Accelerator/WP 11.5.3 High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY www.europeanspallationsource.se April 21, 2015.

Slides:



Advertisements
Similar presentations
Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
Advertisements

Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Transition from Q1- 8th to Q1- 9th edition
Project Management Framework May 2010 Ciaran Whyte Risk Administrator Planning & Strategic Projects Unit.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Management System
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
Quality Assurance/Quality Control Policy
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
Photocopies Occasionally need uncontrolled copies
4. Quality Management System (QMS)
RF Cavity / Coupling Coil Module
Introduction to ISO New and modified requirements.
Software Quality Assurance Activities
From Research Prototype to Production
Visit us at E mail: Tele:
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
WP : HIGH-BETA CAVITY DELIVERY A Wheelhouse ASTeC, STFC Daresbury Laboratory ESS SRF Elliptical Cavities Kick-Off Meeting CEA Saclay 15 th December.
HIGH-BETA CAVITY DELIVERY P McIntosh ASTeC, STFC Daresbury Laboratory ESS Technical Advisory Committee Lund 1 – 2 April 2015.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Neutron Chopper Technologies Work Package
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Accelerator/WP High-Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April, 2016.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
LCLS-II Prototype Cryomodule FDR J. Blowers, C.M. Ginsburg, T. Peterson, R. Stanek, J. Theilacker (FNAL) 21 – 22 January 2015 Homework Responses.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
WP : HIGH-BETA CAVITY DELIVERY A Wheelhouse ASTeC, STFC Daresbury Laboratory ESS SRF Elliptical Cavities Kick-Off Meeting CEA Saclay 23 rd June 2015.
Developing the Collaboration P McIntosh STFC Daresbury Laboratory.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
WP : High-Beta Cavity Delivery
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
WP High Beta Cavities Delivery
Workplace Projects.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
ESS cavity procurement via in-kind contributions
FCC R&D WP5 Cavity Fabrication Status and Plans Dec-16
High-Beta cavity STATUS at DAREsbury laboratory
Crab Cavities Contribution from the U.S.
Mark Pendleton – STFC Daresbury Laboratory
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Test stand preparation and EMR "live" data summaries
ESS RF Development at Uppsala University
Horizontal Tests in a Vertical Cryostat
Quality Management Systems – Requirements
Daresbury ESS In-Kind Contributions
Overall time schedule of SRF activities
CNRS contribution to ESS – 01/02/17
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
SNS-PPU upgrades the existing accelerator structure
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015

WP Outline Schedule Technical Performance Selected Technologies Integration & Verification Organisation Structure Budget & Cost Book Major Procurement Risks Next Steps Summary 2

Schedule 3

4 MilestoneDescriptionDate 1Infrastructure preparation start4/5/15 2Infrastructure preparation finish13/3/17 3Niobium procurement start29/8/16 4Niobium procurement finish16/7/18 5Cavity testing procedure training start4/1/16 6Cavity testing procedure training finish26/2/18 7Cavity procurement start18/8/17 8Cavity procurement finish6/3/20 9Cavity testing start3/8/18 10Cavity testing finish25/11/20 11Cavity shipment start3/10/18 12Cavity shipment finish4/12/20 HBCM Assembly at CEA start5/4/19 HBCM Assembly at CEA finish11/11/21

WP Technical Performances 5  84 (+ 4 spare) high-β dressed elliptical cavities capable of achieving 22.9 MV/m at 704 MHz, with a Q o better than 5 x 10 9 Niobium procurement: STFC to procure the high RRR Niobium for the high-β elliptical dressed cavities in agreement with the SRF collaboration for the ESS linac. Cavity fabrication of the 84 (+4 spare) high-β elliptical dressed cavity in industry including: – Cavity fabrication. – Chemical processing. – Heat treatment. – Vacuum processing. – High pressure rinsing. – Field flatness and frequency tuning. – Assembly of RF antenna and isolation valve in cleanroom. – Shipment of dressed cavities to STFC. Procedure Qualification and Training: – Documentation for all the processes and procedures to be defined and agreed – Training on the processes to be performed and monitored – Process trials to be performed – Cavity preparation and final test QC documentation prepared.

WP Technical Performances 6 Cavity Qualification: – Installation of cavities onto vertical insert – Installation into VTF cryostat – Qualification in a vertical test facility of cavities at 2K to the required gradients of 22.9MV/m for the high-β cavities. – Assessment and provision of test data Test data to be reviewed and approved – Removal of cavities from VTF Cryostat and vertical insert. – Complete final sealing, leak checks and QC processes. – Sealing and packing of cavities – Arrangement for delivery of cavities to cryomodule integration team (CEA- Saclay). – Maintenance of the equipment Cavity Rework: – HPR of cavities – Repeat qualification Preparation and shipping of cavities to cryomodule integration site: – STFC to design and procure shipping fixtures for SRF dressed cavities for transport from industry. – STFC to transport SRF cavities from STFC to the cryomodule integration site. – STFC to support transport cost in accordance with ESS transportation policy.

