SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Electronics Review Review of cable procurement and installation Davide Piccolo INFN Napoli.
Advertisements

TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Standard Rung 30mm 385mm 350mm 10mm 111mm 2mm47mm77mm107mm 147mm177mm207mm 236mm272mm302mm332mm355mm 378mm.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
CLIQ power supply Integration. General view: -Schroff rack 19’’ 25U (500mm x 600mm x 1120mm). -2 fixed wheels +2 castor wheels with brake ⦰100mm.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Status of NA62 straw electronics Webs Covers Services Readout.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Profiler Mechanics Update
Baby-MIND Modules & Services
Integration and Services RE3/1 and RE4/1
Rack Design Proposal as of 01/03/2013
Service channels between Tracker and PP1
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Update of MVD services and requests
DCS: Temperature Probes
VELO-installation meeting CERN, January 17, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
T1 Electronic status Conclusions Electronics Cards:
Chamber Design and Integration RE3/1 and RE4/1
Electronics for RPC Upscope
Fiber Installation for RUN 3&4
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Area of a rectangle Tuesday, 05 February 2019 Definition:
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling (Rustem request) VII.Low Voltage Patch Panel VIII.Labelling issues IX.Data cable issues (crate)

I. Cable status SPD: cables and reels ready, waiting for cabling discussions Control: cables and reels ready, waiting for cabling discussions HV: cables and reels ready, waiting for cabling discussions LV: cables in reels, reel (matrix) label to be defined: now… DSS and other: to be discussed.

II. Cabling at VFE box: numbering Location definition Location on the fixation bars:

II. Cabling at VFE box: numbering for LV cables Regulator LV in: connection at the entrance 1234 DIN terminal connectors Location on the fixation bars of DIN terminal : 6 7

III. Cable through chains (Gael) I1, I2, I3, I4, I5, I6, O2, O3, O5, O6: data cables (with spares) + bundle of corresponding control cables O1 and O4: service: HV, LV, LED, Reg Ctrl and DSS. Final packing factors: about 0.33?

III. Cable through chains (Gael) Inner chain

III. Cable through chains (Gael) Outer chain v Preferences? Matrix labels to be put today...

IV. Data spare cables SM (top) CrateMatrix label O6 31I I2 I3 Spare cables will be attached in the worst case (length) situation SM1 and SM2 share one spare cable. Spare cable going from SM4 to crate 1 is the worst case. SM (bottom) CrateMatrix label O2 31O O3 I5

IV. Control bundles for VFE cards and regulator cards VFE cards: 1 bundle matching data cables in a chain compartment. Regulator cards: 1 bundle per side to crate 1 (Control Board 0.5 occupancy) Spares added inside the bundle (worst case for location in fixation bars). Cables inside a bundle got to same crate BUT DIFFERENT VFFE boxes. SMTopBottom 14 to crate 0 1 to crate 1 3 to crate 0 1 to crate spare to crate 0 2 to crate spare to crate 0 2 to crate 1 36 to crate to crate spare 1+1 spare to crate 1 4 to crate to crate spare 1+1 spare to crate 1 42 to cr to cr to cr spare

VI. Information for cabling Entry point not defined for control and HV bundles: individual cabels go to different positions. Spare cables need some extra length at the VFE boxes (worst case location) Would it be difficult to re-connect spare cables to far locations?

VII. SPD LV Patch Panel 1)We assume that the LV Patch Panel for SPD will located in the lateral of rack L3B03 for C side and rack L3B13 for A side. 2)18 LV cables ( spares) come from the VFE boxes in each detector side. For the moment, the patch panel only takes into account the 16 operational cables. 3)The patch panel will include an aluminium frame where the LV cables will be fixed (to avoid any tension on the connectors), therefore a way to fix the frame of the patch panel on the side of the rack has to be found… 4)The patch panel will be connected to the Marathon Power Supplies with cables screwed on the bottom layer of the patch panel PCB. 5)On the top layer of the patch panel PCB there will be the connections, fuses and LEDs. 6)There are two possible ways of building the patch panel: a)Connecting the LV cables coming from the VFE only from the back of the patch panel (the back of the rack). This results on a patch panel of 80 cm (vertical dimension), see next slide b)Connecting the LV cables coming from the VFE from the back and from the front of the rack. Then, the shape is more “compact”, see next slide.

VII. SPD LV patch Panel 800 mm 250 mm 400 mm 16 cables from the back 8 cables from the back 8 cables from the front

VIII. Labelling issues Labels can be attached following the cable (polyester: high performance) or perpendicularly (nylon: flexible). For LV cables are longitudinal. Other cables? See control cable bundle example. Detector label follows bar code label.

IX. Data cable issues (crate) A fixation bar is needed to fix the SPD data cables coming to the back of the crate. Rustem found a possible solution. Best location is to be defined (below/over the center of the connector) Connecting SPD data cables to connector on the back of the crate WILL BE VERY VERY DELICATE. The installation/test procedure has to be defined: 1.Install the cable and attach it to the fixation bar. 2.Test cable with portable set up 3.An expert should connect cable (implications on connection order of other cables in the back of the crate) 4.Test cable connection with special set-up or PS/SPD FEB.