 2012 Survey Data. Survey sent to 16, responded.
GO Airport Shuttle Don Eames The GO Group, LLC Board Member President/CEO GO The Airport Shuttle AGTA Meeting Ft. Myers, FL.
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
Arriva in Southend Kevin Hawkins Commercial Director.
Blueprint for Tomorrow Fairhope City Council February 9, 2008.
Carol Wooten, M.Ed., NBCT Hunter GT/AIG Magnet Elementary, Fifth Grade AIG Certified Kenan Fellow Presidential Awardee for Excellence in Math and Science.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
1 Whatcom County Public Works Whatcom County Public Works GOOSEBERRY POINT LEASE STATUS & UPDATE OCTOBER 13, 2009.
TRB Session January 23, 2007 Transportation Research Board Session Lessons Learned from Large Airport Development “Orlando Airport Experience”
CEMEX Open Discussion March 10, Outline Background Background Issue Issue Proposed Actions Proposed Actions.
SFO ORGANIZATIONAL SUSTAINABILITY 1 By Saidah Leatutufu.
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
Downtown Shuttle (D-Link) Interlocal Agreement Transportation and Trinity River Project Committee October 26, 2015.
Governance issues in case of the Helsinki Region Transport, HSL EMTA General Meeting, Budapest April 2010 Suvi Rihtniemi HSL Helsinki Region Transport.
Developing a Marketing Plan Unit 3.  The 5 P’s (formerly “the 4 P’s”)  Product  Place  Price  Promotion  People The Marketing Mix.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
Water Emergency Transportation Authority 1 San Francisco Bay Area Draft Short Range Transit Plan January 2016.
Shoreline Drive/Greene Lane Park/McAllister Point Aquidneck Island Reuse Planning Authority Surplus Properties at NAVSTA Newport, Rhode Island March 6,
E X P E R I E N C E Y O U R A M E R I C A Relocation of the Bodie Island U.S. Coast Guard Station Complex at Cape Hatteras National Seashore Environmental.
Welcome to…. The Boat Ramp Information Open Day Thank you for coming along. We are here to answer your questions.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Nottingham Workplace Parking Levy Sue Flack Director for Planning and Transport.
Public Scoping Open House Wabash Avenue/Porter Access Area Environmental Assessment Indiana Dunes National Lakeshore June 28, :00-8:00 p.m.
San Francisco Bay August and October 2012 July –September 2013.
GALVESTON BAY ESTUARY PROGRAM A CATALYST FOR PARTNERSHIPS AND COLLABORATION Sarah Bernhardt, Ph.D. Lower Rio Grande Valley 18 th Annual Water Quality Management.
Page 2 Salt Lake City International Airport – April 12, 2016 FY 2017 Budget Goals & Objectives - Budget Drivers  Implement the Terminal Redevelopment.
E X P E R I E N C E Y O U R A M E R I C A Transportation Study for Bodie Island National Park Service U.S. Department of the Interior Cape Hatteras National.
National Park Service U.S. Department of the Interior Gulf Islands National Seashore Perdido Key / Johnson Beach Environmental Assessment WELCOME TO GULF.
Pensacola Bay Ferry Service. National Park Service (NPS) Completed a Ferry Dock at Fort Pickens in November 2012 National Park Service (NPS) Completed.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
David Halstead, Director Division of Emergency Management 1.
Stage 2 Light Rail Transit Program “In the ground ready”
A Presentation to: River to Sea TPO Board October 26, 2016.
A growing bus market Andy Strong Public Transport Manager
A Presentation to: River to Sea TPO BPAC November 9, 2016.
Title of Presentation Bike Sharing System CE 635 Huang Liu.
River to Sea TPO - CAC/TCC
Center City Connector 101.
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Draft Transportation Element September 6, 2017
Valley & Third Streets Redevelopment
CR184 (Quintette Road) Bridge #480045
Transportation Research Board
2016 Florida Inland Navigation District Proposed Applications
Highways Maintenance Funding for Local Roads
Stewart Beach: Planning a New Pavilion for the Next Generation
Presentation transcript:

Pensacola Bay Ferry Service Transportation Symposium November 13, 2015 Gulf Islands National Seashore National Park Service U.S. Department of the Interior

Birth of a Ferry Service  Ferry service to Fort Pickens was first proposed in 1978, envisioned to provide alternative access to Fort Pickens, offer a water excursion experience, and reduce traffic congestion to island beaches.  Alternative transportation studies concluded a ferry service would be economically viable and had strong local support

Hurricanes Ivan in 2004 and Dennis in 2005 destroyed much of the Ft. Pickens Road, emphasizing the need for this service.

The Fort Pickens Road was reopened in 2009, but remains at risk. Routine weather events – often only a south wind and high tide – can cover the road with water and sand making it impassible.

Dark Clouds & Silver Linings Ferry service had been hindered by lack of a suitable pier at Fort Pickens. Studies also revealed that to keep ticket prices affordable, it was important to minimize initial capital costs, i.e. provide boats. The impacts of the hurricane season led to Gulf Islands receiving $2.8 million transportation grant to build a new ferry pier, and the Deepwater Horizon oil spill in 2010 resulted in $4 million in NRDA funding for ferry boats.

 Mid-March through October  Daily during peak season; weekends in shoulder seasons  35 – 45 minute trips each leg  2 boats; clockwise and counterclockwise routes  Minimum 6 departures and 6 arrivals for each destination  Scheduling flexibility to best serve customers  Boats berthed overnight in Pensacola in Pensacola Ferry service route and schedule

MS - West Ship Island Ferry FL - Pensacola Bay Ferry The ferry to West Ship Island in Gulf Islands National Seashore has operated under an NPS concessions contract since The Pensacola Bay ferry will operate under a similar NPS concessions contract.

