All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
PIP Update June 26 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Proton Improvement Plan (FY13 PMG Q4). William Pellico, Fermilab PMG, Nov PIP FY13 Q4 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Proton Improvement Plan (PIP) William Pellico PIP and MI 700 kW review 21 – 22 January 2015.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013.
Proton Improvement Plan Bob Zwaska July 7, 2014 All-Experimenters Meeting.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP FY15 PMG W. Pellico PIP PMG March 5 th PIP FY15 Year to Date Outline –FY15 activities PIP quarterly milestones Linac Booster Project Controls.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
L-band test stations in End Station B Richard Swent.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
D.E. Johnson, T.R. Johnson, K.L. Duel, M. Gardner, V. Scarpine, R.J. Tesarek Motivation Notching process in the Booster creates about 30-35% of the total.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan William Pellico 44th Fermilab Users' Meeting June 1-2, 2011.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
650 MHz Solid State RF Power development at RRCAT
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Chris Adolphsen Sergei Nagaitsev
Injector Performance Requirements Conventional Facilities Update
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Presentation transcript:

All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013

RFQ Injector Line (RIL)

RIL Highlights – Thin corrector  Large exit angle  Correctors are running with high current, predominant vertically, at the downstream end of RFQ in order to maximize beam transmission  Thanks to BNL for the design and FNAL/TD for building the correctors  Corrector installed early June  Modest gain in beam current  Increased extractor voltage by 1.5kV  Yielded 11% more beam at entrance of Linac F.G. Garcia AEM - PIP Report 07/01/2013 Thin corrector Contribution: C.Y. Tan

RIL Highlights – Source Swap F.G. Garcia AEM - PIP Report 07/01/2013  FNAL/RIL design posses two sources located side-by-side on a slide platform to allow for easy and quick swap  First swap: June 17  Duration: ~ 7 hrs  Second swap: June 26  Duration: ~1hr Contribution: D. Bollinger

PIP – Linac Activities

Linac 200 MHz RF Power System  Modulator Upgrade  35kV, Marx-topology modulator to drive triode (or MBK)  SLAC – Two cell test stand  Simulate the ripple due for 2 cells both in phase (11%) and out of phase (0.9%)  Compare 2 cell out-of-phase simulated to measured ripple (1.1%)  Determine via simulation the ripple for 5 vernier cells (0.23%) F.G. Garcia AEM - PIP Report 07/01/2013

 Modulator Upgrade (cont.)  35kV, Marx-topology modulator to drive triode (or MBK)  AD/EE – Working on building 9 cell Marx Modulator  Able to create any arbitrary wave shape, from trapezoid to square  In the future: determine rising and falling edge ripple  Built prototype discrete control system  Testing second prototype Marx cell  under normal load conditions (350 Amps)  under short circuit (2000 Amps)  Continue fabrication of 9 cell Marx Modulator Linac 200 MHz RF Power System F.G. Garcia AEM - PIP Report 07/01/2013

Linac 200 MHz RF Power System  MBK201FERMI  7MW pulsed klystron to operate at 200 MHz for use as a power source for the DTL Linac  Procurement  Received approval from directorate to proceed with the MBK201 prototype  New cost/schedule was developed between Fermi and seller  Current awaiting PO to be accepted  Estimate to be complete this week  Activities  Initiate gallery floor plan layout in collaboration with AD/MSD Drafter Dept. F.G. Garcia AEM - PIP Report 07/01/2013 Courtesy: D. Hurd

Linac Utilities  Power Distribution  L1 transformer  Continue with prep work for the installation of L1 transformer.  Electrical conduit relocation complete  Lead abatement & relocation steel beam complete Hatch location F.G. Garcia AEM - PIP Report 07/01/2013 Tentative delivery date: Week July 15 th.

Linac Laser Notcher  Reduce losses in Booster generated by the creation of the notch  3D printer model of the vacuum interface and the optical cavity  Good progress with beam shaping optics F.G. Garcia AEM - PIP Report 07/01/2013 Beam size as shown ~ ¾ mm x 5 mm Design beam size 1 mm x 6 mm VerticalHorizontal

PIP – Booster Activities

Booster Utilities Old Y-BE2 40+years old – beyond expected lifetime Oil-cooled transformer Questionable operation conditions for quite a while o May/2012 investigation revealed noisy current output, over temperature operation conditions… Replaced with “old spare” ~ 1 year ago F.G. Garcia AEM - PIP Report 07/01/2013 New Y-BE2 Installed May 17-18, 2013 Air-cooled transformer Remotely monitor & control Breakers are modular (smaller spare inventory) Improved monitoring (access to currents, voltages, harmonics )

Booster  Booster shielding assessment  Studies concerning beam loss profile and radiation measurement through penetrations were done  Discussions and data analysis underway  Booster Notcher  Progress with time in and commissioning F.G. Garcia AEM - PIP Report 07/01/ E12 12T - $ E12 12T - $17

Booster RF system  Cavities Refurbishment  7 of 19 cavities have been refurbished BRF 1,3,5,6,7,8,15  BRF11 has issues with heating on the tuners  Need to be re-addressed for 15 Hz operations F.G. Garcia AEM - PIP Report 07/01/2013 Booster Cavity Work Refurbished (15Hz) SS Prototype SS Upgraded Cavity Removed Stats: Last refurbishment : 9.4 weeks last 3 cav. : 10.5 weeks Courtesy: K. Gollwitzer