Introductory Remarks and Highlights of FY02 Plan Mohamed Abdou APEX Meeting, Scottsdale, AZ November 7-9, 2001 APEX Outline Key Points from FY01 FY02 PLAN.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

The Cost of Authoring with a Knowledge Layer Judy Kay and Lichao Li School of Information Technologies The University of Sydney, Australia.
Doug Elliott Professor, Critical Care Nursing The final step: Presentation and publication Research Workshop: Conducting research in a clinical setting.
Extension of IEA Implementing Agreement on Large Tokamak Facilities Presented to Committee on Energy Research Technologies October 18-19, 2005 Paris, France.
Session Outcomes Explain how assessment contributes to the learning process Use a model of feedback to enhance student learning Identify a range of feedback.
Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
Gu & Maher University of Sydney, October 2004 DECO2005 Monitoring Team Process.
Chamber Technology Goals Used in APEX to Calibrate New Ideas and Measure Progress 1. High Power Density Capability Average/Peak Neutron Wall Load ~ 7 /
FNST / PFC / Materials / FNSF Meeting (s) August 2-6, 2010 at UCLA Welcome All Participants to UCLA If there is anything we can do to make the meeting.
US TBM Activities and Collaboration Discussion Mohamed Abdou FNST Meeting held at UCLA, August 18-20, 2009.
Summary and Closing Remarks Farrokh Najmabadi University of California San Diego Presentation to: ARIES Program Peer Review August 18, 2000 UC San Diego.
Suggested US Plans and Strategy for ITER Test Blanket Mohamed Abdou Presented at APEX/TBM Meeting, UCLA, November 3-5, 2003.
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
Corporate Responsibility Index 14 April Athens A tool for improving management of and performance in corporate responsibility.
TOGETHER EVERYONE ACHIEVES MORE
Fostering Continuous Improvement of Curriculum - Learning Outcomes Peter Wolf Director, Centre for Open Learning Educational Support University of Guelph.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Introducing small-group workshops as formative assessment in large first year psychology modules Suzanne Guerin School of Psychology, University College.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
Presentation by Wendy Launder General Manager CRC and Small Business Programs.
Models of Online Learning – Identifying Components Week 3 Introduction to Web-Based Mentoring and Distance Education.
Z26 Project Management Introduction lecture 1 13 th January 2005
NRTSI/NRC Project Framework for the Assessment of the State, Performance and Management of Canada’s CPI.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
Research Project Grant (RPG) Retreat K-Series March 2012 Bioengineering Classroom.
Module 2 Stakeholder analysis. What’s in Module 2  Why do stakeholder analysis ?  Identifying the stakeholders  Assessing stakeholders importance and.
CEBP Learning Institute Fall 2009 Evaluation Report A collaborative Partnership between Indiana Department of Corrections & Indiana University November.
Systems Studies Program Peer Review Meeting Albert L. Opdenaker III DOE Program Manager Holiday Inn Express Germantown, Maryland August 29, 2013.
Comprehensive Educator Effectiveness: New Guidance and Models Presentation for the Special Education Advisory Committee Virginia Department of Education.
© Copyright 2011 John Wiley & Sons, Inc.
EE & CSE Program Educational Objectives Review EECS Industrial Advisory Board Meeting May 1 st, 2009 by G. Serpen, PhD Sources ABET website: abet.org Gloria.
INTRODUCTION The observance of Earth Day began in 1970 to increase awareness of problems with the environment. April 22 nd has been set aside for Americans.
