TFMA 2007 Freeboard Survey Special Acknowledgement To Charlie Hastings PE, CFM, who initiated the 2004 Survey and TFMA members that participated.

Slides:



Advertisements
Similar presentations
Project Name Location Category of Entry Award Type Firm Name 2011 CEFPI North East Region Exhibition of School Planning and Architecture.
Advertisements

Austin, Texas 2013 CEFPI Southern Region Conference.
Regulations and Processes for Floodway/Non-Encroachment Area Encroachments. What to look for and what to require. Robert Billings, PE, PH, CFM Mecklenburg.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
Flood Damage Prevention Ordinance.  Legal means for communities to set standards for regulating floodplain development  Dependent upon type of mapping.
Ninth Annual TFMA Freeboard Survey Special Acknowledgement To Charlie Hastings PE, CFM, who initiated the First TFMA Survey in 2004.
Managing Zone A Floodplains
General Provisions Affordable Housing Signs Transfer of Development Rights 2009 ULDC Update September 8,
Springettsbury Township STORMWATER AND HOW IT AFFECTS YOU February 19, 2013.
Shale Gas Drilling County-wide SURFACE DRILLING CONSTRAINTS SPATIAL ANALYSIS EXERCISE.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
Flood Plain Permitting This Power Point is a collection of real life examples of requests submitted to the Jefferson County Planning and Zoning Department.
NYS Department of Environmental Conservation The National Flood Insurance Program A Program Overview.
1 WELCOME MAP “TUNE-UP” WORKSHOP September 19-20, 2007.
May 22, 2012 ASFPM - San Antonio Mike Moya, PE – Halff Associates Brian Reis, PE – RPS Espey Brian Wells, PE – MWM Design Group.
NATIONAL FLOOD INSURANCE PROGRAM Carol Tyau-Beam, P.E., CFM State NFIP Coordinator Department of Land and Natural Resources, Engineering Division Honolulu.
Shale Gas Drilling Deep Creek watershed SURFACE DRILLING CONSTRAINTS SPATIAL ANALYSIS EXERCISE.
A Simplified Method of Implementing No Rise Analysis in Unnumbered A-Zones Based Upon No Loss of Conveyance Dwayne E. Culp, Ph. D., P.E., CFM Second National.
Maine Association of Mortgage Professionals
Missouri Certified Sites Program Missouri Department of Economic Development Presented By: Hal Van Slyck Program Administrator.
Stormwater Quality Enhancement
Osceola County Floodplain Program
Homepage To learn about eLOMA click on the ‘Learn about eLOMA’ link under the Tools For Professionals.
Flood Mitigation for Structures in the Gulf Coast Region Norma Jean Mattei, Ph. D., P.E. University Of New Orleans Special thanks to: Chris Jones, PE and.
Creating Depth Grid from a DFIRM FEMA Region VIII Mitigation GIS Team Wednesday, February 13, 2013.
Chapter 14 Legal Descriptions and Site Plan Requirements.
CRS AUDIT A STUDY ON TYBEE ISLAND’S CRS AND OPEN SPACE PROGRAM National Flood Insurance Program Community Rating System August 28, 2014.
Flooding & Drainage Committee May 16,  Participate in the National Flood Insurance Program (NFIP)  Participate in the Community Rating System.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
General Provisions Affordable Housing Signs Wildfire Mitigation Transfer of Development Rights 2009 ULDC Update.
Floodways, Do We Still Need Them? Presented at the TFMA Region 6 Inaugural Regional South Central Luncheon/Seminar- June 12, 2014, San Antonio, TX T. Lynn.
Presenter: James D. Nadeau P.L.S., C.F.M., C.F.S. Session 1: 8:45-10:00 AM Mortgage Loan Inspections vs. Boundary Surveys Session 2: 1:30-3:00 PM Understanding.
FEMA UPDATED FLOODPLAIN MAPS Public Works Department Stormwater Management Division August 5, 2008 FEMA UPDATED FLOODPLAIN MAPS Public Works Department.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Zoning Analysis Lot at Corner of Mason’s Isl Rd Harry Austin Dr The property is located at the corner of Mason’s Island Road and Harry Austin Drive near.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
Town of Kill Devil Hills Flood Plain Management & Regulations October 2007.
Request for Environmental Services (RES) Missouri Local Programs How to Complete The Request for Environmental Services.
Mike Buckley, PE Former FEMA Executive May 27, 2015 Istanbul, Turkey.
1437 SOUTH BOULDER AVE., SUITE 1080  TULSA, OKLAHOMA  (P) (F)  Garnett Regional Detention Facility:
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
Objectives At the end of this unit, you should be able to:
Gaston Wood Processing Facility Special Exception ZOX
Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County.
California Coastal Commission Appeal A-1-MEN (Wernette) De Novo Hearing.
Encore Trust California Coastal Commission Hearing June 12, Encore Trust Residence.
TOPICS IN LAND SURVEYING: SUBDIVISIONS TREC #7220 TIM HOWELL, RLS TREC INSTRUCTOR #1556.
An Overview of A-Zones vs. V-Zones An Overview of A-Zones vs. V-Zones M. Sean Welsh, CFM Assistant Flood Plain Administrator Galveston County.
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
Presenter: Tushar Solanki GIS Workshop Subdivision Design in the City of Wilmer.
1 Community Hydrology in a Watershed World The Fulton County Experience Amy Bergbreiter, PE, CFM Monica Urisko, PE, CFM.
S Bachmann Springs Phase One Subdivision Abandonment Request.
Permit Process & Application Guide
Item W16a February 8, 2012 CCC Hearing A-6-OCN (Altman) 1823 South Pacific Street City of Oceanside.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
City Council Workshop March 27, 2014 Debbie Vascik, CFM Cahoon Consulting.
MARLS Conference2012 The National Flood Insurance Program FEMA Elevation Certificate Marijo Brady P.E. CFM FEMA Region VIII
Park Land Dedication Guidelines. Purpose of the Presentation Outline the proposed process to provide guidance to the Park Board & City Council on the.
Unit 12: Course Summary. Objectives At the end of this unit, you should be able to:  Describe key content covered in the course.  Complete the post-course.
Prince George’s County Flood Forum March 23, 2017
Floodplain Management Program Benton County
Washoe County Board of Adjustment
FLOODPLAIN MANAGEMENT FEMA and the Florida Building Code
Oklahoma Department of Emergency Management
Tulsa's Risk MAP Program Goals
Regulation Amendment AM April 3, 2018.
Presentation transcript:

TFMA 2007 Freeboard Survey Special Acknowledgement To Charlie Hastings PE, CFM, who initiated the 2004 Survey and TFMA members that participated

“Work in Progress”  John Ivey, PE, CFM – Halff Associates  Lochen Wood, CFM – LCRA  Roy Sedwick, CFM – TFMA/LCRA

Questionnaire  Zone AE/VE - New construction must be elevated ___ feet above BFE as shown on FIRM.  Zone AE/VE - New construction must be elevated ___ feet above BFE determined by a study based on fully developed watershed (future conditions)

 Master Drainage Plan (MDP) developed for areas in and around the community using fully developed conditions, for areas the FIRM doesn't address.  Are Developers required to use the MDP BFE.  Zone A (un-numbered) - Developer must conduct a study to define the BFE. If development is greater than 50 lots or 5 Acres, whichever is the lesser. [60.3(b)(3)] Zone A (un- numbered)

 Developer must conduct a study to define the floodway boundary based on existing conditions.  Zone A (un-numbered) - Developer must conduct a study to define the floodway boundary based on fully developed watershed (future conditions)

 Floodway - no development allowed within ___ feet from the floodway boundary.  No fill is allowed in the floodway or floodplain without mitigation (No adverse impact).

Coastal (Zone VE) Requirements  V/VE Zone - New construction within Zone AE that is within ___ feet of the VE Zone boundary must be constructed to V Zone requirements. (Setback)  V/VE Zone requirements to elevate __ feet above the BFE

Requirements in Zones B, C & X  Zone X (Shaded) - New construction must be elevated ___ feet above natural grade or above the crown of the nearest street.  Zone X (Unshaded) - New construction must be elevated ___ feet above natural grade or the crown of the nearest street.  (Note – Friendswood requires +24” in X shaded and +18” in X unshaded)

Elevation Certificates  Elevation Certificate Requirements - (1) Submitted with initial permit application. Y/N (1) Submitted with initial permit application. Y/N (2) Submitted prior to forming/pouring lowest floor. Y/N (2) Submitted prior to forming/pouring lowest floor. Y/N (3) Submitted when structure is completed. Y/N (3) Submitted when structure is completed. Y/N (4) Required prior to issuing a CO. Y/N (4) Required prior to issuing a CO. Y/N

Community Rating System  Is your community enrolled in CRS? Yes/No  Current CRS Rating ___  CRS Goal: ___  How many CFM’s does your community have on staff? ___

Other Requirements  Detention (on site and/or regional)  Setbacks from FP and/or FW boundaries  CLOMR required before permit issued  No development in floodway  No development in floodplain  No Adverse Impact  Additional Wetland/wildlife requirements  Floodplain must be open space  Drainage easements must be dedicated to City  Other….

2006 Survey Results

Thank you for participating! Contact John Ivey at for copies