Phase II QS 627/727 Documentation-based Process Improvement.

Slides:



Advertisements
Similar presentations
Team Phase II Short Form - Fall 2004 Phase II Short Form “Statistical Process Control, Six Sigma, Improvement for Lean Systems" Assessment of the.
Advertisements

Course: e-Governance Project Lifecycle Day 1
QS 702 Summer 2004 Clark Halfrey, Larry Roman, Mark Chandler, Jim Bossert, Glenn Gee, Timothy Chow, Roger Newhouse, & Garret Kaess.
1 © 2006 Superfactory™. All Rights Reserved. Design for Lean and Six Sigma Superfactory Excellence Program™
ISO 9001 : 2000.
Failure Mode and Effect Analysis
Phase II Short Form Pencil Slat Cost Reduction Initiative Industrial Technologists' Toolkit For Technical Management QS 327 Team 2: Scott Sowders, Pam.
Supplier Development Kaizen Implementation Kit
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Assessment Overview: Orientation Tutorial Presentation 4 1. Explanation of this presentation,
Introduction to 6S.
INDUSTRIAL & SYSTEMS ENGINEERING
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Principles of Six Sigma
Management 11e John Schermerhorn
QS 726 – Quality Systems Organization and Implementation of a New Quality System using LSSQTT Fall 2006 Phase II.
Principles of Six Sigma
1 Chapter 10 Principles of Six Sigma. Key Idea Although we view quality improvement tools and techniques from the perspective of Six Sigma, it is important.
Lean Six Sigma Executive Introduction. Copyright OpenSourceSixSigma.com Competition Every morning in Africa, a gazelle wakes up; it knows it must run.
MANAGING INVENTORY, MRP AND JIT.  Inventory management is a system used to oversee the flow of products and services in and out of an organization. A.
Industrial Standards Framework and Energy Management Aimee McKane, Lawrence Berkeley National Laboratory.
ITTTM Short Form Tool 1 Tool 1 Short Form “Technical Foundations For Industry And technology” Topics 1. Background on the toolkit 2. Kaizen defined and.
How to Effectively Implement Set-up Reduction in Any Organization.
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
QS 702 Phase II: Encouraging the Integration of Technology Into Higher Education.
Chapter 1 Enterprise Wide View.
Staff Structure Support HCCA Special Interest Group New Regulations: A Strategy for Implementation Sharon Schmid Vice President, Compliance and.
Short Form Tool 13 ITTTM Tool #13 Short Form “Statistical Foundations For Data-based Improvement, Lean, Six Sigma Solutions” Topics 1. Focus and benefits.
Team 2 Portfolio Review Qs 327 Fall 2004 Dr. John Sinn.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
Software Project Management Introduction to Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Welcome to Lean Six Sigma Green Belt Training
Analyze Opportunity Part 1
Kanban/Pull System As Part of the Continuous Improvement Process at Whirlpool Corporation - Findlay.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Content Overview: Orientation Tutorial Presentation 2 1. Explanation of the presentation,
Short Form Tool 25 ITTTM Tool #25 Short Form “ISO and QS 9000 Maturing: Foundations For Quality Services, Auditing And Lean Improvements” Topics 1. ISO/QS.
Phase I & II Short Form Presented to : Dr. John Sinn Prepared by: Team One – QS 327 Due: October 19, 2005.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Designing, Controlling, and Improving Organizational Processes
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Office of Process Simplification May 20, 2009 Planning an Improvement Project.
Phase II QS 426/616 & 427/527 Prepared by: Aviation Security and Quality Team Summer 2005.
Copyright 2002 Prentice-Hall, Inc. 1.1 Modern Systems Analysis and Design Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 1 The Systems Development.
“Without the Cost of Waste …”
Project Management Yonsei University 2 nd Semester, 2012 Sanghyun Park.
Quality Management.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Introduction, Overview: Orientation Tutorial Presentation 1 1. Explanation of this presentation,
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Process Overview: Orientation Tutorial Presentation 3 1. Explanation of this presentation,
The Value Driven Approach
Niblock & Associates, LLC ©2010 Niblock & Associates, LLC Christian M. Paulsen 1.
Short Form Tool 19 ITTTM Tool #19 Short Form “Kaizen Documentation Foundations For Data Driven Process Variation, Waste Reduction, Lean, Six Sigma” Topics.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
1 Observation of best / better practices The followings are “Some” of the best/better practices observed in the plant tour; Systems- House Lean to evaluate.
Top lean six sigma consulting strategies for businesses Lean Six Sigma Manufacturing Consulting By: Group50.com.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
THE MANAGEMENT & CONTROL OF QUALITY, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma The Management & Control of Quality,
Product Lifecycle Management
UNDERSTANDING ISO 9001:2008.
Six-Sigma : DMAIC Cycle & Application
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
Chapter 7 Process Management.
Presentation transcript:

Phase II QS 627/727 Documentation-based Process Improvement

QS 627/727 ► Team members: ► Walter Chrysler ► Janett Gray ► Patrick Hanley ► Joseph Mainoo ► David Mueller ► Kevin Van DeWark

Project Background ► A team-based problem solving project with three objectives to meet. The team is located in various locations which creates the need for e- communication. The use of online tools such as those used in the ITTTM allow for effective communication. ► The team decided to research the use of the SMED (single minute exchange of dies) methodology within the service industry to reduce lead times in services being provided. The real question is whether or not the SMED principles can be utilized in the service industry.

Project Problem Statement ► Development of the SMED (Single Minute Exchange of Dies) concept for use in the service industry. The SMED concept is the efficient, seamless process of system startups and changeovers, resulting in optimization of cycle time and increased productivity; creating value by eliminating wasted time – a foundation of Lean manufacturing. The hotel service industry, specifically, room change-over will be used to illustrate the designed system created.

