NCSX Project Overview Hutch Neilson, NCSX Project Manager For the NCSX Team NCSX Conceptual Design Review Princeton, NJ May 21, 2002.

Slides:



Advertisements
Similar presentations
Extension of IEA Implementing Agreement on Large Tokamak Facilities Presented to Committee on Energy Research Technologies October 18-19, 2005 Paris, France.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Steps Toward a Compact Stellarator Reactor Hutch Neilson Princeton Plasma Physics Laboratory ARIES Team Meeting October 3, 2002.
Compact Stellarator Configuration Development Planning Hutch Neilson Princeton Plasma Physics Laboratory ARIES Team Meeting October 4, 2002.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
Physics of fusion power
Hutch Neilson NCSX Project Manager Princeton Plasma Physics Laboratory Oak Ridge National Laboratory NCSX Research Forum #1 Princeton Plasma Physics Laboratory.
US-Japan Workshop on Fusion Power Plants and Related Advanced Technologies High Temperature Plasma Center, the University of Tokyo Yuichi OGAWA, Takuya.
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 18 January 2012 Stellarator Program Update.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Princeton University Plasma Physics Laboratory EVMS Certification Review NSTX Project Overview Ron Strykowsky October 4-6, 2011.
NCSX 1 NCSX Engineering Overview Wayne Reiersen NCSX Engineering Manager On behalf of the NCSX Team.
Hutch Neilson Princeton Plasma Physics Laboratory K-DEMO Project Meeting 26 June 2013 NFRI-PPPL K-DEMO Project Status and Plans Overview.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
AES, ANL, Boeing, Columbia U., CTD, GA, GIT, LLNL, INEEL, MIT, ORNL, PPPL, SNL, SRS, UCLA, UCSD, UIIC, UWisc FIRE Collaboration FIRE.
Managed by UT-Battelle for the Department of Energy Stan Milora, ORNL Director Virtual Laboratory for Technology 20 th ANS Topical Meeting on the Technology.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
V. A. Soukhanovskii NSTX Team XP Review 31 January 2006 Princeton, NJ Supported by Office of Science Divertor heat flux reduction and detachment in lower.
AES, ANL, Boeing, Columbia U., CTD, GA, GIT, LLNL, INEEL, MIT, ORNL, PPPL, SNL, SRS, UCLA, UCSD, UIIC, UWisc FIRE Collaboration FIRE.
Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 3 March 2011 Stellarator Program Update.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Fusion Fire Powers the Sun Can we make Fusion Fire on earth? National FIRE Collaboration AES, ANL, Boeing, Columbia U., CTD, GA, GIT, LLNL, INEEL, MIT,
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Anthony Indelicato DOE-Princeton Site Office May 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
Summary and Closing Remarks Farrokh Najmabadi UC San Diego Presentation to ARIES Program Peer Review August 29, 2013, Washington, DC.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Compact Stellarator Approach to DEMO J.F. Lyon for the US stellarator community FESAC Subcommittee Aug. 7, 2007.
U.S. Fusion Energy Sciences Program Fusion Program Summary for Program Leaders February 7, 2005 E xcellent S cience in S upport of A ttractive E nergy.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 Stability Studies Plans (FY11) E. Fredrickson, For the NCSX Team NCSX Research Forum Dec. 7, 2006 NCSX.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
Steady State Discharge Modeling for KSTAR C. Kessel Princeton Plasma Physics Laboratory US-Korea Workshop - KSTAR Collaborations, 5/19-20/2004.
Comments on Fusion Development Strategy for the US S. Prager Princeton Plasma Physics Laboratory FPA Symposium.
GOLEM operation based on some results from CASTOR
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
MCZ MCZ NCSX Mission Acquire the physics data needed to assess the attractiveness of compact stellarators; advance understanding.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
PPPL Stellarator Program Overview Hutch Neilson NCSX Project Manager NCSX Program Advisory Committee Meeting #6 Princeton, NJ December 9, 2002.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
1 The Five Year Plan review went well on all counts Review held June 30 - July 2 > 1.5 days of presentations by the Team Panel of nine (Hooper, Bravenec,
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Camera PDR/CD1 Planning 19 September 2008
Pilot Plant Study Hutch Neilson Princeton Plasma Physics Laboratory ARIES Project Meeting 19 May 2010.
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Stellarator Program Update: Status of NCSX & QPS
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

NCSX Project Overview Hutch Neilson, NCSX Project Manager For the NCSX Team NCSX Conceptual Design Review Princeton, NJ May 21, 2002

2 The National NCSX Team UCSD, Columbia U., LLNL, ORNL, PPPL in collaboration with Auburn, NYU, SNL-A, Texas-Austin, Wisconsin Australia, Austria, Germany, Japan, Russia, Spain, Switzerland, Ukraine

3 Stellarators Are Making Great Progress Large Helical Device (Japan)  > 3%. T e ≈ 10 kev, T i ≈ 5 keV. enhanced confinement. 2-minute pulses. Wendelstein 7-X (Germany) (2006) non-symmetric optimized design. Under construction (operates 2007). Wendelstein 7-AS (Germany)  > 3%. enhanced confinement. density control & enhanced performance w/island divertor.

