1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.

Slides:



Advertisements
Similar presentations
JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
ESODAC Study for a new ESO Detector Array Controller.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Ultrafast 16-channel ADC for NICA-MPD Forward Detectors A.V. Shchipunov Join Institute for Nuclear Research Dubna, Russia
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
LKr readout: present and future R. Fantechi 30/8/2012.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Understanding Data Acquisition System for N- XYTER.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
21-Aug-06DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver Long baseline neutrino experiment Fermilab (Chicago)
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
15 April 2008 B.Hallgren, M.Piccini and H.Wendler 1 A Proposal for the Readout of the NA62 LKr Calorimeter.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
29 May 2009 Henk Boterenbrood, Augusto Ceccucci, Bjorn Hallgren, Mauro Piccini and Helmut Wendler 1 The Calorimeter Recorder CARE.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
ROM. ROM functionalities. ROM boards has to provide data format conversion. – Event fragments, from the FE electronics, enter the ROM as serial data stream;
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
CTA Trigger and Integration Meeting, HU Berlin, /25/2016K.-H. Sulanke, DESY1 A Digital Trigger for CTA Cameras K.-H. Sulanke DESY.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Digital Acquisition: State of the Art and future prospects
DAQ ACQUISITION FOR THE dE/dX DETECTOR
LKr status R. Fantechi.
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
CoBo - Different Boundaries & Different Options of
Power pulsing of AFTER in magnetic field
Front-end electronic system for large area photomultipliers readout
LHCb calorimeter main features
Example of DAQ Trigger issues for the SoLID experiment
BESIII EMC electronics
sPHENIX DOE-SC CD-1/3a Review WBS 1.5.3: CalElec Digitizers
Presentation transcript:

1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler

1 April 2009 NA62 DAQ meeting2 Contents History (P253/NA48) & General Introduction LKr Consolidation, Smart Link Module (SLM) Calorimeter Recorder (CARE) Clock, Trigger, Slow control (Infrastructure), Crates, (PCs, etc.)

1 April 2009 NA62 DAQ meeting3 Liquid Krypton Calorimeter Prototype used in SPS Tests channels channels Nucl. Instrum. Methods Phys. Res., A 574, 3 (2007) Energy is contained in a cluster of ~ 100 cells P253 proposal 1990

1 April 2009 NA62 DAQ meeting4 1:st Readout Electronics of year 1990 Very large JFET from “BNL” B.Hallgren,G.Laverriere, "A modular 100 ns shaper and linear fanout", NA48 Note 91-9.

1 April 2009 NA62 DAQ meeting5 Present LKr Electronics readout principles Noise (MeV) Preamplifier 7.2 Shaper 3.5 Transceiver 2.5 Sum of above 8.3 (ADC 8.7b noise 1.0) (Coherent noise 0.5) Total 8.3 Typical noise per channel Σ noise / cluster = √ ( ) = 97 MeV Shower cluster with 100 cells gives (But e.g.1993 beam test >> 100 MeV!) Calorimeter Pipeline Digitizer =CPD All LKr electronics is in a Faraday Cage Coherent Noise < 10uV READOUT

1 April 2009 NA62 DAQ meeting6 Preamplifier output Transceiver output After differentiation ADC input signal LKr Analog Signal Processing (details) Undershoot! Baseline sampling needed. 2.5 us

1 April 2009 NA62 DAQ meeting7 The beam is not strictly time-bunched and therefore there is no synchronous time signal correlated to the occurrence of interactions. SPS not like LHC ADC samples are dependent on the phase between the clock and the signal. Digital filter is used to extract the time of arrival off-line (<100 ps).

1 April 2009 NA62 DAQ meeting8 CPD Analog Subcard = CPDAS 1996 Contains two custom circuits designed by NA48: KRYPTON 1.2 um BiCMOS gain switching, trigger stage, ADC control. MIGA 1um CMOS gatearray to handle the SRAM (divided into 200 us circular and 8k linear buffer). A typical event consists of 8 time samples of 12 bits. No trigger but a readout command (time stamp) has to arrive before 200 us. In the present module the readout of 512 words is in series and takes ~52 µsec! Very stable performance and enough spares available for at least 10 more years. (2 channels one on each side of the PCB)

1 April 2009 NA62 DAQ meeting9 CPD module CPDTR card Analog Trigger card CPDMAC card with FASTBUS interface (on rear) 32 x CPDAS card Analog Cards (Shaper, ADC, Memory)

1 April 2009 NA62 DAQ meeting10 LKr Physics Performance (with E in GeV) Energy, Position and Time

1 April 2009 NA62 DAQ meeting11 LKr Consolidation Status optical links broken with no spares available anymore!

1 April 2009 NA62 DAQ meeting12 LKr Consolidation During 2005 it become obvious that the LKr readout was “falling apart” and becoming in operational due to failing optical links. A crash program was initiated for the runs with the direct financial help by the directors Engelen and Lettow and resulted in the Smart Link Module (SLM). One SLM module can read a complete FASTBUS crate via LVDS links. The SLM (one board) consists of a FPGA, 1 GB DDR2 memory and Gigabit Ethernet with direct connection to a (small) PC-farm. Successful tests of the SLM modules were made in the runs. In October 2008 all of the old NA48 LKr readout was replaced with 28 SLM modules and a LKr new computer system. TBD more PC software and integration with rest of the system.

