Planning for Operations SKA Engineering Meeting 2015 Prof. Gary Davis 10 th November 2015.

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Advertisements

Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Robert-Jan Smits Director, DG Research, European Commission Towards a European Strategy for Research Infrastructures Opportunities for the Arctic region.
Table of contents 1 Manual of Operational Procedures (MOP) 2
SADC HPC Workshop, 2 Dec 2013, Cape Town
Implementation Council Meeting Structure and Resources Background: The Implementation Council (Council) roles and responsibilities are described in the.
National Report - Canada - Sustaining Arctic Observing Networks Board Meeting – Potsdam, Germany October 2012.
RAMIRI2 Prague 2012 Project management and the RI Life Cycle.
CSIRO ASKAP Science Data Archive (CASDA) Project Kick-Off IM&T AND CASS Dan Miller| Project Manager 17 July 2014.
VISTA as seen by the Prime Contractor Adrian Russell.
SOFIA Stratospheric Observatory for Infrared Astronomy DCS PDR at RIT3/7/2000 DCS Preliminary Design Review Sean C. Casey USRA Senior Scientist Lead Scientist.
Research Infrastructures The Research Infrastructures in FP7.
Update from the CFI: Meeting of the Council of Chairs of Canadian Earth Science Departments Ottawa (ON), October
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
The role of Healthwatch England. 2 Championing people’s voices The White Paper Liberating the NHS says: “We will strengthen the collective voice of patients.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 | CSIRO ASKAP Science Data Archive (CASDA) – Stage 0 Project Intent Statement Confirm the necessary requirements, use cases, workflows, business processes,
Welcome and Introductions Shulah Allan. Integration update Peter Gabbitas.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Establishing the Education and Skills Authority: A Strategy for Taking Forward the Change.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
ExOB Discussions on Development Test Center WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006.
ATUC meeting Director’s Report Brian Boyle November 2007.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
John Womersley PPD staff meeting John Womersley 6 February 2007.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
North East Lincolnshire Council delivering change through partnership ( Physical Regeneration, Property and Technical Services Partnership) Planning in.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
E-Science Research Councils awarded e-Science funds ” science increasingly done through distributed global collaborations enabled by the Internet, using.
DRAFT EDMC Procedural Directives NOAA Environmental Data Management Committee 12/3/2015 1
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
SKA: Update on SKA Governance Simon Berry, Director Policy Development 9 th November 2015.
Assembly, Integration & Verification 2015 SKA Engineering Meeting Richard Lord 11 November 2015.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
NCP training session 30 October 2002 Integrated information system on RTD in Europe Gwenda Jeffreys-Jones, DG RTD European Commission.
ITSS Conference 2007 ICT Strategy Programme Update almost there… Paul Jeffreys
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting November 8, 2005?? Item No. xx Supp. Meeting Date:
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
DEVELOPMENT OF A WHITE PAPER ON CORRECTIONAL SERVICES Ministry of Correctional Services.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
Asset Management and Corporate Landlord Presentation to Overview and Scrutiny Committee 7 July 2010 John Sadler Head of Estates & Asset Management.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Large Synoptic Survey Telescope
Ian Bird GDB Meeting CERN 9 September 2003
SKA Regional Centre Coordination Group (SRCCG)
ASTERICS Kick-Off Meeting: SKA links and interaction
The RSP Archive System RSP Archive Concept Review 28 September 2017
PM view of SAFe SAFe Construction Planning Workshop A J Casson
Director’s Update AT Users’ Committee -- November 2016
DevInfo Claes Johansson
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
A Draft Funding Model for the SKA
EVLA Operations Jim Ulvestad
Operations Perspective
Preliminary Project Execution Plan
CONVENTION ESTABLISHING THE SQUARE KILOMETRE ARRAY OBSERVATORY
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Lisa Harvey-Smith Institute of Astronomy The University of Sydney
Presentation transcript:

Planning for Operations SKA Engineering Meeting 2015 Prof. Gary Davis 10 th November 2015

The Operations Planning Team Gary Davis Director Corrie Taljaard Engineering Operations Antonio Chrysostomou Science Operations

The Operations Planning Team Director General Director of Ops Planning Head of Project team

Previous work The big issues Current work –Operations concept –Operations plan –Data flow Future work Outline

Concept of Operations Operations Working Group (chaired by Douglas Bock) Rev 02 issued May 2015 Previous Work

Operational Principles Previous Work Approved 25 th July 2013 Amended 29 th October 2013

Operational Principles 3.The purpose of the SKA Observatory will be to enable scientists to pursue world-leading scientific programmes, to organise and conduct improvements and upgrades of the SKA telescopes in order to provide and maintain facilities that are at the forefront of science and technology, and to ensure the protection of the SKA sites for the SKA and future radio telescopes. Previous Work

Operational Principles 6.The expected lifetime of the SKA Observatory is 50 years. Previous Work

Access Principles based on scientific merit single time-allocation process proportional to contribution limited access for non-member states data products to be made globally available after a suitable proprietary period …policy to be defined in detail Previous Work

Late start to operations planning Structure of the organisation  Hosting arrangements in AUS/RSA Role of Regional Centres  Challenge of “Big Data”  Reliability & maintenance  Power Operations budget  Precursors: integration of MeerKAT and operational experience The Big Issues

