Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 December 2003 run results Philip Burrows.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
NLC - The Next Linear Collider Project Intra-Pulse Feedback at the NLC Interaction Point Steve Smith SLAC Snowmass 2001.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Phase Feed-Forward Piotr Skowroński (CERN)
Dither Luminosity feedback versus Fast IP feedback
Progress towards nanometre beam stabilisation at ATF2
Intra-Pulse Beam-Beam Scans at the NLC IP
Progress towards nanometre level beam stabilisation
Feed forward orbit corrections for the CLIC RTML
Presentation transcript:

Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University

Philip Burrows ATF2 project meeting 14/1/112 Outline Conceptual system design General considerations for IPFB system Working assumptions Reminder of latency issues Requirements on BPM signals Summary

Philip Burrows ATF2 project meeting 14/1/113 KickerBPM Digital feedback Analogue BPM processor Drive amplifier e- FONT system loop (schematic)

Philip Burrows ATF2 project meeting 14/1/114 KickerBPM Digital feedback Analogue BPM processor Drive amplifier e- FONT5 system loop (schematic)

Philip Burrows ATF2 project meeting 14/1/115 KickerBPM Digital feedback Analogue BPM processor Drive amplifier e- FONT5 system loop (schematic) There should be no problem (in principle) to build a similar system for operation at the ATF2 IP

Philip Burrows ATF2 project meeting 14/1/116 New kickerIPBPM Digital feedback IPBPM electronics New drive amplifier e- IP system loop (schematic)

Philip Burrows ATF2 project meeting 14/1/117 Major challenge From our perspective, the feedback should be straightforward! Biggest challenge will be to obtain a 1-nanometer-level position signal from the IPBPMs, in multi-bunch mode Current ‘world record’ is about 8nm in single-bunch mode (Honda-san)  see Boogert’s + Joshi’s talks of yesterday, and next talk from Kim-san

Philip Burrows ATF2 project meeting 14/1/118 General considerations Many details need to be worked out: Configuration of IP BPMs Location (lever arm) and length (kick) allowed for kicker Kicker aperture (amplifier power) Dynamic correction range required (amplifier power) Details of cabling (latency): IPBPM  IPBPM electronics  FONT Output signal of IPBPM electronics (latency, digitisation)

Philip Burrows ATF2 project meeting 14/1/119 IPBPM configuration

Philip Burrows ATF2 project meeting 14/1/1110 IPBPM configuration

Philip Burrows ATF2 project meeting 14/1/1111 Kicker location

Philip Burrows ATF2 project meeting 14/1/1112 Some working assumptions (1) Kicker centre ~ 0.5m upstream of IPBPM Kicker aperture 40mm (?) Kicker length ~ 15 cm (?) Matched 50 Ohm terminations  Half of current FONT5 sensitivity: 0.5 urad / Amp (can easily scale from above assumptions)

Philip Burrows ATF2 project meeting 14/1/1113 Some working assumptions (2) Dynamic correction range: Beam size 37 nm Beam y jitter ~ beam size (?) 2 sigma correction  70 IP = 140 nrad kick  drive current = 0.15/0.5 ~ 0.3 A (per strip)

Philip Burrows ATF2 project meeting 14/1/1114 Some working assumptions (3) Amplifier: Peak power = 0.3 **2 x 50 = 5 W per strip  eg. Minicircuits: 10W, 5  500 MHz Low latency (5 ns) Output can be pulsed for long bunch train No margin for kick

Philip Burrows ATF2 project meeting 14/1/1115 Caveat If the IP beam size, and hence the beam jitter, were significantly larger, the amplifier power requirements would be more serious, and the latency correspondingly longer … Present FONT amplifier provides 30 urad kick and takes 35ns to do so!

Philip Burrows ATF2 project meeting 14/1/1116 IPBPM electronics (Aeyoung Heo)

Philip Burrows ATF2 project meeting 14/1/1117 Digitisation of IPBM signal Digitise I and Q signals Derive amplitude and phase  charge-independent position signal FONT5 ADCs (TI ADS5474) clocked at 357 MHz Very high bandwidth sample point Sample time adjustment sensitivity c. 100ps

Philip Burrows ATF2 project meeting 14/1/1118 FONT Digitisation IQ Joshi

Philip Burrows ATF2 project meeting 14/1/1119 Digitisation of IPBM signal Digitise I and Q signals Derive amplitude and phase  charge-independent position signal FONT5 ADCs (TI ADS5474) clocked at 357 MHz Very high bandwidth sample point Sample time adjustment sensitivity c. 100ps Up- and downstream IPBPM signals needed

Philip Burrows ATF2 project meeting 14/1/1120 Latency estimate Amplifier (as described) 5ns Kicker fill (15cm) 0.5ns Beam flight time amplifier  IPBPM 2ns Cables (3 x 1.5m?) 23ns IPBPM electronics40ns? Digital processing60ns Total 131ns

Philip Burrows ATF2 project meeting 14/1/1121 IPBPM signal requirements Prefer ‘baseband’ signal could deal with up to 100 MHz Ideally I, Q signal levels ~ 100 mV could deal with almost any power levels (by amplification) Met with Kim-san at KEK Dec 2010

Philip Burrows ATF2 project meeting 14/1/1122 Summary Conceptual design for IP FB system System parameters look feasible Critical parameters: dynamic correction range, bunch spacing Digitisation of IPBPM I and Q signals is easiest approach Technical details need to be finalised: locations of BPM + kicker, kicker aperture, cable runs …

Philip Burrows ATF2 project meeting 14/1/1123 Postscript 1 Intra-train beam feedback requires extremely high degree of spatial correlation between the bunches With the current ATF2 setup (existing kicker system and 3 bunches) we occasionally see good correlations, usually after a lot of tuning  see my talk of yesterday May be better off extracting just 2 bunches?

Philip Burrows ATF2 project meeting 14/1/1124 Postscript 2 The hard part of the IPFB is achieving nanometer position resolution with the KNU BPM electronics …