CERN EST -DEM CERN Erik van der Bij EP ELECTRONICS ADVISORY BOARD 4th Meeting 7 November 2002 Erik van der Bij CERN EST-DEM Group leader.

Slides:



Advertisements
Similar presentations
Meeting & Exceeding Customer Expectations 2130 South Industrial Park Avenue Tempe, AZ (480) Fax (480)
Advertisements

BTEC First Engineering
Handling Marking Depaneling Screen Printing Final Assembly ASYS Line Call Presentation.
BTEC First Engineering
TE-MPE-EM Costing Betty Magnin 29/11/ Costing History Operational budgets Invoicing Cost balancing over fiscal year 2 29/11/2012.
Welcome to Finger Lakes Conveyors Located on Route 414, in Waterloo, New York Introduction Shop Tour Shop Tour Welding Assembly Machining Engineering.
Computer Hardware Storyboard
Signotron Tower. Plot J1-6, Block - EP, Sector - V Salt Lake Electronics Complex Kolkata Phone: /7274 Fax:
CERN Betty Magnin / Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Betty Magnin / Erik van der Bij CERN Electronics Design Office.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
The Millennia Group  A vertically integrated electronics manufacturing organization providing Tier 1 capabilities to medium-sized OEMs:  Millennia Design.
EUG 20/06/2012 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
Frequently Asked Questions. No, in fact DOCTUS considers itself a strategic extension of your organization. Hence, we deliver the work the way you do.
Medical Practice Innovations, Inc. 8/8/20151 ASP Models in Practice Management Systems and Billing Services Presented by: Anthony J. Sarro, Jr. BSCE Medical.
Chapter 13 Organizing Information System Resources MIS Department Centralization and Decentralization Outsourcing Computer Facilities and Services.
4/20/2017 © 2015 Vermason Ltd..
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
Peter van Mossevelde [April 14th 2005]
1/20 Passive components and circuits - CCP Lecture 13.
RO400FC Forced convection hot air reflow oven. In a flexible production, what do you need for soldering of  Complex PCB’s  Soldering of fine pitch on.
From Research Prototype to Production
Printed Circuit Board (PCB) manufacture Learning outcomes: To work effectively, independently and in small groups. To understand the importance of personal.
Introduction of Quality Procedures in the Electronics Design Office
CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized.
“Toward a New Conception of the Environment – Competitiveness Relationship” Michael Porter & Class Van der Linde Journal of Economic Perspectives, Fall.
Piotr Bielówka ul. Muchoborska 18 PL Wrocław Phone: Phone/Fax E -mail: 22 nd.
Status of AMS02 Integration Area in Building 867 January 10, 2007.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
CERN CERN EP-DI-DDL-VV 1 D E M A C - meeting 30 August 2001 This presentation will probably involve audience discussion, which will create action items.
Ask a Recruiter: An Insider’s Guide to Getting Hired Co-sponsored by the Hiatt Career Center and the Brandeis International Business School.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
“Toward a New Conception of the Environment – Competitiveness Relationship” Michael Porter & Class Van der Linde Journal of Economic Perspectives, Fall.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
Digital Doorbell Team 2 Tyler Blaker, Mike Woessner, Jose Pina, Bill Kessler, Jesse Yanik, Justin Bayham, Brandon Roberts, Mike Goggins, Ralph Voltz.
How to make a PCB.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
TE-MPE-EM: Subcontracting Raphaël Berberat
TE-MPE-EM Assembly workshop Betty Magnin 29/11/
TE-MPE-EM Design Office William Billereau 29/11/
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Welcome To Bhavya Machine Tools
 OPENED 1990  Original and Long Term Customers  25 year record of financial stability  ASSET BASED  EXCELLENT D&B.
 A PCB is printed circuit board, also known as a printed wiring board. It is used in electronics to build electronic devices. A PCB serves 2 purposes.
PSL Metrology Pte Ltd – CSE Training Overview PSL Metrology Pte Ltd, confidential.
Where there is signal, there is PTN ! PTN Electronics Limited PTN is a global company specializing in state-of- the-art audiovisual equipments and components.
A leading South African Electronic Contract Manufacturer Trends in electronic manufacturing and SMME Opportunities.
Customer Base Expectations  Collaborative Supply Chain Models  Proactive Solutions  Aggressive Pricing  Ease of Doing Biz  Favorable/Fair Terms and.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
IE Operations Analysis 1: ● System Analysis – Environment Analysis – Personnel Analysis – Facilities & Equipment Analysis – Process Analysis ● Traditional.
MPE-EM Workshop The assembly workshop S. KaufmannJune 16, 2016.
Etienne CARLIER TE-MPE-EM Support Feedback from TE/ABT.
Subcontracting of electronics modules
Subcontracting and company selection
GEM-VIEW: Direct Data Radiodetector based on GEM technology
Basic Electronic Assembly and Test
ELECTRONIC CIRCUIT DESIGN & MANUFACTURE
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Introduction to New Product Development (Documentation)
Production & Maintenance
Working Drawings Chapter 12.
Computer-Aided Design (CAD)
This presentation uses a free template provided by FPPT.com
Presentation transcript:

CERN EST -DEM CERN Erik van der Bij EP ELECTRONICS ADVISORY BOARD 4th Meeting 7 November 2002 Erik van der Bij CERN EST-DEM Group leader

CERN EST -DEM CERN Erik van der Bij DEM Turns schematics into boards PCB design Manufacture of PCBs and special circuits Assembly

CERN EST -DEM CERN Erik van der Bij Changes in DEM-BE Bureau d’études Changes in personnel –Regrouping DEM-BE with PS-PO design office »M. d’Auria: section leader »2 designers and 1 admin on S081 –Moved CERN staff for Cadence component creation »M. Couturier (from IT) »F. Marchi (from EP) Handles from design to assembly –Organises all stages inside and outside CERN –Strict system of planning

CERN EST -DEM CERN Erik van der Bij Working method changes Clients have single point of entry and exit –BE will take in a job and follows it from PCB design to assembly –Less handling for clients: less phone calls, mails and interruptions Clients will receive planning and estimated pricing –Clients know precisely when they can expect their job back –Clients know how much it will cost –Gets sheet with total cost before receiving TID: eases discussions Industrial Support will be 'protected' –Priorities defined by CERN staff, not by Industrial Support –CERN engineers will have no direct access to Industrial Support –Chef d'équipe will 'protect' his people so they can work with less interruptions

CERN EST -DEM CERN Erik van der Bij Combined Bill You’ll receive this before the actual TID

CERN EST -DEM CERN Erik van der Bij Changes in DEM-PMT Photolithography and Microconnectics Technology Personnel –New CERN staff for work in cleanroom »G. Musso (from EST) Equipment –Received new microscope with camera and PC link –Will move photoresist lamination machine to clean area –Cleanroom will become cleaner (< Class 100) Projects –Can now deliver halogen-free PCBs –Microvia study and technology transfer (with ETT)

CERN EST -DEM CERN Erik van der Bij Changes in DEM-WS Workshop Personnel –N. Wauquier was industrial support, is now CERN staff –Person from industrial support moved to SMD assembly Equipment –New vapor-phase oven installed –Ordered microscope with camera and PC link –Ordered new anti-static floor Projects –Study of lead-free solder (with ETT)

CERN EST -DEM CERN Erik van der Bij Vapor-phase oven

CERN EST -DEM CERN Erik van der Bij What can you do? Inform us about the tendency of workload –Will there be less prototyping next year? Be realistic with planning Pass all your electronics jobs through DEM –unifies manufacturing files (formats and central storage) –better quality and cheaper (P+M, less s/w licenses required) –uses global SPL contracts for outsourcing (cheaper) –assures stability of DEM –is much easier for your already overloaded engineers!

CERN EST -DEM CERN Erik van der Bij EST-DEM on the web DEM on the web!