4 The U.S. Stellarator Program Has Moved Forward in the Past Year Helically Symmetric Experiment (U. Wisc.) Successful test of quasi-symmetry. Compact Toroidal Hybrid (Auburn) Construction progressing: operates Theory Program is Emphasizing Stellarator Physics Successful 3D Physics Planning Workshop in January. New advances: 3D equilibrium reconstruction code (approved), 3D edge simulation code (proposed collaboration w/ Germany), improved optimizers. Stellarator Collaborations are Increasing Participation in LHD and W7-AS experiments. Theory collaborations with Germany, Japan, Australia. Stellarator System Studies are in the Plans ARIES compact stellarator power plant optimization study starts soon.

5 U.S. Compact Stellarator Design Efforts (NCSX and QPS) Have Been Successful Successful Physics Validation Reviews confirmed physics approach. NCSX: High- , quasi-axisymmetric test at PoP scale. QPS: Quasi-poloidal symmetry, very low aspect ratio at CE scale. Designed by joint team using common tools. DOE Approved Mission Need (CD-0) for Both Projects. Moved into conceptual design in May, FESAC Endorsed NCSX as a Proof-of-Principle Experiment. Citing potential to resolve reactor issues (steady-state, disruptions) and advance the physics of 3D magnetized plasmas. “These gains earn for the compact stellarator an important place in the portfolio” DOE Requested $11.8M in FY-2003 Budget Submission to Initiate NCSX Project Starting this October. Also, an increase for QPS conceptual design in FY-03, aiming for an -04 start. The Compact Stellarator is Becoming a Reality.

6 The NCSX Mission Supports OFES Program Goals: Fusion Solutions, Plasma Science 1.Acquire physics knowledge needed to evaluate the compact stellarator as a fusion concept. Passively stable without active feedback; no disruptions. Steady state with no recirculating power for current or rotation drive. Enhanced confinement compatible with power & particle exhaust. Low aspect ratio (≤4.4) and high beta (≥ 4%)  high power density. Addresses FESAC / IPPA Milestone: “Determine attractiveness of a CS” 2. Advance understanding of 3D plasma physics for fusion and basic science. Effects of… Rotational transform sources (internal vs external), 3D plasma shaping, Magnetic quasi-axisymmetry, and 3D edge, … on toroidal physics: equilibrium, stability, transport, boundary.

7 The NCSX Conceptual Design Effort Has Produced a Sound Basis on Which to Proceed NCSX Conceptual Design Report documents… Design Plans Cost and schedule Management

8 A Conceptual Design Meeting NCSX Mission Requirements Has Been Developed Magnets provide required physics properties (stability, surface quality, quasi-axisymmetry), are practical to build, and can be assembled over vacuum vessel. Provides access for heating, diagnostics, pumping, first wall, personnel. Delivers required physics flexibility, startup scenario, B-field strength, current, and pulse length with adequate engineering margins (structural, thermal, thermo-hydraulic). Risk mitigation measures are being taken. Manufacturing studies by industry were especially valuable: –High interest in modular coils and vacuum vessel by capable suppliers. –Their feedback improved our designs, fabrication plans, and estimates.

9 NCSX Plasma and Magnets

10 Vacuum Vessel

11 Completed Stellarator Core

12 NCSX Will Be Sited in the PLT / PBX-M Test Cell and re-use PBX-M Neutral Beams and Vacuum Pumps Designed to accept all 4 beams; 2 will be installed at first plasma. Site is being cleared now with excess facilities disposal funds.

