Facilities design. Main Topics Discrete vs. Continuous Flow and Repetitive Manufacturing Process vs. Product-focused designs and the other currently used.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

Flowlines: The prevailing layout for High Volume Manufacturing.
Process Selection and Facility Layout
Facility Design-Week6 Group Technology and Facility Layout
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
Analysis and Design of Asynchronous Transfer Lines as a series of G/G/m queues: Overview and Examples.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Process Selection and Facility Layout
Session Pooja patnaik.
Process Selection and Facility Layout
Operations Management Layout Strategy
Group Technology and Facility Layout
OPSM 301 Operations Management Class 3: Process selection Koç University Zeynep Aksin
Summarizing our current results with respect to the warehouse design and control problem Based on: Yoon, C. S. and Sharp, G., “A structured procedure for.
Process Selection and Capacity Planning
Chapter 10 – Facility Layout
Methods, Standards, and Work Design
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection Facilities Layout Line Balancing.
DOM 102 : Principles of Operations management
1 Chapter 5 Flow Lines Types Issues in Design and Operation Models of Asynchronous Lines –Infinite or Finite Buffers Models of Synchronous (Indexing) Lines.
Chapter 10 – Facility Layout
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Queueing Analysis of Production Systems (Factory Physics)
1  Types of production systems. 2 Factors Influencing Process Choices  Volume: Average quantity of the products produced in a manufacturing system –Low.
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Analysis and Design of Asynchronous Transfer Lines as a series of G/G/m queues.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
Closure. Course Outline For Systematic Layout Planning: Chpt 10 from your textbook and today’s lecture For Warehousing: Prof. Bartholdi’s electronic.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
FACILITIES LAYOUTS Facilities layout implies Layout design for equipment, machinery, & furnishings, production, support & personnel areas A layout is affected.
Analysis and Design of Asynchronous Transfer Lines as a series of G/G/m queues.
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
Algorithm A procedure described by a series of steps. Click here for Hint project or algorithm or load distance?
Work-in-process (WIP) Inventory resulting from transformation of raw materials, but not yet ready for sale to consumers. Click here for Hint finished goods.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Facilities design. Main Topics Process vs. Product-focused designs and the other currently used variations Technology selection and capacity planning.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
An introduction to Factory Physics
Cellular Layouts Cellular Production Group Technology
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
Flowlines: The prevailing layout for High Volume Manufacturing
Analysis and Design of Asynchronous Transfer Lines as a series of G/G/m queues: Overview and Examples.
organizational structure
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
FACILITY LAYOUT Facility layout means:
Chapter 6A Facility Layout 2.
Facilities Planning and Design Course code:
MANUFACTURING SYSTEMS
Facilities Planning and Design Course code:
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Departmental Planning
Using the queuing-theoretic approximations for the performance of “push” and “pull” production lines to address Design Problems.
Facilities Planning and Design Course code:
“Cellular Manufacturing”
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

Facilities design

Main Topics Discrete vs. Continuous Flow and Repetitive Manufacturing Process vs. Product-focused designs and the other currently used variations Designing Layouts –Systematic Layout Planning (SLP) for Process-focused layouts –Flow Patterns for Product-focused layouts (Assembly) Line Balancing Cell Formation (Warehousing and its design issues – in a sequel presentation)

Operation Process Chart Example for discrete part manufacturing (borrowed from Francis et. al.)

Discrete vs. Continuous Flow and Repetitive Manufacturing Systems (Figures borrowed from Heizer and Render)

A typical (logical) Organization of the Production Activity in Repetitive Manufacturing Raw Material & Comp. Inventory Finished Item Inventory S1,2 S1,1S1,n S2,1S2,2S2,m Assembly Line 1: Product Family 1 Assembly Line 2: Product Family 2 Fabrication (or Backend Operations) Dept. 1Dept. 2Dept. k S1,i S2,i Dept. j

Synchronous Transfer Lines: Examples (Pictures borrowed from Heragu)

Major Layout Types (borrowed from Francis et. al.)

Advantages and Limitations of the various layout types (borrowed from Francis et. al.)

Advantages and Limitations of the various layout types (cont. - borrowed from Francis et. al.)

Selecting an appropriate layout (borrowed from Francis et. al.)

