EU Design Study Kickoff Meeting GSI 15.4.05 U. Raich CERN AB/BDI Digital Signal Analysis for BPMs The Project –Measure beam trajectories and orbits in.

Slides:



Advertisements
Similar presentations
22-23/06/20093 rd Libera Users Meeting, ESRF1 3 years of experience of Libera BPMs at SOLEIL Nicolas HUBERT Synchrotron SOLEIL On behalf of Diagnostics.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
LAPP electronics developments Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC WS 12-16/10/2009.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Question : Are children who have been to learning camps “ahead” as compared to those who have not been to learning camps? Using the existing random sample.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
31st July 2008AIDA FEE Report1 AIDA Front end electronics Report July 2008 Progress Virtex5 FPGA choice Milestones for prototype delivery.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
AGATA Pre-processing team report AGATA Week, July 2008.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
BPM System Status P. Cameron 13 Aug 07. Outline 1.Notes from NSLS-II Design Review (last Thursday) 2.System Block Diagram 3.Process Variables 4.DAQ status.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Status of QUACO project
6 Oct 2003Vince Pavlicek1 Make a BPM out of a Damper?
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
The FGClite Project Status Update and Requirements R2E Extended Project meeting TE-EPC-CC R2E Team.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Converter Regulation Board Status WP PO 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1.
Injector RF and Synchrotron RF Present Status, Activities, Plans PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
ECE 477 Final Presentation Team 13  Spring 2012 Martin Pendergast, Stephen Edwards, Nick Kwolek, David Duelmler.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
TPC electronics Status, Plans, Needs Marcus Larwill April
BPM stripline acquisition in CLEX Sébastien Vilalte.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
Context of CERN-LAPP collaboration HS,
U. Raich CERN Accelerator School on Digital Signal Processing Sigtuna Digital Signal processing in Beam Diagnostics Lecture 1 Ulrich Raich CERN.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
PACMAN : technical objectives Hélène Mainaud Durand.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Status of CEPC Beam Instrumentation Study Ma Huizhou On behalf of CEPC BI Group Beijing, China
FONT5 digital feedback boards
Digital Signal processing in Beam Diagnostics Lecture 2
Work on Muon System TDR - in progress Word -> Latex ?
CMS Luminosity Status Report
Brief Status SPS Prototype PSB Prototype Installed in LS1
R&D activity dedicated to the VFE of the Si-W Ecal
Document Plan & Milestones WP7
Overview of the project
The ELENA BPM System. Status and Plans.
P. Forck, P. Kowina, M. Schwickert, R. Singh
Ongoing BE-BI developments going to be exposed to radiation
M. Mehler1), H. Klingbeil1), B. Zipfel2)
FEE Electronics progress
TSF Upgrade Project Overview Resources Plans and Timetable
Status of CC-PC Evaluation Board
RTL Design Methodology
VME64x Digital Acquisition Board
Elettra – Sincrotrone Trieste S.C.p.A.
Presentation transcript:

EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Digital Signal Analysis for BPMs The Project –Measure beam trajectories and orbits in hadron machines –Specific problems: Varying revolution frequency, changing harmonic number The Principle –Fast digitization, signal treatment on the fly using FPGA and big memory

EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Block Diagram of Electronics Amplifier + shaper PU RAM Fast Sampling ADC ΔxΔx FPGA controller Communication to accelerator Control system Σ ΔyΔy

EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Digital Signal Analysis for BPMs GSI SIS18CERN PS

EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Project History (Pre-Phase) End 2003: First ideas, CERN contacts with Instrumentation Technologies (IT) Jan 2004: R&D contract of CERN with IT delivery of prototype Libera electronics (pre-version) GSI had similar plans, decided collaboration March 2004: Andreas Galatis as PhD student hired by GSI June 2004: CARE-HHH-Workshop on Hadron BPM signal treatment in Aumühle (Hamburg) Mid July 2004: Visit to IT (Jeroen Belleman, CERN) Measurements on CERN PS with fast ADC card + PC

EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Project History – (Pre-Phase) II Measurements on GSI SIS18 with fast ADC card + PC Oct 2004: Collaboration Meeting GSI + measurements with Libera and fast ADC + PC Some problems on pre-version Libera were solved (trigger), some remained (memory access) Nov. 2004: Measurement on CERN PS, Libera pre- version works ok as fast chart recorder From Nov 2004 to now: Data evaluation + development of signal processing algorithms (base line correction, bunch synchronisation). This is done offline (C-programs)

EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Going on at the moment At CERN a “market survey” + tender is needed in order to get acceptation by council. Continued work on offline signal processing algorithms at CERN and GSI in collaboration with TU Darmstadt First tests on implementation in the FPGA using VHDL simulation on measured data Hiring of a technical student (M. Stuckert) at CERN for the implementation work, hiring a technical engineer (K. Lang) at GSI.

EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Work Plan Next WP meeting mid-May in Slovenia (IT) Until October 2005: Refinement of algorithms, implementation in VHDL + simulation, timing checks, interfacing to IT’s VHDL code End 2005: Another measurement session using online signal treatment at GSI (2006: CERN) (CERN) Tender for acquisition of 50 digital treatment electronics cards/boxes. 2006: Definition of data layout in memory, interfacing to the accelerator control system at CERN Installation and commissioning of final system at PS