Residential Industry Stakeholders Workshop Hosted by ASHRAE February 19 & 20, 2014 Crystal City Hilton Arlington, Virginia.
Conference Call, June 23, 2005 Remarks on US Costing Activities for the US ITER-TBM Mohamed Abdou.
Take Charge of Change MASBO Strategic Roadmap Update November 15th, 2013.
Joint Canada-Mexico-USA (North American*) Carbon Program Planning Meeting January 25–26, 2007 *By North America we mean the North American land, adjacent.
1/9 Session III-B Special Liquid Lithium Technology Session Summary C. H. Skinner, session chair Princeton Plasma Physics Laboratory 2 nd International.
SACS Reaffirmation of Accreditation 7/28/09 Academic Affairs Retreat Cathy Sanders Director of Assessment.
Experiences from Technology Needs Assessment and Related Activities by the CTI Elmer Holt, Vice Chair, Climate Technology Initiative Tobago Seminar – 14.
Summary and Closing Remarks Farrokh Najmabadi UC San Diego Presentation to ARIES Program Peer Review August 29, 2013, Washington, DC.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
The Periodic Review Report and Middle States Accreditation PRR Workshop April 9, 2008.
Future Direction of the U.S. Fusion Materials Program Dr. Pete Pappano US Department of Energy Fusion Energy Sciences Fusion Power Associates Annual Meeting.
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
How is a grant reviewed? Prepared by Professor Bob Bortolussi, Dalhousie University
Advanced Design Activities in US Farrokh Najmabadi University of California, San Diego Japan/US Workshop on Fusion Power Plants & Related Technologies.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
CM220 College Composition II Friday, January 29, Unit 1: Introduction to Effective Academic and Professional Writing Unit 1 Lori Martindale, Instructor.
Research in the Office of Cellular, Tissue and Gene Therapies: Vision and Overview Jesse Goodman, M.D., M.P.H. Director, Center for Biologics Evaluation.
Rural Ohio Technology Infrastructure Group All Transportation Counts Conference October 8, 2003.
Helping Teachers Help All Students: The Imperative for High-Quality Professional Development Report of the Maryland Teacher Professional Development Advisory.
Carpe Diem Phase II Making the Case. Jot down 3 questions that you have related to Phase II (the one’s that you carried into the room today)
Averett University November 5, 2012 Presenter: Barbara Jacoby, Ph.D.
Bangladesh Joint Country Assistance Evaluation: Assessing Total ODA at the Country Level Presentation to OECD DAC November 2006 Bruce Murray Director General.
Stage 1 Integrated learning Coffee Shop. LEARNING REQUIREMENTS The learning requirements summarise the knowledge, skills, and understanding that students.
Material System Thermomechanics Interactions (cont’d) International Collaboration: Role / Impact / Recognition - Serves a unique role in IEA program on.
Preparing for the Title III Part F STEM Competition Alliance of Hispanic Serving Institutions Educators Grantsmanship Institute March 20, 2016.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Technical Operations Report Board of Governors Meeting May 7-9, 2015
GEOSS Data Sharing Principles
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Advanced Design Activities in US
VLT Meeting, Washington DC, August 25, 2005
Remarks on US Costing Activities for the US ITER-TBM
Mohamed A. Abdou Summary, Approach and Strategy (M. Abdou)
Ms. Kim Adkins, Chair July 26, 2018
Presented at the ITER TBM Meeting, February 23-25, 2004, at UCLA
Technology Bob Dohrer, Technology Working Group Chair
Presentation transcript:

Introductory Remarks and Highlights of FY02 Plan Mohamed Abdou APEX Meeting, Scottsdale, AZ November 7-9, 2001 APEX Outline Key Points from FY01 FY02 PLAN - Process - Thoughts behind strategy - Common Interest among Tasks Documentation (Papers & Reports)

Key Points from Effort Last Year (FY01) The MFE Chamber Peer Review was conducted in April We passed with very good grades - Thanks to everyone On Liquid Walls - Constructed two new facilities: M-TOR (toroidal magnetic facility) for LM MHD FLIHY for Free Surface Transport Phenomena - Both facilities are now operational and initial tests were performed. - Related Development: JUPITER-II was initiated. Facility to explore innovative techniques for enhancing heat transfer in low-conductivity fluids is completed. - Discovery of low-melting point, low-conductivity fluid (flinabe). This makes Low-Conductivity fluids strong competitors to liquid metals (this is reflected in our work plan for FY02).

Key Points from Effort Last Year (FY01) - Progress on Design Exploration - Better understanding of liquid wall flow issues and clearer assessment of the needs for model development and experiments. - SBIR Phase II Grant was awarded to HyPerComp to develop, in collaboration with UCLA, a 3-D MHD Free Surface Flow Code. - The First International Workshop on Free Surface Flow was held in Japan in May Strong participation from APEX. - A workshop was held October 11, 2001 in collaboration with HyPerComp to consult with renowned experts in fluid dynamics code development. - We worked hard to interact with world-renowned experts on fluid dynamics, free surface and MHD. There is considerable interest in the problems we are addressing for liquid walls. On Liquid Walls (cont’d)

Key Points from Effort Last Year (FY01) (continued) Material Retreat at UC Santa Barbara, August The Material and Chamber Communities will work together more closely. - In particular, the material community would identify a structural material that has the best potential to be available for construction of a fusion device in about 30 years. - The Material Community identified NCF (nano-composited ferritic steel) This material will be explored as a “reference structural material” in APEX for both solid walls (Task IV) and liquid walls (Task III). The material community will provide material properties. (Bob Odette as the key person) - The Material Community (Zinkle/Odette) will identify a “Material Engineer” who will serve as a liaison between Materials and Chamber and provide APEX with material properties and analysis.

Key Points from Effort Last Year (FY01) (continued) Solid Walls - Completed EVOLVE (report to document work is being finalized) - Evaluated SiC/LiPb concept (report expected) - “General Outcome”: *EVOLVE is an attractive option, but Tungsten is a CHALLENGE that the Material Community is not enthusiastic about addressing. - No further work in APEX on EVOLVE is warranted until, and unless, the Material Community initiates significant effort on tungsten (or any high-temperature refractory alloy). Documentation of SiC/LiPb will be completed with no new work planned. - A small experiment was started at UW to test void formation in Li in the presence of magnetic fields. This experiment for EVOLVE will be completed in early FY02 and no further effort is planned in this area. *Negative findings on SiC/LiPb; Difficulty in assessing SiC (state-of-the- art not advanced).

FY02 PLAN PROCESS Broad Guidelines and Technical Priorities were discussed with the Task Leaders. The Task Leaders were asked to develop detailed technical plans for their Tasks These plans were reviewed and discussed in an APEX Steering Committee conference call on October 10, Feedback was provided and the Task Leaders were asked to submit REVISED Technical Plans with recommendations for performers and level of effort. [We asked for names of scientists and their level of effort to be specified. It is not acceptable to specify only institutions without specific names of scientists/performers.] The Revised Plans and Resource Allocations were discussed among the individual groups for each task and then opened for comments from the Steering Committee. M. Abdou and M. Sawan extensively reviewed the plans for consistency with technical guidelines, resource allocation, missing information, etc. Important comments were conveyed and discussed with the Task Leaders. Most issues were resolved, with only a small number of issues remaining to be resolved this week: e.g. - specific technical work scope for one scientist - providing specific names for scientists and their level of effort in one organization - would LIMITS (at SNL) effort be charged to APEX or ALPS? We have a GOOD PLAN. We trust every APEX team member will give his/her best effort to make major contributions to the technical effort and make FY02 a big success.

Thoughts behind the FY02 Plan Strategy Liquid Walls The following points had a large impact on the development of the technical plan for FY02 1) 3-D MHD Modeling - We made great progress on developing 2-D MHD codes. We utilized effectively the codes developed. - However, further progress on design and analysis of liquid walls requires a 3-D MHD Free-Surface Code. This is equally true for the design of experiments in present plasma devices (Task I) and for design of liquid walls in future fusion facilities (Task III) 2) Discovery of Flinabe - A low melting point ( C) flinabe makes low-conductivity fluids a potentially competitive attractive option again. (We put the flibe work on hold a year ago.) - Since MHD effects are not controlling, design of low-conductivity liquid walls can proceed without waiting for MHD effects. - Many critical issues can be addressed for low-conductivity fluids (that are also relevant to liquid metals). These include: fluid flow in complex geometry, restraining forces, flow around penetrations, heat transfer at the free surface, pumping, nozzles, divertor integration options, etc.