Project Objectives ► Objective 1: Literature review of the SMED concept ► Objective 2: Adapting the SMED for use in the service industry, illustrated in hotel service of changing over of guests ► Objective 3: Completion of Tools 19 – 24 of the ITTTM courseware and toolkit

Project Research Methodology: ► The research methodology to be used is that of using the team to complete each element of the toolkit studied, applying each to the defined team project and the transference of knowledge from the courseware evidenced in the completed project output portfolio.

Toolkit Used ► Industrial Technologists’ Toolkit For Technical Management (ITTTM). ► Regular critique assessments (RCA) and standard dedicated assessments (SDA) are part of ITTTM courseware systems ► Filling the forms (RCA’s and SDA’s) and the literature in long and short form assisted in developing the project

Toolkits of the ITTTM ► 19: "Kaizen Documentation Foundations For Data Driven Process Variation, Waste Reduction, Lean Six Sigma" ► 20: "Basic Economic Considerations, Cost Related Documentation Kaizen, Lean Systems, Quality Relationships" ► 21: "Ongoing Process Control Plan (OPCP), Standard Operating Procedures (SOP): Infrastructure For Understanding Process"

Toolkits of the ITTTM ► 22: "Synchronous Production: Enhanced Best Practices, Change, Lean" ► 23: "Failure Mode And Effects Analysis (FMEA), Quality Functions Deployment (QFD), Reliability, Robust Problem Solving" ► 24: "Total Productive Maintenance, Safety And Ergonomics: Re-engineered Lean Environment"

Project Management Tools ► Various tools utilized to keep the team on track for project completion ► Focused team on project objectives, timeline, and deliverables

Project Management Tools  PPARMP - Project Portfolio Assessment, Research Methodology Plan  PPMTA - Portfolio Presentation Management Team Assessment  OPCP - Ongoing Process Control Plan  SOGA - Standard Operation General Analysis

Project Management Tools  ISOQSAOPP – ISO/QS Audit, Objective Prioritization Plan  GOTA – Glossary of Terms, Applications  DSDC – Documentation System Design, Communication

Project Enhancing Tools ► Various tools that lead the team to discovery of methods for the SMED principles to be utilized in the hotel industry  These included focusing on the following: ► Reviewing literature on the subject of SMED and the hotel industry ► Costs associated with change and innovation ► Methodology for change including potential problems and corrective actions

Project Enhancing Tools ► Standard Operating Procedures; including customer demand, time analysis, development of better ways of completing tasks ► Benchmarking best practices from within the organization and through industry practice ► Auditing ► Safety ► Customer satisfaction ► Potential failures and corrective action

Project Enhancing Tools  ROLDA – Review of Literature, Documentation Assessment  KCA – Kaizen Cost Analysis  MAACE – Methods Analysis and Cost Estimates  GCA – General Cost Analysis

Project Enhancing Tools  SOPATA – SOP and Takt Analysis  TAMA – Time and Method Analysis  OCA – Operation Capacity Analysis  GBAPS – General Benchmarking/Auditing Process, Systems  CEAS – Characteristic Evaluation and Audit System

Project Enhancing Tools  FMEA – Failure Mode and Effects Analysis  QFD – Quality Function Deployment  GSICPC – General Safety Inspection Checklist/Pareto Chart  MTA – Maintenance Tracking Analysis  GFAPS – General Failsafing/Auditing Process, Systems

Tying the Tools to SMED ► One of the fundamental principles of SMED is the reduction in lead time to change a process. Applied to the hotel industry this means checking a new customer in after the previous customer leaves in the minimal amount of time. ► The Tools provide the documentation procedures to focus the organization on change, innovation, and continuous improvement; thereby leading to potential reductions in lead time.

Tying the Tools to SMED ► Through documentation, organizations can focus on tools such as SMED (at least the principles of SMED for the service industry) to make improvements in lead time, efficiency, customer service, and quality. Documentation provides the methods by which organizations share knowledge – the sum of the whole is always greater than the greatest individual part.

Recommendations for the Hotel Industry ► As a part of the project the team has developed some recommendations for the hotel industry. It should be noted that these are only recommendations and have not been field tested.

Recommendations for the Hotel Industry ► Use of wireless communication devices  Implement the use of electronic wireless IPAC devices for communicating needs to a central base, from the housekeeping staff to supply areas, to management, to check staff scheduling and real-time notification of rooms cleaned & ready.  Eliminates time needed to go get other supplies  Communicate the room is ready, sooner  Miscellaneous elements are eliminated from the housekeeping staff’s focus of getting the room ready; reducing interruptions which is a leading cause of reduced startups.

Recommendations for the Hotel Industry ► Standardization of work  Develop best practices for cleaning room, to include areas to clean first. ► Write associated standard operating procedures (SOP) ► Train to the new procedures ► Also develop and train to SOPs on the defined method for stocking carts and storage area.  Supplies used ► Standardize the type of products used; limit suppliers and products ► Standardize the way tools and supplies are arranged on the carts used to carry tools and supplies ► Optimizing restocking time, whereby the carts are ready at start of work each daily, eliminating delays in startup.

Recommendations for the Hotel Industry ► Monitor, at established periods  Ensure noted enhances have occurred, are effective and sustained.  Assess of safety concerns.  Evaluate appliances in room to make sure they are working; include assessment of light bulbs.

Recommendations for the Hotel Industry ► Training  Develop training for staff to enhance their abilities to improve the methods in which their jobs are completed.  Develop incentives tied to suggestion program that will increase involvement of all staff to add to continuous improvement efforts.  Document all training involved in the process; audited at appropriate times to ensure accuracy.

Recommendations for the Hotel Industry ► Documentation required and essential for all elements.