K.K. GanUS ATLAS Pixel Meeting1 Opto-IC/Board K.K. Gan The Ohio State University WBS 1.1.1.3 & 4 July 9, 2003.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

PIXEL WEEK September 1999 S. Kersten University of Wuppertal 1 Status of Interlock Box New Interlock Box: NTC -I Box q relative changes in resistor values.
IEEE10/NSS R. Kass N A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State.
Richard Kass IEEE NSS 11/14/ Richard Kass Radiation-Hard ASICs for Optical Data Transmission in the ATLAS Pixel Detector K.E. Arms, K.K. Gan, M.
VERTEX 2002 Experience with Parallel Optical Link for the CDF Silicon Detector S. Hou for the DOIM group Academia Sinica, Taiwan.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
VCSEL Failures in ATLAS T. Flick, University of Wuppertal TWEPP 2010 Aachen,
LECC03, 9/30/2003 Richard Kass/OSU 1 Richard Kass Radiation-Hard ASICs for Optical Data Transmission in the ATLAS Pixel Detector K.E. Arms, K.K. Gan, M.
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
LightABLE Production Status ID Week October 2014 Tony Weidberg1.
IEEE06/San Diego R. Kass N Bandwidth of Micro Twisted-Pair Cables and Spliced SIMM/GRIN Fibers and Radiation Hardness of PIN/VCSEL Arrays W. Fernando,
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
DPF 2013 R. Kass 1 P. Buchholz, M. Ziolkowski Universität Siegen OUTLINE Lessons learned… IBL/nSQP opto-board overview assembly experience radiation hardness.
R. KassIEEE05/Puerto Rico N Radiation-Hard Optical Link for the ATLAS Pixel Detector Richard Kass The Ohio State University W. Fernando, K.K. Gan,
R. KassIEEE04/Rome 1 Radiation-Hard ASICs for Optical Data Transmission in the ATLAS Pixel Detector Richard Kass The Ohio State University K.E. Arms, K.K.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
IEEE08/NSS R. Kass N Radiation-Hard/High-Speed Data Transmission Using Optical Links W. Fernando, K.K. Gan, A. Law, H.P. Kagan, R.D. Kass, J. Moore,
K.K. GanUS ATLAS Review1 Optical Hybrids K.K. Gan The Ohio State University WBS
Ingrid-Maria Gregor (University Wuppertal) for the ATLAS collaboration June 6th, 2000 Optical Links for the ATLAS SCT and Pixel Detector International.
K.K. GanUS ATLAS Pixel Meeting1 Opto-Board K.K. Gan The Ohio State University WBS
STATUS OF VCSEL BASED OPTO-LINKS JOSHUA MOSS, JENS DOPKE AUGUST 19, 2010 On-going analysis for the on-detector Pixel VCSELs TEMPERATURE MEASUREMENTS OPTICAL.
R. Kass US LC Conference 1 Design and Fabrication of a Radiation-Hard 500-MHz Digitizer Using Deep Submicron Technology R. Kass The Ohio State University.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Development of DC-DC converter ASICs S.Michelis 1,3, B.Allongue 1, G.Blanchot 1, F.Faccio 1, C.Fuentes 1,2, S.Orlandi 1, S.Saggini 4 1 CERN – PH-ESE 2.
ICTPP09 R. Kass Radiation-Hardness of VCSELs & PINs Richard Kass The Ohio State University OUTLINE Introduction/ATLAS pixel detector Radiation Hardness.
S.Hou, Academia Sinica Taiwan. 2Outline Optical links for ATLAS Laser-driver  fiber  PIN-driver LHC modules in service Rad-hard requirement for LHC/SLHC.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
BTeV Pixel Detector Optical link receiver chip Data In and Out project.
Etam Noah, CERN15 th September 2004Qualification of the CMS Digital Optohybrid Outline: CMS optical digital control links DOH components DOH history and.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
C. Issever, Oxford 1 Status of Radiation Proposal Focus on: Amendment to Proposal Radiation Protocols.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Low Voltage Power Supplies I.Placement II.Size III.Power consumption IV.Cabling V.Regulators board blocs VI.Component selection VII.Schematics VIII.Firmware.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
SCT/Pixel Off-detector VCSELs
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Michał Dwużnik, for the SCT collaboration
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
Honeywell Advanced Photonics Development Overview ATLAS Meeting January 7, 1999 John Lehman Honeywell Technology Center
July 17, 2013 CERN T. Flick University of Wuppertal.
DPF 2011 R. Kass 1 P. Buchholz, A. Wiese, M. Ziolkowski Universität Siegen OUTLINE Introduction Result on 4-channel Driver/Receiver with Redundancy Design.
PIN current degradation Versus 3 MeV proton fluence 3 MeV proton (a)(b) (c)(d) Study of radiation damage in VCSELs and PINs for the optical links of the.
David Nelson SQP E-board November 4, Pixel nSQP E-board Presented by David Nelson
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
12/10/01 - Cecilia Gerber UIC Slide 1 Testing Card specifications l Will be used in the Run2b SASEQ-based test stands  needed. Build 75, two.
J. Ye SMU Joint ATLAS-CMS Opto-electronics working group, April 10-11, 2008 CERN 1 Test Results on LOC1 and Design considerations for LOC2 LOC1 test results:
March 14, 2016 Report on SMU R&D work1 Link-On-Chip (LOC) 1st Prototype  Status:  Prototype chip with the clock unit (PLL), serializer, laser driver,
M. Gilchriese WBS Pixel System DoE/NSF Review May 2003.
1 Back-Of-Crate : BOC Status Oct, 2002 BOC is the optical fibre interface for the ROD Receives module control data from ROD, performs clock-data encoding,
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
K.K. GanP l Goals of High Energy Physics Research q determine ultimate constituents of matter q study nature of forces between constituents l Physics.
Radiation hardness of the 1550 nm edge emitting laser for the optical links of the CDF silicon tracker S. Hou 15-Jun-2004.
Preliminary thoughts on SVT services
Optical data transmission for
Status report of the ATLAS SCT optical links
Old ROD + new BOC design plans
BOC1 Run Thru: Agenda 14h30 Start CB Local Meeting 16h00 Break for Tea
Presentation transcript:

K.K. GanUS ATLAS Pixel Meeting1 Opto-IC/Board K.K. Gan The Ohio State University WBS & 4 July 9, 2003

K.K. GanUS ATLAS Pixel Meeting2 Outline l Introduction l VDC/DORIC l Opto-board l Cost and schedule summary l Conclusions

K.K. GanUS ATLAS Pixel Meeting3 ATLAS Pixel Opto-link

K.K. GanUS ATLAS Pixel Meeting4 OSU Responsibilities l VDC and DORIC: P design P testing of 50% of final production l Opto-board: P design and fabrication P testing of 50% of final production?

K.K. GanUS ATLAS Pixel Meeting5 OSU ATLAS Personnel l Faculty K.K. Gan, Harris Kagan, Richard Kass l Research Associates Amir Rahimi, Mike Zoeller l Graduate Students Kregg Arms, Rouben Ter-Antonian l Engineers Mark Johnson, Chuck Rush l Technicians Jim Burns, Jason Moore, Shane Smith, Bob Wells new

K.K. GanUS ATLAS Pixel Meeting6 l VDC: convert LVDS signal into single-end signal to drive VCSEL l DORIC: extract clock and command signal from bi-phase mark encoded signal received at PIN l five IBM prototype runs with various improvements and changes in response to opto-pack evolution u four MPW runs plus one with FE/MCC-I1 l VDC/DORIC-I5e were submitted with MCC-I2 as engineering run u convert from 3-metal MPW layout to 5-metal layout u minor improvements in DORIC-I5e P this will be production run if performance is satisfactory Status of VDC/DORIC

K.K. GanUS ATLAS Pixel Meeting7 l bright current is similar to I5 l dim current is similar to I5 and close to target 1 mA l rise/fall times, duty cycle, current consumption within specs VDC-I5e: Bright and Dim Currents vs. I set VDC-I5e VDC-I5 high power oxide VCSEL

K.K. GanUS ATLAS Pixel Meeting8 l started with 1-channel VCSEL l adapted 8-channel p+ VCSEL to use with MT connector l converted to oxide VCSEL because p+ has been discontinued by Truelight l converted to high-power oxide VCSEL because normal oxide has been discontinued by Truelight VCSEL Opto-pack Evolution

K.K. GanUS ATLAS Pixel Meeting9 l p+/oxide VCSELs have similar optical power in operating range (10-20 mA) l oxide VCSELs have larger effective serial resistance  smaller VCSEL current when driven by VDC I-V Curves/Optical Power of P+, Normal & High Power Oxide VCSELs high power oxide (3 arrays) normal oxide high power oxide (2 arrays) p+

K.K. GanUS ATLAS Pixel Meeting10 l some VCSEL arrays contain a channel with much larger effective serial resistance  maximum VCSEL current of 10 mA when driven by VDC  significantly below target of 20 mA annealing current I-V Curve of High Power Oxide VCSELs normal oxide high power oxide p+ with 10  high power oxide

