CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
CDM METHODOLOGIES IMPROVEMENT 7 th CDM Joint Coordination Workshop th March 2011, Bonn, Germany Anne-Sophie Zirah - March 2011.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
CDM Baseline, additionality, leakage and monitoring plan Executive Training on the CDM, Jakarta
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
UNFCCC Secretariat SBL submission options Landfill sector: methane destruction + energy generation Karla Solís Team Lead Regional Collaboration Centre.
A practical overview from planning to practice on the destruction of methane generated from manure in piggeries. Source: Clean Energy Regulator (CER) July.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Accessing Carbon Finance Case Study: CDM and Energy Efficiency Hakim Zahar, P.Eng. Vice-President ECONOLER INTERNATIONAL February-March, 2007.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
LANDFILL-GAS-TO-ENERGY PROJECTS: AN ANALYSIS OF NET PRIVATE AND SOCIAL BENEFITS By: Paulina Jaramillo.
Energy Management in Brazil August 9th, 2011 Rio de Janeiro | RJ By: Pedro Paulo da Silva Filho | Grupo SAGE Desenvolvimento: SAGE US – Brazil Industrial.
CDM PoA Development Case Study: Morocco Municipal Solid Waste.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
CD4CDM - RW4 Tunis, August Capacity Development for CDM Additionality Analysis Vale Do Rosario Bagasse Cogeneration (VRBC) Project - Brazil.
Djerba Carbon Exhibition Djerba, September 22-24, 2004 Onyx Gas Capture and Flaring ProjectOnyx Gas Capture and Flaring Project Alexandria, Egypt Amr Abdel-Aziz,
The First Carbon Exhibition
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
Examples on how the additionality is addressed in the three Projects approved by the National CDM Council in Morocco (DNA) Important Issues to address.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities Review of approved and proposed.
The Role of the Designated National Authority (DNA) in preparation of CDM Projects 1 Designated National Authority for the Clean Development Mechanism.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
Capacity Development for CDM Project Presentation of Selected PDD Methane capture and combustion from swine treatment for Peralilo By Kwaku Wiafe Senior.
Baseline Cairo, March 31 & April 1, 2004 TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEXPotential CDM Project for a Landfill in.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Methodologies for Moldova Soil Conservation project ARNM0007 Rama Chandra Reddy July 12, 2005.
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
THE WORLD BANK World Bank Experience in Landfill Gas and Prospects for Indonesia Dr. John Morton Environmental Specialist The World Bank East Asia and.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
Permit supply from the CDM Nico van der Linden ECN Policy Studies, the Netherlands.
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1 st 2 methodologies recommended for approval by the Meth Panel, July 2003.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, Sn. Environmental Specialist. Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
How much technology transfer takes place in the CDM? TETRIS conference, Brussels, November 30th, 2006 Heleen de Coninck.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
“The World Bank – Italian Trust Fund for Environmental Protection in CHina” Technical Meetings – Beijing – January 23-24, 2006 Climate Changes Related.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
CD4CDM Capacity Development for the Clean Development Mechanism CDM Baseline and Monitoring Training Course 17 th July 2003 Walter Hogan Conference Center.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
Seite 1 Seite Seite 1 CDM in Egypt Potentials and Projects Presentation by Dr. Paul H. Suding, GTZ MENA Carbon Forum 2009 Cairo,
How to Develop Landfill Gas CDM Projects with Local Municipal Authorities? Kok Kee Chow, Managing Director, Sustainable Technology Resource Centre STREC.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology
Energy performance and Carbon emissions Assessment and Monitoring tool
Presentation transcript:

CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

Description of the project activity Description of the project activity The Project is located in the Municipality of Salvador da Bahia, Brazil The Project involves installing equipment for methane destruction with capacity of 6,250 m 3 /hr in 2000 (expanding to 46,250 m 3 /hr in 2020). The equipment will consist of enclosed flaring with controlled burning condition.

