Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,

Slides:



Advertisements
Similar presentations
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Advertisements

Sharing of ISTS Charges & Losses Regulation
Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
1 Framing Regulatory and Government Policy India Energy Mart 2004 New Delhi S L Rao.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
1 Meeting the Regional Electricity Market Opportunities South East Europe Energy Week “Athens Forum” Meeting Rome, March 2003.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Bulk Power Transmission System
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
CERC Paper on Open Access Presentation by the MPERC Bhopal At New Delhi 25 September 2003.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
1 APPROPRIATE PRICING OF TRANSMISSION A PRESENTATION BY SRLDC, BANGALORE.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Competition in the Indian electricity sector The experience so far Shahid Hasan Fellow, Energy Reforms Group The Energy and Resources Institute New Delhi,
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Power Trading Corporation Of India Ltd. Mahendra Kumar Director, Power Trading Corporation of India Ltd. Power Trade Perspective.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Point of connection Mechanism
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Interstate Transmission system
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
“ Open access / Power Exchange Regulations/experiences of SR ”
IN INTER-STATE TRANSMISSION
Pseudo-tie business procedure
Transmission Pricing & Regional Electric Markets
Long-term Capacity Market
Pseudo-tie business procedure
Presentation transcript:

Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager, NRLDC POWERGRID September 23, 2004 New Delhi

Short term Open Access in Transmission NRLDC has processed more than 250 applications in just 4.5 months. Approval for 185 applications could be given. Bidding had to be conducted on five occasions. Besides these there were several cases when congestion arose due to multiple applications by only a single applicant.

COMPLICATIONS IN PROCESSING APPLICATIONS DUE TO 1.Varying spare capacities in transmission system due to  Dynamic system parameters  Unpredictable unit outages/emergency shutdowns  Changing transmission losses  Varying capacity reservations during different hours of the day  Non-utilization of reserved capacity  Varying ISGS capacity allocations during different hours of the day

COMPLICATIONS IN PROCESSING APPLICATIONS DUE TO 2.Non-firm shutdown programs leading to  Part-approvals  Refusals  Cancellations 3.Requests for re-routing transactions and adjustment of charges due to  Change in outage schedule  Tripping/ revival of a particular transmission element

COMPLICATIONS IN PROCESSING APPLICATIONS DUE TO 4.Different traders for the same set of buyer & seller 5.Same set of buyer, seller and trader but additional sale of power 6.Same set of buyer, seller & trader but varying capacities wheeled through different routes

DISTRACTIONS FOR RLDC OPERATORS Several inconsistent requests for revisions in short-term transactions Frequent phone calls from stakeholders Applications submitted at the last moment upsetting the whole scheduling process

Stranded generation ? Report of the ‘Task Force on Investment and Reforms’ estimates installed capacity of captive to be in excess of 27,500 MW as of Need for identifying which of these is actually ‘stranded’. Power from Internal Combustion based Diesel Generation Sets may not be viable for inter-state trading.

Inter-state trading - a perspective In FY , PTC’s trading volume was just 1.84% of the country’s regional energy consumption (excluding trading against Malana, Chukha and Kurichu hydro projects). These hydro projects contributed 18.5% to PTC’s trading volume of MUs. In May 2004, after inter-state open access was implemented, the total inter-state contracted power through trading in Northern Region was 2.62% of the regional consumption.

Inter-state trading-a perspective (contd/-) Considering the diversity of loads across states and regions and the network capability, the scope for inter- state trading is limited. Identifying viable captive generation would provide a major fillip to trading. However a major boost to trading will occur only after Availability Based Tariff (ABT) is implemented at intra- state level and open access allowed in distribution by SERCs.

Inter-state trading-a perspective (contd/-) Captive generators would be generally embedded in the state system. Obviously, these captive generators cannot become a partner in the regional level scheduling and Unscheduled Interchange (UI) Pool Account as it would become totally unmanageable. Intra-state ABT with payment security mechanism for UI is a must.

Pan-caking of open access charges ? Since inter-state open access has been implemented in the country with effect from 6 th May 2004, NRLDC has handled more than 250 applications to date. How thick is the open access pancake?

Volume of Inter-state trading in Northern Region MonthNR monthly energy consumption in Million Units (A) Scheduled Open Access Trading in Million Units (B) % of trade volume to energy consumption (C) = (B*100/A) May % Jun % Jul % Aug %

0.05% energy more than 40 paise/kWhr 1.27% energy 20 to 40 paise/kWhr 13.93% energy 15 to 20 paise/kWhr 66.70% energy less than 5 paise/kWhr 0.58% energy 5 to 10 paise/kWhr 17.46% energy 10 to 15 paise/kwhr TOTAL COST FOR SHORT-TERM TRANSMISSION TRANSACTIONS APPROVED BY NRLDC IN MAY 2004 TOTAL MWHr RESERVED = The above cost includes the transmission charges, scheduling charges, 2 % handling charges and non-refundable processing fees

Break-up of open access cost for May 2004 Nodal RLDC charges: 0.38 paise/kwh Other RLDC charges: 0.14 paise/kwh CTU charges : 6.59 paise/kwh Total: 7.11 paise/kwh Since 75% of CTU charges are ultimately refunded to long term customers, the incremental increase is only 2.15 paise/kwh. This is much less than the current level of trading margins.

Transmission constraint ? If network constraints do not permit short-term inter-state transactions, can it be called a transmission constraint ? No ! Transmission constraint term is a misnomer. The network has simply not been planned for any random short-term transaction. It has been planned for a certain Central Sector generation with related security criteria. It is suggested that in case of network congestion priority could be given to cheaper power (say hydro power in North-Eastern Region)

Inter Regional Links Present IR Capacity = 8,500 MW By the year 2012 = 30,000 MW 500 MW 1200 MW 1000MW 2000MW 500 MW

Transmission constraint The other questions are : ‘Can we over-design our transmission network to accommodate all possible short-term transactions ?’ Who pays the cost for such a vast network ? Is it worthwhile considering the small quantum of short- term inter state trading involved?