Underlying Strategy for Liquid Wall Effort in FY02 Effective Parallel Effort A - Develop 3-D MHD codes in Task II (in addition to continuing model development for low-conductivity free-surface flows) and conduct MHD experiments (and other low-κ experiments). B - Explore Designs and Engineering Issues for Flinabe in Task III. Tremendous progress can be made using tools developed last year (modified Flow 3-D, a number of free-surface fluid flow and heat transfer codes and data). C - Devote most of Task I to MHD experiments (supporting Task II) while continuing to explore options and issues for testing in plasma experiments. Thoughts behind the FY02 Plan Strategy (cont’d) Note: UCLA initiated effort on “basic proof-of-principle” experiment for fluid flow (curved wall/water; look at restraining forces, flow around penetrations, etc.) Work by Mo Dagher with guidance from Task III.

Solid Walls Key Points that influenced the strategy for FY02 1) The agreement with the Material Community to use NFC as reference structural material with maximum operating temperature of 800C. - This makes it possible to open the design window for flibe in solid wall designs. 2) Flinabe with low melting point. Thoughts behind the FY02 Plan Strategy (cont’d) - This makes NFC/flinabe a potentially attractive solid wall design option Underlying Strategy for Solid Wall Effort in FY02 Using NFC as a reference structural material, explore the most innovative solid wall designs. For FY02, limit breeder/coolant to only flibe and flinabe and compare both.

Common Interests between Tasks III and IV and also with JUPITER-II Advanced Ferritic (NFC) structural material is common to Task III (liquid walls) and Task IV (solid walls). Also, Flinabe is a common breeder/coolant. - We should try to learn the benefits and flaws of adding liquid walls (1-2 cm Cliff-type) to a solid wall design. Tasks III and IV need to work together to give us insights into what such direct comparison reveals. With Flibe and Flinabe in a solid wall design with advanced ferritic in Task IV there is a Direct Common Interest between APEX and JUPITER- II. Also, the work of Task-III is of interest to the Japanese (they want to explore Flinabe and they want to learn about liquid walls). - This common interest will be mutually beneficial to APEX and JUPITER-II.

Other Comments on Liquid Wall Tasks (I, II, III) A certain amount of knowledge and basic tools are required, whether we want to do experiments in plasma devices or explore a reactor design. - This is particularly evident in the case of 3-D MHD Free Surface It is INCORRECT to say that the lack of 3-D MHD will hinder progress on reactor design (Task III) but that progress can be made on design of a test module in a plasma device (Task I). Both need fundamental knowledge and basic tools that we have yet to develop. - Task II modeling and experiments effort is CRITICAL for both Tasks I and III - Task III will not suffer from the lack of 3-D MHD in FY02 because Task III will focus on Flinabe. - Making progress on Task I in FY02 requires more thoughts and careful planning. * Shift to supporting MHD modeling and experiments effort of Task II? * Consider a low-conductivity fluid for test module in plasma experiment?

This Meeting Report and discuss Technical Progress by Team Members. Task Leaders will present detailed technical plans. Comments and Discussion are Encouraged Town Meeting Wednesday evening jointly with ALPS. General Discussion Session planned for Friday Morning. Steering Committee Meeting Thursday Evening (and wrap-up meeting after the General Discussion Session ).

Journal Papers and Reports * As usual, we pay considerable attention in APEX to documenting our work. We encourage submission of papers to scholarly journals, and writing reports. * M. Sawan will summarize the status of Reports and Papers.