Anthropogenic emission of GHG at Salvador Landfill occurs when methane produced at the landfill is not destroyed; The proposed project activity pretends to better the landfill gas capture and destruction efficiency by increasing the total amount of gas to be destroyed over the amount determined by the landfill concession contract. How the anthropogenic emissions by sources are to be reduced by the proposed CDM project activity.

Landfill contract barriers to investment: The Salvador municipality established the maximum price to be paid for the landfill activity in 1999 at R$/ton (5.6 US$/ton). The winning price Vega has proposed was 15.86R$/ton (5.3 US$/ton). This includes landfill design, licensing, construction, operation and aftercare for a period of 20 years.. Why the emission reductions will not occur in the absence of the proposed activity?

There was no specific requirement on gas management. Any investment or operation to destroy more than the contractual amount is additional and will not have other form of remuneration other than the CERs. Why the emission reductions will not occur in the absence of the proposed activity?

National and sectoral policies Typical recovery of methane or biogas is minimal and there is no regulatory requirement governing its recovery. A conservative estimate of 20% recovery of methane gas for passive system has been considered as the best practice based on a waste management study. Why the emission reductions will not occur in the absence of the proposed activity?

Baseline: Concession agreement between VEGA and the Municipal Government of Salvador da Bahia –Capture and destruction rate of 19-24% of the methane that will be generated from the entire landfill CDM Project: Collection system and destruction capacity will be expanded and improved so that an estimated 75-80% of the methane will be destroyed Project Additionality Assessment

Procedure: Investment analysis –Baseline has a higher NPV Baseline has NPV > 0 –Concessionaire is paid fixed fee per ton of waste entering the landfill covering all construction and operating cost Without CERs, CDM Project has NPV < 0 –If there are no CER revenues, concessionaire will not receive additional revenue (from the present contract) to improve significantly landfill capture and destruction efficiency which will be costly Project Additionality Assessment

CERs Project Contract CDM Project No CERs Baseline 0 NPV

Gas capture and flaring is not conducted in more than 90% of Brazilian landfills. The Salvador de Bahia Landfill as designed by VEGA is probably the only municipal landfill in Brazil that respect European technical standard in relation to bottom lining system, complete drainage layer and water management. The project is The Best Practice on the matter. Discussion on the conservatism of the baseline methodology when applied to Salvador project.

Description of how the definition of the project boundary related to the baseline methodology is applied to the project activity: All of the generation of waste occurs locally, within the confines of the country. The Baseline Study has not found leakage since the project is a closed system. Two potential sources of emissions were identified and were assessed immaterial

This methodology is applicable to landfill gas capture and flaring project activities where: There exists a contractual agreement to capture a certain volume of biogas from a landfill; The concession obligation stipulate the amounts of landfill gas to be collected by the concessionaire; Given the possibility of generating electricity from captured landfill gas, there should be no electricity generation planned. Evaluation of Meth Panel on the proposed new methodology

The project used economic or financial analysis to establish project additionality. The approached used in estimating the baseline emission is paragraph 48 (b) of the CDM modalities and procedures. It is assumed that the contractual obligations of the concession contract define what an “economically attractive course of action” is. The methods for computing the baseline emission have been clearly defined. However, several refinements were made to arrive at a more conservative calculation. Summary

The boundary is the whole country and there is no leakage considering that the project is a closed system. The project emissions has been transparently and consistently estimated because the main source of data for the determination of the baseline is the contractual agreement between the project participants and the government agency. However, it has been recommended that the contract be made publicly available. Summary

References were given for data and information used. ] The PDD can be recreated in terms of baseline scenario, project boundary and sources of GHG emissions. However, it is difficult to compute for the annual baseline emission considering that the annual actual percentage of LFG to be captured is difficult to estimate. The concession contract provides for a % capture of LFG. Summary

Marina T. Mallare Klima Climate Change Center Manila Observatory Tel. No :