1 April 2009 NA62 DAQ meeting13 Smart Link Board

1 April 2009 NA62 DAQ meeting14 Rear of racks with 28 SLMsReadout Computers

1 April 2009 NA62 DAQ meeting15 The Calorimeter Recorder (CARE)

1 April 2009 NA62 DAQ meeting16 Calorimeter Recorder (CARE) Proposal Complete recording of all the data during one SPS burst. No triggers, only software readout requests via the GbE. This data is stored in on-board 16 or 32 GB DDR2 memory depending of the length of the SPS burst. Reuse the existing ~7000 CPDAS cards and the Analog Trigger cards. Only redesign the FASTBUS motherboard and digital board. Old and new CPDs should work in parallel in the same crate. Same clock features as the CPD with (Start of Burst) and End of Burst.

1 April 2009 NA62 DAQ meeting17 Based on the SLM design (4 per CARE) The readout is done with 4 x 1 GbE links = ~320 MB/s but can be stretched out over the full 16 or 32 sec of the burst as it is done with the SLM. The MIGA gatearray on the CPDAS card is read out directly at 120 MB/s (the SRAM is not used). Use 4 “SLMs” for the control and readout. The 32 CPDAS is connected to FPGAs via 32x1.2 GB/s LVDS links. CARE Proposal Design

1 April 2009 NA62 DAQ meeting18 Calorimeter Recorder

1 April 2009 NA62 DAQ meeting19 Top Bottom STATUS of the CARE project The design of the PCB of the motherboard and digital board has been going on since Jan 8 of The work is greatly simplified because the same person who made the CPD PCB 1996 is available. The start of the PCB Protype fabrication is planned for mid of May? Lattice is used instead of the ALTERA with direct support available from Sr. Engineer at Lattice in Munich. Lattice DDR2 IP block is the necessary features as block transfers. Of course the FPGA software is based on the SLM experience.

1 April 2009 NA62 DAQ meeting20 Moved to the CAREMB 4 x GbE

1 April 2009 NA62 DAQ meeting21 Clock, Trigger, Slow control

1 April 2009 NA62 DAQ meeting22 Clock requirements (identical to NA48) The NA48 clock system was designed for 960 MHz 8b FADCs by the Vienna group. CPDAS requirement are < 2 ps (rms) jitter (10 Bit 40 MHz) Distributed as 80 MHz to get 40 MHz with 50% duty cycle needed by the ADC. The LVDS Serilizers needs low jitter clock. But long term stability is also important because used as time reference!

1 April 2009 NA62 DAQ meeting23 (Trigger) No trigger needed! The bidirectional feature of the standard GbE can be used. An event at time x after the start of the Burst Signal is always stored at the same location in the DDR2 memory. The event is kept in the memory until it is overwritten during the next burst (16 or 32 sec). The CARE has analog trigger output signals which are used for the NA62 trigger processing.

1 April 2009 NA62 DAQ meeting24 Slow Control (DCS) The Embedded Local Monitor Board (ELMB) is used via the CAN field bus (ATLAS standard). The ELMB stores constants and loads the serial control of the CPDAS when a module is powered. Only new updates has to be done via CAN or GbE (e.g. after calibration). ELMB monitors the large number of voltages in the CARE module (due to special power supply distribution to limit the coherent noise). The loading of the FPGA uses the Lattice Golden copy technique. The configuration can be updated as with the SLM (read and write of the serial flash memory) with GbE.

1 April 2009 NA62 DAQ meeting25 (Infrastructure), Crates, (PCs, etc.) FASTBUS crates are available with spares. The old (mid 80s) Fastbus supplies should be replace with modern types, but the new CARE module prototype power consumption must be known. An offer from ELCOTRON SA exists. But there is always the problem of coherent noise and the cooling, so a very careful approach is needed. Ideally there should be a plug-in compatible model with new electronics inside but using the same mechanics!

1 April 2009 NA62 DAQ meeting26 New Power Supplies = VME compatible FASTBUS has 25 slots versus 21 for VME The CPDAS card is 4 mm too high to fit in 2U VME! Therefore 28 FASTBUS versus 38 VME crates! 2005 Prices! Offer 2008

1 April 2009 NA62 DAQ meeting27 QUESTIONS and COMMENTS?