Ferry Service Contract Operator provides: Ferry operation Ferry operation Optional ferry excursions with 3 rd boat - sunset cruises, dolphin watching, dinner cruises, fireworks cruises Optional ferry excursions with 3 rd boat - sunset cruises, dolphin watching, dinner cruises, fireworks cruises Food service (on boat and at Fort Pickens) Food service (on boat and at Fort Pickens) Retail and rental at Ft. Pickens (food & beverage, souvenirs, campground store, bikes, beach chairs, umbrellas, kayaks, paddle boards, water toys) Retail and rental at Ft. Pickens (food & beverage, souvenirs, campground store, bikes, beach chairs, umbrellas, kayaks, paddle boards, water toys) Operation of Fort Pickens shuttle service Operation of Fort Pickens shuttle service

Ferry fleet  Service based on a 2 boat fleet (provided by NPS)  Back-up 3 rd boat (provided by operator)  149 passenger (class T) ferries  Design/build contract: award Sept. 2015, delivery Jan. 2017

 Connect ferry to beaches, historic sites, and campground  Service integrated with ferry schedule Fort Pickens shuttle service

 Solar powered electric trams - provided by NPS  Battery Langdon retrofitted for tram storage & charging station (5 kw solar inverter system) Fort Pickens shuttle

Fort Pickens arrival/departure area  Existing new ferry pier and shaded seating pavilion  Adaptive reuse of historic for buildings for ticket sales, concessions & exhibits  New restrooms, picnic shelter, bike storage/rental

Pensacola landing site Floating Breakwater Floating Dock Gangway Ferry Ticketing - Concession Sales - Rest Rooms Building Sheltered Passenger Waiting Area Drop-off

Pensacola concepts and costs Ticketing and Restroom Facility Concept Drawing Development Cost at Pensacola Departure Site Design & permitting Waterside - docks & breakwater Landside - site work Landside – Ticketing/Building Total $190,000 $896,000 $222,000 $589,000 $1,897,000

Pensacola concepts & funding City awarded $1,326,000 FLAP grant July 2014 for docks, breakwater, site work City awarded $589,000 FLAP grant July 2015 for landside facilities Ticketing and Restroom Facility Concept Drawing

Pensacola Beach departure site Escambia County awarded $784,000 FLAP grant for pier extension, ADA, ticket kiosk 2016 FLAP grant application Widen existing pier, $699,000 Shaded seating area, $1,160,000

Financial Modeling Projected financial viability for concession contract  Revenue sources: ticket fares, sales and rentals  60,000 passengers (range 36,000 – 95,000)  Ticketing range: $18/adults, $12/child  Local resident discount rate: $12/adult, $8/child  Potential for commuter pass: $7.50 (Mon. – Fri.)  Hop-on, hop-off privileges

Partnering for Success Partnership Agreements Development of Memorandums of Agreement between NPS, City of Pensacola and Escambia County to address departure site operational responsibilities Development of Memorandums of Agreement between NPS, City of Pensacola and Escambia County to address departure site operational responsibilities Marketing Collaboration Ferry operator, Visit Pensacola, hoteliers others: Ferry operator, Visit Pensacola, hoteliers others: Assistance with marketing, way finding, orientation Assistance with marketing, way finding, orientation Promote strong NPS branding and quality Promote strong NPS branding and quality Opportunities for ticket packages, off-site & advance sales Opportunities for ticket packages, off-site & advance sales

ScheduleSchedule BP/NRDA Settlement FundingDec Ferry Design/Build Contract AwardSept Memorandums of Agreement- City and SRIANov Ferry/Landside Concession Contract Dec Departure Sites Construction CompletedDec Ferry Vessel and Shuttle Vehicle DeliveryJan Transportation StartupMarch 2017

National Park Service National Park Service U.S. Dept. of the Interior U.S. Dept. of the Interior Dan Brown – Superintendent Gulf Islands National Seashore Thank You Questions?

Island Access – A Brief History  Santa Rosa Island National Monument established in NPS planners stated in 1938 that a road would be built.  1940 NPS Director Newton Drury rejects road: “It would be an extremely expensive road to build and maintain and it would seriously affect the natural values of the dunes and dunes vegetation.”

You Do the Math  WWII => No facilities + no road = County officials requested return of island to county ownership. Santa Rosa Island National Monument abolished by Congress in  Army accessed Fort Pickens exclusively by boat for 120 years. Fort Pickens decommissioned in 1947 and became a state park in  State built first road in 1949 – one lane oyster shell. Local officials lobbied for improvements. First 2 lane asphalt road built in  Gulf Islands National Seashore established in 1971; inherits Fort Pickens Road.

I see a pattern here… I see a pattern here… Since 1954 Fort Pickens Road damaged or destroyed repeatedly by storms: 1965 Hurricane Betsy, 1979 Hurricane Frederic, 1995 Hurricanes Erin & Opal, 2004 Hurricane Ivan, 2005 Hurricane Dennis Hurricanes Ivan in 2004 and Dennis in 2005 destroyed much of the Ft. Pickens Road, emphasizing the need for this service.

Best Laid Plans… and Other Options “The NPS intends to continue access via Fort Pickens Road to Fort Pickens, but there are situations that may arise in the future where conditions become so altered that it is no longer feasible to build or maintain the road. Other options to provide access would be considered…” General Management Plan, Sept. 2014

Buying some Time Q. At what point is it no longer a viable option to maintain this stretch of road?

Ft. Pickens Road - Count the Cost  $25 million to rebuild road twice following Hurricanes Ivan (2004) and Dennis (2005) in successive years  Island littered with asphalt and road base material. Spending $11 million in BP NRDA funds to remove road debris  Hindsight: NPS Director Drury’s assessment in 1940 was correct