WP Selected Technologies 7 Niobium procurement Specifications for the Nb material need to be agreed with ESS and CEA-Saclay Cavity fabrication Cavity drawings, specifications and processes required. To be agreed with ESS and CEA-Saclay, also in conjunction with INFN Vendor qualification to be performed Preparation of infrastructure Vertical test facility to be upgraded Larger diameter cryostat capable of holding 3 dressed cavities RF system for 704 MHz Cavity qualification and testing Procedure qualification and training In house procedures to be developed Staff to be trained in processes Trials to be performed

WP Selected Technologies 8 Quality Assurance STFC Technology Department at Daresbury Laboratory operates a quality system that meets the requirements of ISO 9001:2008. The quality system defines how a project will be coordinated and documented. The management of a project is based on an agreed Project Specification and a series of reviews at key stages in the work. The detailed implementation of the Quality Management system is described in standardised group procedures, processes and local instructions. These provide the core of the Quality Management System and provide the detail required to operate the system. The processes and procedures are followed by STFC staff undertaking specified activities. The work undertaken will be defined under an agreed series of bespoke processes and procedures based on existing Daresbury Laboratory vacuum and cleanroom procedures, in association with procedures developed by ESS/CEA-Saclay. These procedures and processes would then be followed and tracked by the technicians assembling the equipment to ensure a repeatable, auditable standard is achieved. QUALITY MANAGEMENT SYSTEM – ISO 9001:2008

WP Integration and Verification 9 Drawings, specifications and procedures to be provided by ESS Timescales are defined to enable the procurement processes for the Nb material and cavities to formally commence Systems of work, procedures and processes will be defined in conjunction with CEA-Saclay and in conjunction with INFN Aim to learn from the work performed on the medium-β cavity Procedures will need to deal with cavity non-conformance issues Will have to understand the impact for the CM integration  A formal ESS/CEA/STFC/INFN coordination process is critical to ensure specifications/drawings/procedures are collectively agreed and utilised

WP Organization at Partner Lab 10 STFC ESS-IKC Project Board ESS/CEA Elliptical Cavity Collaboration Board Stakeholder planning Financial reporting Project planning (& current R,A,G status) Change Management Risk Register

WP Budget and cost-book Costs for 84 high-β cavities No spares factored in No rework costs included Costs based as of 31 st January 2013 No inflation factored in  Final costs will include appropriate indexed costs for staffing and hardware No contingency factored at present  Needs to be agreed on how this is to be managed  LHe will need to have a higher level  ESS to cover Nb material contingency UK funding commences 16/17  UK issue with availability of funds for 15/16 11

WP Major Procurements Niobium Material Scope:- – Specification – Vendor validation – Agreed delivery timescales – Quality and delivery monitoring Value - €7.4M (Cost as at 31 st January 2013) Timescales:- – Niobium procurement start: 29/8/16 – 4 month procurement process – Niobium procurement finishes: 16/7/18 Provisional Nb quotes received from Wah Chang, Tokyo Denkai & Ningxia: – Based upon drawings supplied by CEA Saclay – Inflation costs of Nb uncertain  Nb specification needs to be clarified by ESS to allow procurement to commence Prefer two suppliers for Nb – Minimise delivery timescales – Ensure timescales can be achieved – Minimise risk against other known external procurements for Nb over this period (e.g. SLAC – LCLS-II) 12

WP Major Procurements Cavity Fabrication Scope:- – Specification – Vendor qualification – Agreed delivery timescales – Quality and delivery monitoring Value - €10.6M (Cost as at 31 st January 2013) Timescales:- – Cavity fabrication start: 18/8/17 – 4 month procurement process – Cavity fabrication finishes: 6/3/20 Refined quotes obtained from RI and AES Discussions held with Zanon and MHI Processing requirements to be agreed  Finalised engineering drawings required from ESS  Cavity process requirements to be defined by ESS  ESS to provide tolerance requirements to aid HOM management 13

WP Top risks 14

Next Six Months STFC ESS Project Board to approve defined programme – April 2015 – UK contingency level to be defined and how it is to be centrally managed. Need to resolve 15/16 funding issue caused by expected UK funding timescales. UK-IKC Technical Annex to be defined and agreed Formal UK – IKC agreement to be agreed and approved: – Date: TBD NDA agreement to be set-up with CEA Saclay – Date: TBD – Commence discussions on refining requirements for the high-β cavity Integration of Vertical Test Facility – Design of systems – Commence procurement Continue on-going discussions with potential suppliers – Defining requirements 15

WP Summary STFC has developed a plan for the provision of the high-β elliptical cavities which meets the timescales for the ESS RFI schedule. A cost book has been developed and is under negotiation with ESS Infrastructure needs to be integrated to achieve the production requirements STFC needs to have strong coordination with ESS/CEA & INFN to ensure requirements and timescales are fully integrated: – Specifications, drawings, procedures, QA processes and project management integration is critical for successful delivery. 16