CLIC Cost at 3 TeV and 500 GeV CDC meeting, 9.12.2008 Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.

Slides:



Advertisements
Similar presentations
COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 WP 4 – DATA HARMONISATION London, 5 – 7 September.
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
ToolPack Milestones, Documentation, and Support Strategy Nada Hamadeh World Bank ICP Regional Coordinators Meeting 30 September 2004.
Project Costing Tool EUROnu Annual Meeting – 3rd June 2010 Jurgen De Jonghe / Benoît Daudin – CERN, GS-AIS-PM.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Costing the Target Ajit Kurup May 17, Page 2 Costing the Target Ajit Kurup Costing of the target for the RDR needs to be done using the CERN costing.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Common Data Index CDI V1 How to proceed By Dick M.A. Schaap – technical coordinator Madrid, March 09.
CLIC-ILC Cost & Schedule Working Group Meeting TILC09 – Sunday, April 19, 2009 reported by Peter H. Garbincius CLIC_ILC_phg_21april09.ppt.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
CLIC-ILC Cost & Schedule Agenda – 8feb08 John Carwardine = secretary & rapporteur this file: & Schedule Sub-Group.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
1 Update on cost-related issues Philippe Lebrun Joint CLIC-ILC meeting on costs CERN, 12 June 2009 Peter’s notes: Thursday, 16july09 PHG - 16july09: added.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Agenda : CLIC Civil Engineering and Services (CES) WG.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
1 Tunnel implementations (laser straight) Central Injector complex.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CLIC cost drivers Philippe Lebrun on behalf of the C&S WG CLIC Technical Committee 3 November 2009.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
Jurgen De Jonghe CERN/IT-AIS Administrative Information Services Cost Estimate Tool For CLIC Jurgen De Jonghe CERN / IT-AIS
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
CLIC C&S WG meeting, 24-Feb-2011, B. Daudin 1CLIC C&S WG, 24-Feb-2011.
Update on cost-related issues Philippe Lebrun Joint CLIC-ILC meeting on costs CERN, 12 June 2009.
CLIC08 workshop Cost requirements for CLIC H. Braun, G. Riddone
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
CLIC Civil Engineering Update
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
Managing the Project Lifecycle
CLIC module working group
DOCUMENTATION DEVELOPMENT LIFE CYCLE (DDLC)
Input to Strategy currently planned
CLIC-ILC Cooperation ILC “PAC Review” – Vancouver May 9, 2009 Conventional Facilities Cost & Schedule Working Groups reported by Peter H. Garbincius.
ILC GLOBAL SYSTEMS MEETING
CLIC Civil Engineering Update
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Software Development Process
ToolPack Milestones, Documentation, and Support Strategy
Presentation transcript:

CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John Andrew Osborne, Germana Riddone, Pierre Strubin and Sylvain Weisz - Cost estimate at 3TeV & 0.5 TeV distributed according to PBS - Status and plans of cost study 1

activities of CLIC cost & schedule WG Established PBS Reorganized 2007 estimate to adapt it to PBS (incl. CTC modifications) Scaled estimate to 500 GeV version Established specifications for cost estimate software tool (see EDMS#975066) Launched development for cost estimate software tool in IT / AIS Established template and organization structure for cost database input Established schedule for underground construction and installation Established coloaboration with ILC cost WG. Presently mostly on exchanged of informations.

3 CLIC material cost estimate for 0.5 TeV and 3 TeV Estimate basis is same as end 2007, but adapted to new PBS structure Scaling to 0.5 TeV for time being very simplistic & optimistic

4 CLIC material cost estimate main beam for 0.5 teV and 3 TeV relative to 3 TeV total Estimate basis is same as end 2007, but adapted to new PBS structure

5 CLIC material cost estimate drive beam for 0.5 teV and 3 TeV relative to 3 TeV total Estimate basis is same as end 2007, but adapted to new PBS structure

6 CLIC material cost estimate CE and Services for 0.5 teV and 3 TeV relative to 3 TeV total Estimate basis is same as end 2007, but adapted to new PBS structure Scaling to 0.5 TeV for time being very simplistic & optimistic

Cost tool Standardised EXCEL template to provide input Development of tool at CERN using Excel DBE, oracle database and web interface similar to existing CERN management tools (M. Draper, J. De Jonghe) – first prototype ready by 2 nd quarter 2009 – final version by end of

Input Template 1/3 8

Template 2/3 9

Template 3/3 10

Definition of roles Role of the coordinator (PBS, levels 2 and 3) – Gather technical specifications, total numbers, delivery schedule – Cost estimate from experts based on cost template – Provide preliminary levels 2 and 3 estimates (even when level 4 is not available) – Filling template for level 4 estimate based on input from experts – Archive the system filled templates in EDMS Role of experts – Provide cost estimate input for the related system (PBS level 4) Role of accountant, M. Draper – Put all the numbers together 11

PBS levels 2 and 3 cost coordinators 12

PBS level 4 experts 13

PBS comparison CLIC ILC 14

15

16

Cost & Schedule Future work Schedule for PBS level 2 areas (K. Foraz) Preparation of templates (coordinators) – Schedule information – Number of units Filling of template (coordinators) with input from experts (archive in CERN EDMS structure) Selected area estimates - 2-beam module to be ready by Jan 09 - BDS based on ILC estimate Full cost estimate to be ready by end of 09 Tool development in 2009 (prototype by 2Q 09, final version by end of 09) Continue exchange with ILC colleagues (next WEBEX this Thursday) 17

ILC-CLIC cost & schedule WG 18

Documentation 19 Main documents available in EDMS “Restricted access”