Report from balancing workshop Lesley Queripel 1 February 2007.

Slides:



Advertisements
Similar presentations
How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
Advertisements

Common FUI Portal FUI IG Meeting Ofgem, 30 th September 2011.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
2 nd Stakeholder Group Meeting 14 November 2006 France-UK-Ireland Electricity REM Stakeholder Participation David Halldearn – Director, European Affairs.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
Draft document – Work in progress
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Towards Regional Independent Operators – a main driver for successful market integration.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
EG pfa-sb Athen_November2005.ppt GIE Annual Conference The View of the Users of Gas Infrastructures Presented by Dieter Pfaff E.ON Ruhrgas AG Chairman.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
Cross Border Balancing - 2Hr Product NGET and RTE Paper.
FUI Stakeholder Group 4 th July 2008 Congestion Management.
FUI Stakeholder Group 3rd December 2008 Congestion Management project.
Energie braucht Impulse Immediate Horizontal Wind Energy Exchange between TSOs in Germany since September 2004 Practical Experiences EWEC 2006, 28 February.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
3rd IG Meeting – Region South-South East 9th October 2007, Maribor, Slovenia.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Implementation progress – second stage Olaf Islei European Strategy and Environment.
SAWG Update to WMS March 4 th, 2015 Brandon Whittle.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Bonn Workshops 8 and 9 Feb Gas Regional Initiative North West Region Balancing workstream Workstream leader: Cemil Altin (Ofgem)
Implementation progress – second stage Transmission Transparency Workshop London, 14 November 2008.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Terms and Conditions Review 2011
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
SG meeting FR/UK/IR region 14 June 2007 Congestion management
Gas balancing – where next
Transparency & Services
Ofgem presentation to Gas Transmission Workstream
Presentation transcript:

Report from balancing workshop Lesley Queripel 1 February 2007

© 2004 E.ON19 December 2015, E.ON UK, Page 2 Summary of meeting  Meeting chaired by David Halldearn  Reported on the congestion management workshop  Intraday is to be dealt with as part of CM workstream  TSOs presented two models for balancing (IG2-3)  High level, conceptual models - detail not fleshed out at this stage  Attempting to reflect the different balancing systems in GB and France

© 2004 E.ON19 December 2015, E.ON UK, Page 3 Model 1  Reserve provider contracts directly with the neighbouring TSO

© 2004 E.ON19 December 2015, E.ON UK, Page 4 Model 2  Reserve provider contracts directly with its host TSO  TSO contracts with the neighbouring TSO

© 2004 E.ON19 December 2015, E.ON UK, Page 5 Summary of discussions  Model 1  More complex model  Host TSO would still need to be notified if RP in its area provided reserve to neighbouring TSO  May be more appropriate to a well developed intraday market  Model 2  Simpler model to operate  Some concerns from market participants about transparency  Debate on where value should fall where price differences between TSO areas

© 2004 E.ON19 December 2015, E.ON UK, Page 6 Way forward  Model 2 generally preferred, if sufficient transparency  Issue of where economic benefit falls needs to be considered  TSOs asked to develop model 2 further  Timescales  How it could work  Impact on market participants  A number of stakeholders offered to input to the process  RWE Trading, E.ON UK, EdF Trading, Elexon  Paper to be produced by mid-March  Next meeting scheduled for 23 March 2007

Report from balancing workshop Lesley Queripel 1 February 2007