Berkeley HEDAW. HESSI Data Analysis Workshop (HEDAW) Welcome to Berkeley Logistics - McTiernan.

Slides:



Advertisements
Similar presentations
Scheduling Timeline: Current 8 th Grade January 28-30:8 th grade EDP presentations in ELA classes. (Power Point at: WMS-Counseling.portage.site.eboard.com.
Advertisements

LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 5, 2014|3:00PM -5:00PM | ROOM 1E-113.
Brittany Dinsmore. Contact Information Conference time 9:05 – 9:53 Conference time 2:32-3:20 (940) I ask that you please.
April 2-4, 2014 – Saratoga Springs, NY Corporate Learning LAB & Symposium Set #1 Slides O M O C s ?
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
Welcome to Quark Net 2011 Wayne State University Physics Department.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
The Non-Flare Temperature and Emission Measure Observed by RHESSI J.McTiernan (SSL/UCB) J.Klimchuk (NRL)
RHESSI/GOES Observations of the Non-flaring Sun from 2002 to J. McTiernan SSL/UCB.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
1 Student Hands On Training I (2009) Boulder, Colorado June 10 – 13, 2009 Boulder, Colorado June 10 – 13, 2009 Welcome.
Chem 122 Molecular Spectroscopy Spring 2008 Professor Ronald Cohen GSI Drew Rollins.
R25 Webviewer Training. Creating a User Account When you go to the R25 Facility Request Form,R25 Facility Request Form this is the screen that will appear.
Annual Kellogg Marketing Competition 2006 It’s showtime... are you ready? Platinum Sponsor: Gold Sponsor:
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC Welcome and Logistics.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
New Mexico Space Grant Consortium Student Launch Program Provide annual access to space for student experiments from Spaceport America.
Density Data Gap Filling Marine Geospatial Ecology Lab Duke University November 14 – 16, 2012 Marine Mammal Density Data Gap Assessments and Update for.
LSU 05/02/2006Launch Trip1 The LaACES Launch Trip Ballooning Unit, Lecture 6.
Comet Impact: July 4, 2005 Impact Velocity: 23,000 mph Spacecraft Size: Flyby spacecraft - nearly as large as a Volkswagen Beetle automobile. Impactor.
Nova Labs - RhinoHawk Introduction Meeting March 20 th, 2014.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
1 Welcome to B.Ed 3 Students as Developing Professionals.
TRAINING SESSION 3 Tuesday, October 16 Basecamp – Cal Workback Schedules - Odona.
DMS Systems Design Review 3
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
At A Glance VOLT is a freeware, platform independent tool set that coordinates cross-mission observation planning and scheduling among one or more space.
FAFSA Collective Impact Initiative Professional Learning Community January 13, 2015.
Rachel Weintraub Public Affairs Officer & TV Producer NASA Goddard Space Flight Center More information:
Page 1 April 1, 2003 Langley Research Center Contractor Forum_040103_Final.ppt LaRC Core Financial Project Contractor Forum Yvonne Dellapenta LaRC Core.
Please make a nametag, get hand-outs, and check the sign-in sheet. Aloha! Welcome to the Workshop John McLaughlin NOAA Office of Education July 2008.
Kim Tolbert The Catholic University of America and Goddard Space Flight Center August 22-23, Fermi Solar Data Analysis Workshop at GSFC
Second International Review Meeting Integrated Assessment of Trade-Related Policies and Biological Diversity in the Agricultural Sector Geneva, 1-3 July.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) May 14, 2009.
The Swiss Society of Systems Engineering (SSSE) – A Chapter of INCOSE Information and news February 2012.
To View This Presentation –You can use the down or up arrow keys to move through the pages. –Now, click “Slide Show” on your top menu. –and then “View.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting July 13, 2005.
OOI CyberInfrastructure Workshop: Ocean Observation Programs Preparation Phone Meeting May 5, 2008 Alan Chave, Michael Meisinger OOI CI System Engineering.
Studies on the 2002 July 23 Flare with RHESSI Ayumi ASAI Solar Seminar, 2003 June 2.
WLCG Collaboration Workshop 7 – 9 July, Imperial College, London In Collaboration With GridPP Workshop Outline, Registration, Accommodation, Social Events.
Welcome WRF Verification Toolkit Workshop February 2007.
Hazardous Weather Forecasts and Warnings Overview: Forecast Division Jack Kain (NSSL) February 25–27, 2015 National Weather Center Norman, Oklahoma.
MHSA Technical Assistance and Planning Update CMHDA All Directors Meeting January 13, 2005.
2014 Aquarius / SACD Science Team Meeting Agenda and Objectives Summarize the completion of NASA’s Aquarius 3-year prime salinity measurement mission (November.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
Welcome! Course Development Camp Session II July 16 July July
Page 1 EEE 802 IEEE 802 November 2015 Plenary doc:802 EC-15/091r2 Report Executive Secretary Agenda Items November-2015-plenary Jon Rosdahl IEEE 802 Executive.
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
RHESSI Observation of Atmospheric Gamma Rays from Impact of Solar Energetic Particles on 21 April 2002.
Carolina Environmental Program At UNC 2003 Models-3 Workshop Status of the CMAS Center Bob Imhoff, CMAS Director.
Class 9_1 Today: More modeling work session Extension: Computer model due as a HW assignment on Tuesday, March 11.
Academic Outreach Project Status Report and Project Approvals OHT Board of Stewards Cambridge--1Oct10.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Navigation and Ancillary Information Facility NIF Welcome to the SPICE Tutorials March 2010.
GOES Program Review Satellite Direct Readout Conference for the Americas Miami, Florida December 9, 2002 Gerald Dittberner Advanced Systems Planning.
Solar X-ray Imager (SXI) Current and Future Requirements 22 May 2001 Steve Hill Solar Causes and Effects... Operational Requirements Improvements for GOES-R+
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
STEREO Science Center SWG – November 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
January 2009Edward Johnson1 NOAA SAB Working Group and NWS Information Service Changes Edward Johnson, Director, Strategic Planning & Policy Office National.
SAY (Do Not Read) the COLOR of Each Word Below: Today is National “Baked Alaska” Day Today’s Agenda 1.Web Site, Return Binders; 2.Light or Sound Videos;
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
GOES-R Launch Guest Ops
Planetary Science E/PO Community Tag-Up February 10, 2011
agenda Introductions Program Overview Preparation for Residency
School Community Council
Presentation transcript:

Berkeley HEDAW

HESSI Data Analysis Workshop (HEDAW) Welcome to Berkeley Logistics - McTiernan

Berkeley HEDAW HESSI Status –Completed all environmental tests at JPL –Shipped to Vandenberg (VAFB) on Jan. 12 –Red Team review held on Jan. 30 –Currently on hold pending fix to Pegasus launch vehicle following anomaly with HETE launch last November Steps to launch –Red Team report –Goddard Mission Readiness Review –HQ approval –Integrate with Pegasus at VAFB –Ferry from VAFB to Kennedy Space Center on L1011 –Launch date TBD until Pegasus problem is resolved

HESSI at JPL

HESSI In Transit Dave PankowPaul Turin

HESSI at VAFB

Berkeley HEDAW Objectives of the HEDAWs –Maximize HESSI scientific return –Obtain help in analyzing HESSI observations –Teach you how to use the existing HESSI data analysis software –Obtain your feedback on HESSI data analysis plans

Berkeley HEDAW Ground rules –There are no ground rules –All HESSI data will be on line within ~hours of receipt at the Berkeley SOC –All HESSI software is available on SSW –There are no restrictions on who can work on what We have a HESSI Bulletin Board Please enter your HESSI research areas here so that we know what you are doing and other people working an similar topics can collaborate.

Berkeley HEDAW Agenda –Wednesday, Feb. 28 Morning - Overview, installation, GUI Afternoon - Imaging –Thursday, March 1 Morning - Spectroscopy Afternoon - Ancillary data, HEDC, Objects –Friday, March 2 Morning - Hands on, tutorials, discussions –TBD topics as requested Afternoon – Science seminars

Berkeley HEDAW Agenda Space Sciences Lab. Addition, Conference Room Wednesday, February 28, :00 am AllRegistration & setup 8:30Lin / DennisWelcome, logistics, Agenda 8:45HurfordSoftware overview 9:00CsillaghyInstallation, data-base, objects 9:30McTiernanQuicklook, light curves 10:00TolbertGraphical User Interface 10:30All - assignmentPlot light curve of specified flare in data base 12 noonLunch 1:30 pmHurfordImaging – issues & theory 2:15SchmahlImaging in practice & MEM 2:40KruckerCLEAN 2:50AschwandenForward Fitting 3:00All - assignmentProduce images for specified flare using 3 different methods 4:45AllDiscussion 5:00Reception

Berkeley HEDAW Agenda Space Sciences Lab. Addition, Conference Room Thursday, March 1, :30 amAllSet up & hands on 9:00SmithSpectroscopy - theory 9:45SchwartzSpectroscopy in practice 10:15DennisNuclear de-excitation gamma-ray line code 10:30All – assignmentObtain spectrum for specified flare in the data base 12 noonLunch 1:30 pmZarroAncillary data – access & integration 2:30MetcalfImage reconstruction using Pixons 3:00CsillaghyObject oriented IDL code 3:30All - assignmentOverlay HESSI image onto an MDI or H-alpha image 4:45AllDiscussion 5:00Adjourn 7:00AllDinner at a local restaurant – near Pacific East

Berkeley HEDAW Agenda Space Sciences Lab. Addition, Conference Room Friday, March 2, :00 amAllHands on, tutorials, discussions, TBD topics as requested 12 noonLunch 1:30 pmBenzHESSI Experimental Data Center (HEDC) in Zurich 1:45FernandesRecent Observations with the Brazilian Solar Spectroscope (BSS) 2:00YanAnalysis of the NOAA9077 Flare Events in July :15VaradyA New Hybrid Code - Modeling the Response of Dense Solar Atmospheric Layers to the Particle Beam Bombardment 2:30AllHands on 5:00Adjourn