1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) NESCC Update: 7 November.
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
ASME SMR ROADMAP (STP-NU-072)
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
1 Current Reviews of Standards by NRC Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) November 7, 2013.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
Recently Issued OHRP Documents: Guidance on Subject Withdrawal and Draft Revised FWA Secretary’s Advisory Committee on Human Research Protections October.
Status of ANS Standards Presented to NESCC 3/1/2011 Donald J. Spellman Vice Chair, ANS Standards Board.
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) Co-Chairs: Dr. Stephanie.
ASTM International Nuclear Initiatives Roadmap Steve Byrne and Joe Koury March 2013.
Concrete Codes and Standards for Nuclear Power Plants (CTG) Chiara Ferraris, NIST Chairperson.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Seismic Instrumentation and Monitoring Needs of US Nuclear Power Plants Dr. Annie Kammerer Seismic Instrumentation Technology Symposium November 2009.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
JK August, ANS/Chair ANSI Washington DC March 28, /28/2013 NESCC Standards Meeting ANSI Washington, DC1.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
NRC Endorsement of Standards
Repair of Reinforced Concrete of Existing Nuclear Power Plants (RCTG) Chiara Ferraris, NIST Nathan Sauer, SIMCO Technologies.
0 PUT TITLE HERE Update on Capital Programs September 2008.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
November 7, Status * Concrete Repair Report was published in August * Included 40 recommendations for: * Revisions to standards. * New standards.
Mary Jane Ross-Lee, Chief Operating Experience Branch Tools Used to Collect, Screen, Communicate and Analyze Operating Experience (OpE) Data Improving.
Conservation Assessment Program (CAP) Completing the Site Questionnaire and Selecting Your Assessor.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
13 th Nuclear Utility Meteorological Data Users Group Meeting Lessons Learned From Establishing Design- and Operating-Basis Regional Meteorological Conditions.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Nuclear Energy Standards Coordination Collaborative (NESCC) November 29, 2012.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants March 28, 2013 Electrical Cable Task Group (ECTG) Lead: Dr.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) July.
RIC 2008 Power Reactor Security Requirements Rule Bonnie Schnetzler Team Leader, Security Rulemaking Team Division of Security Policy Office of Nuclear.
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
Community Development Block Grant (CDBG)Program Housing Rehabilitation Program Housing Assistance Plan (HAP) January 14, 2014 City Council.
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
Radiological Health Years in Review. Legislation 2001 General Assembly HB 1903 Health; radon programs SB 838 Health; radon proficiency listings.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
Transformation of DoD’s Value Engineering Program
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
What is the Home Care Referral Registry? The HCRR is a tool that you and your clients can use to search for and select eligible home care providers. The.
March 10, 2011 RITA’s Research, Development & Technology Knowledge Management System Alasdair Cain, Transportation Specialist, RITA Research, Development,
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Industrial Assessment Center Database
New TRACKS COI System: Committee Member Training Guide
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Adding Nuclear Power to the Grid
Thomas Koshy, On Behalf of Brian Thomas, Director
NERC Reliability Standards Development Plan
TRTR Briefing September 2013
New TRACKS COI System: Committee Member Training Guide
NERC Reliability Standards Development Plan
Chair, MAC Budget Subcommittee
Fundamental Science Practices (FSP) of the U.S. Geological Survey
Presentation transcript:

1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March 28, 2013

Purpose of the Database Develop a modern searchable relational database to catalog citations of consensus standards and various NRC guidance documents The database is intended to be used by the nuclear industry and NRC to assess currently cited standards to support certification of designs and development of licensing documents The database is intended to be used by Standard Development Organizations (SDOs) to identify where and which version of their standards are cited in regulatory documents 2

Background NRC funded NIST to develop a standards database in 2011; NIST funded a contractor for the work. The contractor conducted data mining of Regulatory Guides (RGs) to identify the standards and determine how they were endorsed or referenced. The number of pages in the RGs to be reviewed was voluminous. At the rate of data mining, the task would have taken several years to complete (and by then would have been somewhat out of date again). This was reported by the Standards Database TG at the July and November 2012 NESCC. In December 2012, NRC and NIST agreed to abandon the current approach. 3

Proposed Options The NRC believes this database would have value to both external stakeholders and NRC staff. Currently, the NRC staff is looking for other options to collect data and build this database. Option A: The NRC is exploring the possibility of doing the task in-house –Commercial contractor for data mining –Data mining tool thru the NRC’s Office of Information Services –Maintenance of database existing contract with IHS (Information Handling Services) –Funding under multi-year sequester a challenge Option B: A “Wiki” approach using “crowdsourcing“ from the SDO community – you! 4

A Pilot Effort to Collect Information from the Standards Database Task Group 5 Standards Development Organization NRC Regulatory Guides Standard included in the RG Latest Version of Standard No.No. RG No.DG No.TitleRev No. Rev. Date Fully Endor sed Partially Endorsed Referenced TitleDateTitle of latest Std.DateChanges of previous and latest Std. Std. SDO recommends for NRC endorsement Seismic Qualification of Electric and Mechanical Equipment for Nuclear Power Plants 39/30/ Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal System Pumps 011/30/ 07

Spreadsheet on Regulatory Guides and Standards 6 RGDraftRG IDRG #Guide #Title AAPM 13AAPM 21 ACI 201ACI 212ACI 301ACI Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal System Pumps Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Boiling Water Reactors

Spreadsheet on Matson Report 7 ****************DRAFT**************** Status of Selected Codes and Standards Referenced by Industry and the NRC ****************DRAFT**************** TitleIDStan dard Editi on Constr uction Subject Matter( s) Where Reference d (RG, SRP, IP, COL and DCD) Refer ence Date NRC Approved NRC Exceptions Where ReferencedRemarks Comments Clarissa NR C AP DC D AP CO LA GE DC D Dom inio n COL A ASTM C1602 / C1602M - 06 Standard Specification for Mixing Water Used in the Production of Hydraulic Cement Concrete Method of Test for Quality of Water to Be Used in Concrete AASHT O T-26 IP460517/1/19 83 This document is included as a reference but is not specificall y addressed as a comprehe nsive approved standard. 1 Current Status of Standard is unknown AASHT O LTS GE DCD 11 AASHT O LTS GE DCD 11

Requested Specific Information in the Spreadsheet from the SDOs NRC Regulatory Guides (left side of spreadsheet): a.The regulatory guide Information is provided to you by the NRC staff SDOs could identify standard(s) in the regulatory guide and answer the information in the spreadsheet: a.Was the standard(s) fully endorsed (check section C of the guide) b.Was the standard partially endorsed? c.Was the standard referenced in the guide? d. What is the Title and Date of the standard(s) as shown in the guide? 8

Requested Specific Information in the Spreadsheet from the SDOs SDOs could identify the latest version of standard(s) a.Title of the latest standard b.Date of the latest standard SDOs could record the changes from the version of the standard included in the guide and the latest standard SDOs could identify standard(s) that they recommend for NRC endorsement (choose top 5 standards) 9

Usage of the Information Post the spreadsheet on the NESCC and/or NRC web sites The NRC staff may submit the collected information to a contractor for further development of the database The NRC staff may use the information in house until funding becomes available 10

Questions 11