APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.

Slides:



Advertisements
Similar presentations
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
Advertisements

Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
The RHIC Collider Fulvia Pilat Collider Workshop, JLAB, February 24, 2009.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Accelerating Polarized Protons Mei Bai Collider Accelerator Department Brookhaven National Laboratory PHNIX Focus, Feb. 24,
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
APEX Report March 3, 2010 Fulvia Pilat Time Meeting, March 9, 2010.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Simulation of Spin Interference and Echo Effect Abstract Successively jumping across a depolarization resonance twice produces interesting spin dynamics.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
Accelerating Polarized Protons to High Energy Mei Bai Collider Accelerator Department Brookhaven National Laboratory.
APEX Schedule April :30am12:30pm5pm IBS suppression lattice Litvinenko, Tepikian +team Back 2 Phys 4pm Nonlinear Chromaticity (Response.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
What is the time estimated to change the energy and re-establish stable operation by steps of ~1% (threshold scan), a few%, or more than 10%? Comments.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
First Look at Nonlinear Dynamics in the Electron Collider Ring
Summary Thursday h21: Stable beams fill #1303.
Summary for LPC (March 7th, Ralph Assmann)
Another Immortal Fill….
Presentation transcript:

APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008

Feb : Background, steering, and collimation 55 bunches PHENIX 8 kHz at start Blue then yellow collimation STAR re-steering Beta* squeeze (Satogata + team)

 *=0.65m APEX Conclusions Goal: Commission pp83lowbeta,  *=0.65m in IR6/8 for operations There are presently no show-stoppers for adoption for run_fy09 This is equivalent to  *=0.40m at 250 GeV Ramp efficiencies are good: 93-95% in both rings Nonlinear chrom correction works, but needs careful ramp tuning Sextupoles are the main cause of failed pp83lowbeta ramps Ramp system checks on sextupole ramping speed would help Collimation worked with no beam decay penalty Experiments agree that backgrounds were reasonable 55 bunches, PHENIX peak 8-10 kHz, emittance pi um STAR consistent after steering, with singles correction Open issues: Luminosity and beam lifetime: how much worse? Yellow dispersion/optics

Goal: measure spin coherent oscillation excited by a vertical ac dipole with a tune close to the spin tune A new design of RHIC spin flipper is scheduled to be installed during summer shut down. This will allow us to bench mark our model of the new design RHIC spin flipper Ac dipole 1:Ac dipole 2: Spin rotator 1: Axis: vertical Angle  0 : 90 o Spin rotator 2: Axis: vertical Angle  0 : -45 o Spin rotator 2: Axis: vertical Angle  0 : -45 o M. Bai, T. Roser

Q sf =0.495Q sf =0.49 Q sf =0.495 Q sf =0.493 Q sf =0.491 AC dipole current readback[A] polarization vs. ac dipole tune indicates the blue spin tune is around 0.495

Summary Highlight: first data set from previous APEX session indicates coherent precession a quick polarization vs. ac dipole tune indicates the blue spin tune is around This is consistent with the result of quick tune scan at injection early in the run But: The three data sets we took during this session were not ideal due to a thicker blue target. Since the total amount of events is limited by the WFD(80Million), the thicker the target, the less revolutions and bigger error bars. Thin target: 16,075,851 revolutions Thick target: 7,523,654 revolutions Since all the blue vertical thin targets are gone, would be good to repeat two measurements in Yellow. Estimate: ~1 hour.

APEX: February 27 RF phasing Litvinenko, Abreu, Ptitsyn, etc….. 2 test ramps with 6 and 12 bunches; Injected with 80º shift to 70º at before ramping and decrease the phase to 0º at the first 70 seconds of the ramp; Long. emittance blows at injections due to dynamic loading which causes a dipole oscillation of the bunches; Comparison between the efficacy of the method was difficult due to emittance blown-up.

Injection with 80 º Comparison of bunch length for two ramps with and without rf phasing 9949 (no rf phasing); 9956 (rf phasing) Bunch length increase

APEX Schedule March 5, :30am1pm6am7am11:30am Injection BBQ 8:30am End of physics store Chromaticity Feedback Cameron +team Long Vernier Scan Fischer +team Coherent spin precession Bai Injection Impedance localization Blaskiewicz Bai Ramps BBQ Chromaticity Feedback Cameron +team Radial Feedback Schultheiss Hoff