K.K. GanUS ATLAS Pixel Meeting11 l some links have twice as worse PIN current thresholds for no bit errors l measured with all clocks running asynchronically High Power Oxide VCSEL with Negative Common Cathode 20 mA V -0.2 V 10 mA V gnd other 80  A other links off

K.K. GanUS ATLAS Pixel Meeting12 l PIN current thresholds for no bit errors measured with 44-pin packages l thresholds are low and similar to DORIC-I5  expect lower thresholds on opto-board as DORIC-I5 l upper thresholds > 1200  A l successfully converted reset from active high to low DORIC-I5e: PIN Current Thresholds for No Bit Errors

K.K. GanUS ATLAS Pixel Meeting13 l control circuit boards:designed/built/tested l LabView programs:written/tested l VDC/DORIC QA plan: n currently use packaged chips to exercise QA system n have received probe cards  perform QA with probe station l opto-board QA plan: n perform QA in temperature controlled chamber  QA system almost ready for production VDC/DORIC/Opto-board Quality Assurance

K.K. GanUS ATLAS Pixel Meeting14 l converts: optical signal  electrical signal l contains 6-7 optical links: P layers 1 and 2 optical link: u 2 DORICs, 2 VDCs, PIN/VCSEL (opto-pack) P B layer optical link: u 2 DORICs, 4 VDCs, PIN/2 VCSEL (opto-pack) l use BeO for heat management but prototype initially in FR-4 for fast turnaround and cost saving u have four FR-4 prototype runs to accommodate various design changes in chips/opto-packs Opto-Board

K.K. GanUS ATLAS Pixel Meeting15 l First batch: n 30 boards delivered in April n several open vias on each board due to insufficient gold filling  repair with wire-wrap wires Status of BeO Opto-board VDC-I5opto-pack

K.K. GanUS ATLAS Pixel Meeting16 PIN Current Thresholds for No Bit Errors l low PIN current thresholds for no bit errors independent of activity in adjacent channels  no design errors

K.K. GanUS ATLAS Pixel Meeting17 l Second batch: n 31 boards delivered in June n vias overfilled and excess metal ground away  no open vias n 17 boards have shorts between power and ground lines n attempt to populate a second BeO board: u opto-pack housing fits well u one DORIC mounted backward u no visible damage to adjacent chip after replacement u board failed to work  replaced both DORICs  opto-board now works! Status of BeO Opto-board

K.K. GanUS ATLAS Pixel Meeting18 BeO Opto-board from 2nd Batch VDC housing DORIC opto-pack latch broken 34.7 o C 36.4 o C Ambient: 22.5 o C

K.K. GanUS ATLAS Pixel Meeting19 l both opto-boards have low PIN current thresholds for no bit errors independent of activity in adjacent channels u will produce opto-boards with second vendor PIN Current Thresholds for No Bit Errors 2nd batch 1st batch OSU

K.K. GanUS ATLAS Pixel Meeting20 Opto-Link Proton Irradiations l four 24-GeV proton irradiations at CERN in last three years P OSU designed and fabricated all test systems: u cold box: electrical test of DORIC/VDC u shuttle: test of opto-link on opto-boards BER tester fibers opto-board

K.K. GanUS ATLAS Pixel Meeting21 l duty cycle increases by ~ 2% after 58 Mrad VDC-I4: Clock Duty Cycle vs. Dosage

K.K. GanUS ATLAS Pixel Meeting22 l VCSELs annealed with 20 mA during indicated periods l PIN current thresholds for no bit errors remain constant up to 21 Mrad Opto-Board Bit Error Threshold vs. Dosage Dosage/VCSEL Annealing Time

K.K. GanUS ATLAS Pixel Meeting23 l opto-link with DORIC/VDC-I3 and p+ VCSEL opto-pack meets radiation specs l August 2003 irradiation: P double irradiation statistics: u cold box:four 4-channel DORIC/VDC u shuttle:four opto-boards Proton Irradiation Summary and Plan

K.K. GanUS ATLAS Pixel Meeting24 l cost adjustments: P BeO opto-board prototype run with new vendor: $15K P increase cost for production BeO boards: $30K P increase cost for SMD mounting of production BeO boards: $3K P technician for opto-board production: $57K l no funds allocated in FY04 irradiation: P need irradiation of random sample of production opto-boards? l WBS FY04 P ETC03: $78K? P ETC04: $78K+$105K Changes in ETC04

K.K. GanUS ATLAS Pixel Meeting25 Opto-Board Milestones 4 4 ???

K.K. GanUS ATLAS Pixel Meeting26 l preliminary results indicate that DORIC/VDC-I5e can be used for production opto-boards l BeO prototype opto-board can operate with low PIN current thresholds u no technical problem is foreseen but first vendor is unsatisfactory Summary