Operational Model support both large, multi-year programmes (KSPs) and conventional PI projects 24-hour operation; service observing; automated, flexible observing queue “observing factory” ToOs and transients; subarrays and commensality high level of user support on-the-fly maintenance and repair RFI constraints; minimal staff on site Current Work

Logistics Engineering availability requirement: >95% capacity for >90% of the time modelling of failure modes and reliability to inform maintenance plan and staffing requirements RAM report and FMECA reports are CDR deliverables two new draft documents to be issued imminently: –Support Concept –RAM Allocations Current Work RAM/ILS Modelling and Maintenance Planning Wed 13:30

Operations Concept Document to describe operational model to specify additional Level-1 requirements from the operations perspective draft to be issued soon for comment – input from design consortia welcome Operations Concept Review planned Q approval of new requirements through ECP process Current Work

Operations Plan –Contents: Operational model Structure of the organisation  Staffing Budget  –For presentation to the Board along with Construction Proposal (Jan 2018) Current Work

Unique challenge globally-distributed project return on investment no perfect solution Status discussed at Board in July going to Board next week for approval Context steady-state operations SKA1 designed, built, commissioned and fully operational (2023 on current planning) assume IGO is in place Structure of the Organisation

Some relevant principles: The SKA is one observatory and must present a single, seamless interface to the user community. –the “one observatory” model The structure should be designed to optimise the operation. Duplication of staff should be minimised. Common functions should be based at the GHQ. CSIRO and SKA-SA will have built up experience of operating telescopes on the two sites; SKA must retain access to this experience. Structure of the Organisation

SKA Observatory Corporate Functions Observatory Operations Development Programme

Structure of the Organisation SKA Observatory Corporate Functions Observatory Operations Development Programme SKAO AUS Office GHQSKAO RSA Office

Structure of the Organisation SKA Observatory Corporate Functions Observatory Operations Development Programme SKAO AUS Office GHQSKAO RSA Office AUS Operator RSA Operator Site & engineering operations Science operations

Structure of the Organisation SKA Observatory Corporate Functions Observatory Operations Development Programme SKAO AUS Office GHQSKAO RSA Office AUS Operator RSA Operator Science Processing Centre Science Processing Centre

Structure of the Organisation SKA Observatory Corporate Functions Observatory Operations Development Programme Data centres Development centres SKAO AUS Office GHQSKAO RSA Office AUS Operator RSA Operator Science Processing Centre Science Processing Centre

Structure of the Organisation Non-host Members SKA Observatory Corporate Functions Observatory Operations Development Programme Data centres Development centres SKA Council SKAO AUS Office GHQSKAO RSA Office AUS Operator AUSRSA Operator UK Science Processing Centre Science Processing Centre

Structure of the Organisation Non-host Members SKA Observatory Corporate Functions Observatory Operations Development Programme Data centres Development centres SKA Council SKAO AUS Office GHQSKAO RSA Office AUS Operator AUS Site Entity AUSRSA Site Entity RSA Operator UK Science Processing Centre Science Processing Centre

Structure of the Organisation Non-host Members SKA Observatory Corporate Functions Observatory Operations Development Programme Data centres Development centres SKA Council SKAO AUS Office GHQSKAO RSA Office AUS Operator AUS Site Entity AUSRSA Site Entity RSA Operator UK Site Entity Science Processing Centre Science Processing Centre

Structure of the Organisation Non-host Members SKA Observatory Corporate Functions Observatory Operations Development Programme Data centres Development centres SKA Council SKAO AUS Office GHQSKAO RSA Office AUS Operator AUS Site Entity AUSRSA Site Entity RSA Operator UK Site Entity Science Processing Centre Science Processing Centre NOT YET APPROVED

Strategy bottom-up approach opex estimate was a PDR deliverable from consortia designs should minimise whole-life costs additional costs to be estimated PDR-level estimate to be presented to Board in April 2016 updates to every subsequent Board meeting final, CDR-level estimate will be presented to Board for approval along with Construction Proposal (January 2018) Budget team me, Douglas Bock (AUS), Adrian Tiplady (RSA) Operations Budget

Operational Principles 20.The SKA Observatory will calibrate SKA data and make science-ready data and ancillary products available to the users. 21.The SKA Observatory will provide an archive with a data management system to support data- intensive astronomy. 22.The SKA Observatory will provide user support and tools to enable exploitation of SKA data. Current Work

Data Flow construction project capped at €650M scope of work includes generation and storage of data products in AUS/RSA it does not include delivery of data to users or further processing essential for full science exploitation of the SKA Data Flow Advisory Panel set up by Board in July will report back to Board in April 2016 ToR distributed to consortia Current Work

Panel members: Current Work Australia Sarah Pearce South Africa Jasper Horrell Peter QuinnRuss Taylor CanadaChris LokenUKPaul Alexander ChinaMeng Zhao SKA Office Gary Davis IndiaNiruj MohanMiles Deegan ItalySergio Molinari External Ian Bird Netherlands & SwedenMichael WiseJack Dongarra New ZealandMelanie Johnston-HollittBrian Glendenning

Operations & Access Working Group to develop input to IGO negotiations led by Sarah Pearce, CSIRO Science commissioning Early Science Best practice Future Work 2016