The product-process matrix Jumbled flow (job Shop) Disconnected line flow (batch) Connected line flow (assembly Line) Continuous flow (chemical plants) Process type Production volume & mix Low volume, low standardi- zation Multiple products, low volume Few major products, high volume High volume, high standardization, commodities Commercial printer Heavy Equipment Auto assembly Sugar refinery Void

Cell formation in group technology: A clustering problem Partition the entire set of parts to be produced on the plant-floor into a set of part families, with parts in each family characterized by similar processing requirements, and therefore, supported by the same cell. Part-Machine Indicator Matrix

Clustering Algorithms for Cellular Manufacturing Row & Column Masking

Clustering Algorithms for Cellular Manufacturing: Similarity Coefficients - Motivation 1 1

Clustering Algorithms for Cellular Manufacturing: Similarity Coefficients - Definitions P(Mi) = set of parts supported by machine Mi |P(Mi)| = cardinality of P(Mi), i.e., the number of elements of this set SC(Mi,Mj) = |P(Mi)  P(Mj)| / |P(Mi)  P(Mj)| = |P(Mi)  P(Mj)| / (|P(Mi)|+|P(Mj)|-|P(Mi)  P(Mj)|) Notice that:0  SC(Mi,Mj)  1.0, and the closer this value is to 1.0 the greater the similarity among the part sets supported by machines Mi and Mj. By picking a desired threshold, one can cluster together all machines that have a similarity coefficient greater than or equal to this threshold.

Flow Patterns for Product-focused Layouts (borrowed from Francis et. al.)

Design of Process-based layouts Arrange spatially the facility departments in a way that facilitates the flow of parts through the facility by minimizing the material handling / traveling effort; observes additional practical constraints arising from, e.g., processing/operational requirements safety/health considerations aesthetics building features etc.

Prevailing Methodology: Systematic Layout Planning (SLP) Departments  Activities 1. Material Flows 2. Activity Relationships 3. REL Chart 4. REL Diagram 5. Space Requirements 6. Space REL Diagram 7. Space Availability 8. Layout Alternatives

Example on SLP Developed in class – c.f. your class notes!

Synchronous Transfer Lines: Examples (Pictures borrowed from Heragu)

Balancing Synchronous Transfer Lines Given: –a set of m tasks, each requiring a certain (nominal) processing time t_i, and –a set of precedence constraints regarding the execution of these m tasks, assign these tasks to a sequence of k workstations, in a way that –the total amount of work assigned to each workstation does not exceed a pre-defined cycle time c, (constraint I) –the precedence constraints are observed, (constraint II) –while the number of the employed workstations k is minimized. (objective) Remark: The problem is hard to solve optimally, and quite often it is addressed through heuristics.

Heuristics for Assembly Line Balancing Developed in class – c.f. your class notes!

Asynchronous Production Lines Each part moves to the next station upon finishing processing at its current station, provided that there is available buffering capacity at the next station, without coordinating its movement with other parts in the system. Some reasons for adopting an asynchronous operational mode: –Lack / High cost of synchronizing material handling equipment –(Highly) variable processing times at or among the different stations –Frequent equipment failures

Buffers, WIP and Congestion Typical quantities of interest: Times spent at different part of the system (“cycle” times) Material accumulated at different parts of the system (WIP) Estimates for these quantities can be obtained either through Queueing theory (G/G/1 models), or Simulation

The G/G/1 model TH Station Parameters: (m: number of machines) Production rate / Throughput: TH Mean effective processing time: t e St. deviation of effective processing time:  e Coefficient of variation (CV) of effective processing time: c e =  e / t e Machine utilization u = TH * t e (TH*t e / m) Coefficient of variation of inter-arrival times: c a Coefficient of variation of inter-departure times: c d Evaluating the key performance measures: CT q = [(c a 2 + c e 2 ) / 2 ]*[u / (1-u)] * t e [(c a 2 + c e 2 ) / 2 ]*[u  (2(m+1))-1 /(m (1-u))] * t e CT = CT q + t e WIP q = TH * CT q WIP = TH * CT = WIP q + u WIP q + m*u c d 2 = u 2 * c e 2 + (1-u 2 ) * c a 2 1+(1-u 2 )(c a 2 -1)+u 2 (c e 2 -1)/  m

Evaluating an entire Production Line TH Key observations: For a stable system, the average production rate of every station will be equal to TH. For every pair of stations, the inter-departure times of the first constitute the inter-arrival times of the second. Then, the entire line can be evaluated on a station by station basis, working from the first station to the last, and using the equations for the basic G/G/1 model.

Taking into consideration machine failures Definitions: Base machine processing time: t 0 Coefficient of variation for base processing time: c 0 =  0 / t 0 Mean time to failure: m f Mean time to repair: m r Coefficient of variation of repair times: c r =  r / m r Machine Availability A = m f / (m f + m r ) Then, t e = t 0 / A (or equivalently 1/t e = A * (1/t 0 ) )  e 2 = (  0 /A) 2 + (m r 2 +  r 2 )(1-A)(t 0 /A) c e 2 =  e 2 / t e 2 = c (1+c r 2 )A(1-A)m r /t 0

Example on the Analysis and Design of Asynchronous Production Lines through the presented G/G/m model Developed in class – c.f. your class notes!

Reading Assignment From your textbook: –Chapter 1: Section 1.9 –Chapter 10: Sections , 10.6 –Chapter 8: Section 8.10 –(for those of you interested to see something more, read also Sections 10.4, 10.5 and 10.7)