13 NCSX Also Uses D-Site Facilities TFTR TEST Cell (NCSX sub- assembly area) NCSX Test Cell D-Site Power Supplies (NCSX Magnets) NCSX Control Room NCSX Magnet Power Cables D-Site Motor- Generators

14 Fabrication Project Scope: Equipment Needed at First Plasma and Installation of 2 Existing Neutral Beams Stellarator Core (R = 1.4 m). External magnets, vacuum vessel, limiters, cryostat. Peak ratings: B ≤ 2 T, I p ≤ 350 kA. t flat = 0.3 T / 1.7 T Heating, Fueling, Vacuum (Auxiliary Systems) Neutral beam injection (3 MW) installed; gas injection, torus vacuum pumping, glow discharge cleaning. Diagnostics Magnetics, interferometer, visible cameras, magnetic field mapping equip. Power Systems Magnet power for B = 1.5 T, I p = 154 kA scenario; C–site AC power. Central I&C Facility control and timing, computer network, data acquisition, control room. Facility Systems Water, cryogenics, bakeout. Integrated System Testing and First Plasma

15 Project Cost is Estimated to be $72M Contingencies are estimated at the subsystem level, based on technical, cost, and schedule risk factors.

16 PPPL Overhead Rates Were Approved in the Past Week Slight changes from assumptions at press time. Bottom line unchanged. Current estimate will be presented. Costs in $M

17 Fabrication Project Can Be Completed by March, 2007

18 Project Funding Requirements for Mar. ’07 1st Plasma Funding drivers: FY-03: design and mfg. development for critical components FY-04: award major fabrication contracts.

19 Research Preparations Will Proceed in Parallel with the Fabrication Project Scope: prepare analytical and hardware tools needed beyond first plasma and flux-surface mapping. (Follows NSTX approach.) Maintain physics connections, collaborations with other stellarator programs. Design and begin fabrication of upgrade hardware (diagnostics for Ohmic phase; PFCs, 350 C bake, internal trim coils, and diagnostics for NBI phase). Plan research program in more detail and start building team as operation nears.

20 NCSX Program Funding Requirements FY03-06 Funding peak = $21.1M (vs DOE guidance of $18.6M). Completes project on desired schedule (March, 2007), ready to proceed with research program. *Operations funding starts in FY-2007.

21 The Project Organization is Functioning Well DOE / Contractor “Integrated Project Team” is working well. –Members from DOE-PAO, DOE-OFES, PPPL, ORNL. –Has met at least monthly since –Planned PVR and this review. Prepared DOE acquisition documents. Successful PPPL-ORNL partnership will continue. –Has worked well since 1998, developed physics basis, conceptual design. –Responsibilities for fabrication project are clearly defined. –Strong upper management support at both Labs. Will follow management approach that has been successful in PPPL– managed fusion projects, e.g., TFTR D&D, NSTX. –Central project management and work authorization system. –All procurement and QA / QC support through PPPL. –Line management responsible for E.S.&H.; supported by E.S.&H. professionals. –Approved (and proven) PPPL procedures for doing work safely. –NCSX Project Execution Plan issued as part of Conceptual Design Report.

22 NCSX Project Organization

23 DOE Acquisition Process: Next Step is CD-1, July, ’02 CD-1 deliverables are in preparation. Most, including draft Acquisition Execution Plan, are included in C.D.R. NEPA process is under way.

24 Production of Modular Coils and Vacuum Vessel Needs to Start Early in FY-04 to Maintain Schedule Project Schedule: Perform preliminary design, final design, and manufacturing development for these components in FY–03. Conduct DOE Preliminary Design Review of NCSX in May, –Review overall design maturity and establish performance baseline for CD-2. Start procurement process for modular coil production late in FY-03. Award production contracts for modular coil forms (Nov. ’03), vessel (Apr. ’04). CDs for these components need to be advanced to stay on schedule. At CD-1 (July, ’02), we need authorization (“CD-2  ”) to be able to start F.D. of the modular coils (March,’03) and vacuum vessel (May, ’03). At CD-2 (June, ’03), we need authorization (“CD-3  ”) to be able to start production of the modular coils and vacuum vessel. At CD-3 (April, ’04), we need approval to begin fabrication of remaining components.

25 Summary / Preview : Status of NCSX The NCSX conceptual design provides a sound technical basis on which to proceed. Physics and engineering analyses show that the design meets mission requirements with adequate margins (Charge #1 and #2). Manufacturer input has boosted confidence in the constructability of the design, R&D plans, manufacturing plans, and estimates. (#2) Bottoms-up estimates show the project can be completed by March, 2007 at a cost of $72M, with reasonable contingencies (#3). A successful project organization is well established. The management plans for NCSX follow proven models for safe and successful project execution (#3, #4). Research preparations and plans are commensurate with needs. (#5) PVR issues have been resolved, commensurate with needs. (#1)