P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.

Slides:



Advertisements
Similar presentations
Peter Shanahan – Fermilab1 (MINOS NearDet) Electronics Overview A heuristic, pedagogical introduction.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
P. Shanahan June 13, Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
N. Saoulidou, Fermilab1 Study of the QIE Response (Current Injection Mode) & development of diagnostic tools
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Peter Shanahan – Fermilab - Near Detector Electronics Status MINOS Collaboration Meeting University of Sussex Sep Near Detector Electronics.
P. Shanahan May 29, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since Dec review Near Detector Electronics production.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
N. Saoulidou, Fermilab1 Study of the QIE Response & Calibration (Current Injection CalDet & Development of diagnostic tools for NearDet N.Saoulidou,
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
Bill Raynor Naval Research Lab
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
LIU Wire Scanner Milestones June 2017
HF Test station at P5 A.Mestvirishvili.
LHCC referees’ questions, comments, requests
Mini-drawers, FE-ASIC , Integrator
F.Guber, A.Ivashkin INR, Moscow
Chris Smith California Institute of Technology EPS Conference 2003
ScECAL+AHCAL+TCMT Combined Beam FNAL
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production Costs Peter Shanahan Department of Energy Review of the NuMI Project MINOS Parallel Session Nov. 15, 2003

P. Shanahan Nov 15, 2003 Page 2 Overview of 2.3 Status Schedule Status (BCWP/Total Budget): 96.7% complete Electronics, DAQ, and Database Steady progress on Data Acquisition, Detector Control System, and Database Thorough workout at CALDET Near Detector Electronics Near Detector – Assembly of all items wrapping up *Exceptions: MINDER crate, minor clock components Checkout in Progress

P. Shanahan Nov 15, 2003 Page 3 WBS 2.3 Accomplishments Since May 2003 Review MINOS WBS Milestones: WBS MS.7 Complete shipping for CALDET *completed on time, 7/10/03 WBS MS.2 Near Electronics Ready for Installation *completed 1 month early, 9/15/03 – includes equipment in use at CALDET Successful calibration run with Near Detector (ND) Electronics at CALDET First time DAQ used 2 ND readout crates Tested Spill Mode of ND FEE, and other features for 1 st time Assembly and checkout well along on all major components Exception: Problem with MINDER (“Front End”) Crate production

P. Shanahan Nov 15, 2003 Page 4 Upcoming Schedule Milestones WBS TaskScheduleFloat MS.4Electronics Production Complete – Near03/02/ d MS.8Begin Near FE Electronics Installation05/10/ d Grain of salt for Floats: MS.4 is last card completed – doesn’t distinguish 50% done from 99% done MS.8 allows for commissioning detector planes with electronics long after they go in

P. Shanahan Nov 15, 2003 Page 5 DAQ Progress and Status CALDET Run Major effort for DAQ group Experience being fed-back into planning for Near Detector Commissioning. Far Detector Data taking since 2001 Operations mode since August, 2003 Near Detector DAQ Workshop at RAL Scheduled for December to plan for intallation FNAL Control room has been commissioned Shifts taken for CALDET at CERN and FARDET

P. Shanahan Nov 15, 2003 Page 6 Near Detector Electronics MASTER Module MINDER Crate Trigger/Keeper MINDER modules MASTER Crate Component Count (not counting ~10% spares, light injection): 9328 MENUS 583 MINDERS 81 MASTERS

P. Shanahan Nov 15, 2003 Page 7 Near Detector Electronics Status Schedule Status (BCWP/Total Budget): 93% September 03 (85% March 03) Highlights Met CALDET schedule MENU production and checkout nearly complete MASTER, KEEPER, MINDER production 98% complete *Checkout held up on MINDERs for feedback from CALDET Issues MINDER (Front End) Crates *Poor mechanical structure in 1 st articles *Apparent resolution failed to translate into production quality. *End of CALDET travel will allow more focus on this problem

P. Shanahan Nov 15, 2003 Page 8 Near Detector Electronics Status

P. Shanahan Nov 15, 2003 Page 9 MENUs Earlier production problems resolved Checkout help from IIT undergrads High pass rate on checkout

P. Shanahan Nov 15, 2003 Page 10 CALDET Sept.-Oct side of each channel read-out with Near Detector Electronics Tested SPILL mode (continuous data taking for 10  s) Thorough test of system at 15% level Provided much feedback for diagnostics and firmware Time of Flight Cerenkov ,e,p Steel/Scintillator GeV/c

P. Shanahan Nov 15, 2003 Page CALDET Run Preliminary look at electrons in detector Compare sum of energy for Near Det and Far Det electronics, event-by-event With preliminary calibrations, ND and FD agree to <2% Expect improvements with full analysis P (GeV/c) FD-ND/0.5(FD+ND) Known miscalibrated channel causes this shift

P. Shanahan Nov 15, 2003 Page 12 Cost Variance in WBS 2.3 WBS has $384 K favorable cost variance $994 K in May 2003 review was known to be largely artificial *Due to statusing of production orders when placed Possible true favorable cost variances Estimated ~$140K on parts and assembly in May 2003 review *Now appears ~$100K. MENU Checkout *Faster, with less project labor than anticipated *Used existing components for much of teststand systems in budget. *Possible $100+K favorable variance

P. Shanahan Nov 15, 2003 Page 13 Budget Overruns Travel for FNAL engineers and physicists to CALDET: ~$20k Tech and Engineer Labor Clock system – possible c. $50k overrun Checkout of rest of system – implementing lessons learned from CALDET (may still be within budget) Other MINOR overruns We expect that these will be offset by true underruns.

P. Shanahan Nov 15, 2003 Page 14 Summary Great progress in WBS 2.3 since May 2003 Review Near Detector Front End Electronics reaching end of assembly NDFEE checkout well along CALDET RUN: *ND DAQ given thorough workout at CALDET *1 st Test of beam mode for NDFEE Data taking *Quality of data appears much better than 2003 Overall budget appears sufficient Need to clean up individual cost accounts for over- and under- runs