FAA AAS Federal Aviation Administration Advanced Automation System Designed to replace aging equipment from ‘60s and ‘70s Also consolidate ~200 tracons.

Slides:



Advertisements
Similar presentations
Continuing Education Registrations Automated!. Presentation Outline History – Where We Were (Michael) Present – Where We Are Now (Dave) Present – What.
Advertisements

Database Woes Plague Homeland Security and Law Enforcement.
Copyright © 2005 EFT Network, Inc. All Rights Reserved. Automated Recurring Payments Flexible Payment Solution.
Case Study: Business Continuity Planning for Site- Level Disaster Kimberley A. Pyles Northrop Grumman Corporation
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
CS 325: Software Engineering January 13, 2015 Introduction Defining Software Engineering SWE vs. CS Software Life-Cycle Software Processes Waterfall Process.
Office of Procurement February 2014 SPCC Online Reconciliation(OLR)
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
DPH eHealth Projects Status Update September 2008 Vanessa Kapral, PHIN IT Manager Nancy Barrett, PHIN Coordinator.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
System Analysis and Design (SAD )
Discovering Computers Fundamentals, 2011 Edition Living in a Digital World.
Lesson-12 Information System Development-2
Graduate System for Management of Admissions, Alumni & Records Tracking (Grad SMAART) January 8, 2007 Office of Graduate Studies.
“Software's Chronic Crisis” by W. Wayt Gibbs
1 CMSC 132: Object-Oriented Programming II Software Development I Department of Computer Science University of Maryland, College Park.
Copyright © 2002 Pearson Education, Inc.
Integrated Practice Management Systems. Learning Objectives After reading this chapter the reader should be able to: Document the workflow in a medical.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse 2.
Chapter 6– Artifacts of the process
Systems Analysis and Design: The Big Picture
OSP Transmittal Form September 15, Sponsored Programs Transmittal Form The Transmittal Form is: The document that MUST accompany every proposal.
PCT-SAFE and e-Services developments Webinar September 7/
Business Justification California Department of Social Services
Speaker Notes for employee discussions on how Canada Post is getting greener – August 2008 The Issues Canada Post needs to upgrade its current printer.
Chapter 1 Development Methodologies / SDLC
Lecture Outline 8 “OTHER SYSTEMS” 2. GEOGRAPHIC INFORMATION SYSTEMS (GIS) *MC p delivery manager may want to know the shortest distance a truck.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
. Traffic Flow Management System Benefits Flexibility for Future Growth: TFMS provides a modern software architecture to meet future growth and support.
University of Virginia Software Development Processes (CS340 John Knight 2005) 1 Software Development Processes.
Marisa Hudspeth Lead Archivist, Digital Program Rockefeller Archive Center Sibyl Schaefer Digital Initiatives Metadata Librarian University of Vermont.
Chapter 1 The Systems Development Environment Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Modern Software Development Nelson Padua-Perez Chau-Wen Tseng Department of Computer Science University of Maryland, College Park.
Web software. Two types of web software Browser software – used to search for and view websites. Web development software – used to create webpages/websites.
Customer Story Leggett & Platt’s Enterprise Procurement System.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
ECM and Shared Services Overview AITR Meeting April 23, 2009.
Federal Aviation Administration 0 Complex Integrated Avionics and System Safety June 9, Complex Integrated Avionic Systems and System Safety Presentation.
Types of transactions. What is it? An electronic payment is any kind of non-cash payment that doesn't involve a paper check. Methods include credit cars,
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
How does it work? Explain the process... Is a subset of an e-commerce transaction to include electronic payment for buying and selling goods or services.
Data Communications and Networks Chapter 9 – Distributed Systems ICT-BVF8.1- Data Communications and Network Trainer: Dr. Abbes Sebihi.
 Many models have been proposed to deal with the problems of defining activities and associating them with each other  The first model proposed was the.
TAXCO BUSINESS SERVICES INC. Division of Des-Dawn Corporation BOOKKEEPING | PAYROLL | TAX FILING | TAX PLANNING | CONSULTING INTRODUCING TAXCO BILL PAY.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Network Virtualization
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
1 Chapter 2 SW Process Models. 2 Objectives  Understand various process models  Understand the pros and cons of each model  Evaluate the applicability.
1 EIT 2.2 Is your company missing out on the cost-savings opportunities offered by data center consolidations? Andy Abbas Co-Founder and Vice President.
Electronic Case Management System – Georgian Experience Dr. Kontantine Kublashvili.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Written by: Harry Goldstein Published: IEEE Spectrum, September
Chapter 6: Database Project Management
CS 325: Software Engineering
Chapter 2 SW Process Models
Chapter 2: Software Process Models
IT Systems Analysis & Design
Election System Modernization
Software Development Process
Automated Fingerprint Identification System upgrade project
SOFTWARE LIFE-CYCLES Beyond the Waterfall.
Chapter 2: Software Process Models
Green Government in New York City
Laila Alawi Travis Lytle Vincent Gould Lauren McAdoo
System Development Methods
Closeout Certification Request May 23, 2019
Presentation transcript:

FAA AAS Federal Aviation Administration Advanced Automation System Designed to replace aging equipment from ‘60s and ‘70s Also consolidate ~200 tracons into ~20 en- route centers , cost billions of $ Some parts of new equipment (controller workstations) used, but system as a whole failed Consolidation idea abandoned

FAA AAS Requirements Distributed system % availability (3 sec/year downtime) No paper (electronic flight slips) New hardware New software and decision support

FAA AAS Problems Design contest IBM vs. Hughes – 1983 to 1988 – Detailed design of software but no coding – Voluminous documentation Implementation by IBM – Many levels of bureaucratic oversight by FAA – Changing requirements, but not what controllers wanted

FAA AAS Alternatives Modern display system + tracking software at High Desert Tracon – Needed to track fast military aircraft – Separate project funded by DoD – Open system, COTS equipment (Sun), evolutionary progress of components PC-based display developed in secret by FAA engineers

FBI VCF Federal Bureau of Investigations Virtual Case file 9/11 – FBI failed to “connect the dots” and obtain a full picture – Agents could not correlate data from different sources and investigations – Work processes are paper-based Need to replace obsolete Automated Case Support system – And consolidate many other databases and applications Actually started in 2000, accelerated after 9/11 Cancelled in Apr 2005 after costing $170M

FBI VCF Plan Replace essentially all diverse FBI IT infrastructure 800-page requirement document – Specifies design details like web-page layouts rather than what the system should do Aggressive deadlines but no milestones or detailed schedule Use a “flash cutover” – log off old system on Friday and into new system on Monday

FBI VCF Problems Lack of overall encompassing architecture Many change requests once agents saw prototypes (using spiral model) Resulting schedule slips

FBI VCF Replacement: Sentinel 6 years development, ~$440M In operation since July 2012 Success credited to shift from waterfall to agile in 2010 Also use significant off-the-shelf products

USCIS ELIS US Citizenship and Immigration Services Electronic Immigration System 8 M applications a year, all paper, requiring sending forms between offices Plan: computerize 95 forms and pay 40 fees online by 2013, cost of 500 M$ 2015 status: 1 form and 1 fee are working, cost 1.7 B$ – Application to renew or replace lost green card – 2 other forms were pulled due to problems Projected completion 2019, cost 3.5 B$

USCIS ELIS Problems 2008 contract to IBM using waterfall Requirements complete only in 2011 Takes up to 150 clicks to review an application – Navigate menus, open documents, etc. – Test: complete 0.86 cases/hour, compared with 2.16 with paper forms Integration of 29 commercial software products 2013: switch to multiple vendors, more agile – But 4-month work cycle 2015: switch to cloud platform